| 2022-03-31 15:26:19 | 1. PARTIALLY SATISFIED- PLEASE CONFIRM THE LISTED |
| | 356,864SF INCLUDES TRACK A AND B, AND LOT 7 AND 8. |
| | PREVIOUS COMMENT - PLEASE UPDATE SURVEY TO INCLUDE |
| | TOTAL SQUARE FOOTAGE OF PARCEL (TRACK A + B) . |
| | -PREVIOUS COMMENT (PC)- PLEASE CONFIRM THE PROPERTY |
| | LINE INDICATED IN DRAWINGS ACCURATELY REFLECT THE |
| | LOCATION OF THE PROPERTY LINE ACCORDING TO SURVEY. |
| | 2. PARTIALLY SATISFIED - PLEASE CONFIRM THE CORE OF THE |
| | OFFICE TOWER IN FLOORS 3 TO 7 ARE INCLUDED. SCHEMATICS |
| | FOR THOSE FLOORS WERE NOT INCLUDED. -PREVIOUS COMMENT- |
| | PLEASE CONFIRM THE SQUARE FOOTAGE OF THE EXISTING |
| | BUILDING REFLECTS THE GBA DEFINITION IN CURRENT CODE - |
| | PC -PLEASE PROVIDE A GBA TABLE WITH THE INFORMATION OF |
| | EXISTING ALLOWABLE GBA FOR SITE, EXISTING GBA FOR |
| | MARRIOTT, AND PROPOSED GBA. |
| | 3. PARTIALLY SATISFIED -PLEASE CONFIRM THE CORE OF THE |
| | OFFICE TOWER IN FLOORS 3 TO 7 ARE INCLUDED. SCHEMATICS |
| | FOR THOSE FLOORS WERE NOT INCLUDED. -PREVIOUS COMMENTS- |
| | VERTICAL CIRCULATION THROUGH THE GARAGE LEVELS SHALL BE |
| | COUNTED IN THE GBA NUMBERS. PLEASE IDENTIFY IF THE CORE |
| | (NOT COLORED IN GROSS FLOOR PLAN SHEETS) IS ALL |
| | INCLUDED IN THE GBA. MECHANICAL ROOMS CAN BE EXCLUDED. |
| | PLEASE LABEL EACH OF THE SPACES THAT ARE NOT CLEARLY |
| | IDENTIFIABLE- PC- PLEASE PROVIDE A FLOOR BY FLOOR PLAN |
| | AND TABLE INDICATING THE AREAS THAT ARE INCLUDED IN THE |
| | GBA CALCULATION ACCORDING TO THE GBA DEFINITION IN |
| | SECTION 94-109. CALL OUT THE USE IN EACH OF THE AREAS. |
| | GBA IN SHEETS A0.14, A0.15 AND A0.16 DO NOT MATCH THE |
| | GBA DEFINITION BY CODE. |
| | 4. NOT SATISFIED ? SEE COMMENTS BELOW UNDER NO. 28.- |
| | PREVIOUS COMMENT -PUBLIC OPEN SPACE DOES NOT COMPLY |
| | WITH THE REQUIREMENTS ACCORDING TO SECTION 94-109 OR |
| | TABLE IV-7. PROPOSED PUBLIC OPEN SPACE DOES NOT ABUT AN |
| | ACTIVE USE OR COMPLIES WITH MINIMUM PROPORTIONS. |
| | 5. PARTIALLY SATISFIED ? INFORMATION TO CONFIRM |
| | COMPLIANCE HAS NOT BEEN PROVIDED. SEE LANDSCAPE REVIEW |
| | COMMENTS. PRIVATE OPEN SPACE WEST OF THE NEW POOL |
| | BUILDING IS LOCATED ALONG LOT FRONTAGE THEREFORE IT |
| | SHALL BE DESIGNED IN COMPLIANCE WITH THE POS STANDARDS |
| | AND BE ACCESSIBLE TO THE PUBLIC. PLEASE VERIFY |
| | COMPLIANCE ? PREVIOUS COMMENT - PLEASE CLASSIFY THE |
| | PRIVATE OPEN SPACE TYPE PROPOSED ACCORDING TO TABLE |
| | IV-7. GREEN/ LANDSCAPE BUFFERS DO NOT QUALIFY AS |
| | PRIVATE OPEN SPACE. LANDSCAPE EDGE SOUTH OF THE NEW |
| | HOTEL POOL BUILDING OR LANDSCAPE EAST OF THE EXISTING |
| | HOTEL ENTRANCE ARE REALLY LEFT OVER AREAS NOT PRIVATE |
| | OPEN SPACES. - PC- PROJECT DOES NOT COMPLY WITH THE |
| | PRIVATE OPEN SPACE MINIMUM REQUIREMENTS. PLEASE EXPLAIN |
| | THE HARDSHIPS JUSTIFYING THE VARIANCE REQUEST. |
| | 6. PARTIALLY SATISFIED ? FOR DAC SUBMITTAL PLEASE |
| | PROVIDE BLOW OUT DETAILS OF THE MOST IMPORTANT GROUND |
| | FLOOR AREAS AND MOST IMPORTANT FEATURES OF BUILDING |
| | DESIGN SUCH AS METAL TRIM LOUVERS AND CURTAIN WALL, |
| | TERRACE PLANTERS. PREVIOUS COMMENT: COLORED ELEVATIONS |
| | NOT PROVIDED. - PC- PLEASE PROVIDE COLORED ELEVATIONS |
| | WITH CALL OUT MATERIALS FOR ALL ELEVATIONS. PLEASE |
| | INCLUDE PHOTOS OF PROPOSED MATERIALS. |
| | 7. SATISFIED - PLEASE STUDY THE EFFICIENCY OF THE |
| | GARAGE LAYOUT FOR POSSIBLE REDUCTION ON TOTAL NUMBER OF |
| | FLOORS. NORTHERN GARAGE LAYOUT DOES NOT SEEM TO |
| | FUNCTION. |
| | 8. NOT SATISFIED- VARIANCE JUSTIFICATION SHALL BE |
| | PROVIDED AND DAC APPROVAL NEEDED - GARAGE STRUCTURE |
| | EXCEEDS THE MAXIMUM FOOTPRINT LENGTH OF 350 FEET |
| | ALLOWED AND DOES NOT COMPLY WITH MINIMUM 60 FEET |
| | SEPARATION. A BREAK IS RECOMMENDED AND A VARIANCE WILL |
| | BE NEEDED - PC- PLEASE PROVIDE INFORMATION TO CONFIRM |
| | THE PROJECT COMPLIES WITH THE MAXIMUM 350 FEET |
| | FOOTPRINT LENGTH ALLOWED IN THE DISTRICT. |
| | 9. NOT SATISFIED ? VARIANCE JUSTIFICATION SHALL BE |
| | PROVIDED AND DAC APPROVAL NEEDED- PC - PROJECT EXCEEDS |
| | THE MAXIMUM SETBACK ALLOWED ALONG OKEECHOBEE BLVD, |
| | CREATING A SUBURBAN CONFIGURATION DUE TO THE LOCATION |
| | OF THE VEHICULAR ACCESS DRIVES IN FRONT OF THE |
| | BUILDING. |
| | 10. SATISFIED - PC - PLEASE PROVIDE INFORMATION TO |
| | CONFIRM COMPLIANCE WITH MAXIMUM BUILDING FOOTPRINTS |
| | ALLOWED. |
| | 11. SATISFIED. PLEASE INCLUDE THE OVERALL BUILDING |
| | HEIGHT TO CONFIRM COMPLIANCE WITH MAXIMUM VERTICAL |
| | PROJECTIONS- PC - ON FA?ADE, PLEASE INDICATE THE |
| | ELEVATION OF EACH FLOOR LEVEL. |
| | 12. SATISFIED - PC - PROPOSED PROJECT REMOVED THE TURN |
| | AROUND SPACE AT THE END OF CLEARWATER PARK ROAD. IF A |
| | GATE AT THE ENTRANCE OF THE PROPERTY IS INSTALLED, |
| | VEHICLES DO NOT HAVE SPACE TO TURN AROUND. |
| | 13. NOT SATISFIED ? VARIANCE JUSTIFICATION SHALL BE |
| | PROVIDED, AND DAC APPROVAL NEEDED ? PC-PLEASE PROVIDE |
| | INFORMATION TO CONFIRM THE PROJECT COMPLIES WITH THE |
| | MINIMUM ACTIVE USE REQUIRED ALONG THE AVENUE |
| | DESIGNATION AND THE CSX FRONTAGE. |
| | 14. NOT SATISFIED ? OKEECHOBEE FRONTAGE LISTED AS 552 |
| | LINEAR FEET THEREFORE 19 TREES REQUIRED ALONG THE |
| | FRONTAGE NEXT TO THE CURB WITHIN A PLANTING AREA. ONLY |
| | 13 TREES PROVIDED. A 12 FOOT WIDE MULTIPURPOSE PATH |
| | SHALL BE PROVIDED. - PREVIOUS COMMENT- IMPROVEMENTS |
| | NEED TO BE INDICATED IN THE LANDSCAPE AND HARDSCAPE |
| | PLAN FOR REVIEW DRUING THE SITE PLAN APPROVAL PROCESS.- |
| | PC- STREETSCAPE ALONG OKEECHOBEE SHALL BE DESIGNED TO |
| | CONTINUE THE RECENT DESIGN IMPLEMENTED BETWEEN TAMARIND |
| | AND ROSEMARY. STREET TREES PLANTED EVERY 30 FEET, A |
| | CONTINUOUS HEDGE OR GROUND COVER ALONG OKEECHOBEE AND A |
| | MULTIPURPOSE PATH OF 12 FEET IN WIDTH. |
| | 15. SATISFIED - PLEASE PROVIDE BUILDING SECTION. |
| | 16. SATISFIED - PC-PLEASE PROVIDE GRAPHIC INFORMATION |
| | TO CONFIRM COMPLIANCE WITH THE PLANAR BREAK |
| | REQUIREMENTS. |
| | 17. SATISFIED - PLEASE NOTE THAT MINIMUM SETBACKS ARE |
| | ALSO APPLICABLE TO GARAGE STRUCTURES. CHECK INFORMATION |
| | PROVIDED IN SHEET A0.01 REGARDING INTERIOR SETBACK. |
| | 18. PARTIALLY SATISFIED ? THE 552 LINEAR FEET OF |
| | FRONTAGE ALONG OKEECHOBEE REQUIRES 6 PUBLIC BIKE |
| | PARKING SPACES. THESE SPACES SHALL BE LOCATED CLOSE TO |
| | THE OFFICE AND CONVENTION CENTER ENTRANCE. THE FINAL |
| | LOCATION OF THE MICRO-MOBILITY STATION SHALL BE |
| | DISCUSSED WITH THE PROVIDER. PREVIOUS COMMENT -PLEASE |
| | INDICATE THE LOCATION OF THE REQUIRED PUBLIC BIKE |
| | PARKING SPACES 1/100? FEET OF FRONTAGE. |
| | 19. PARTIALLY SATISFIED ? COMPLIANCE TABLE IS SHEET |
| | A0.01 INDICATE THAT 71 BIKE PARKING SPACES ARE REQUIRED |
| | FOR THE PROJECT. PLEASE CLEARLY INDICATE THE LOCATION |
| | OF THE SECURE BIKE ROOM. ONLY SPACE FOR 46 BIKES |
| | IDENTIFIED IN SHEET A0.05. PREVIOUS COMMENT- PLEASE |
| | INDICATE THE LOCATION OF THE REQUIRED SECURED BIKE |
| | PARKING FOR THE OFFICE USE AT A RATIO OF 1/15 PARKING |
| | SPACES PROVIDED (74 BIKE SPACES REQUIRED). |
| | 20. SATISFIED - FOR THE PARKING CALCULATIONS, PLEASE |
| | LIST EACH OF THE EXISTING AND PROPOSED USES (WITH NET |
| | SQUARE FOOTAGE OR NUMBER OF ROOMS) AND THE REQUIRED AND |
| | PROVIDED PARKING. |
| | 21. PARTIALLY SATISFIED ? PLEASE INCLUDE A CONNECTION |
| | ON THE WEST SIDE OF THE ACCESS ROAD FROM THE GARAGE |
| | ALONG THE LOADING AS IT IS THE FASTEST ROUTE. PREVIOUS |
| | COMMENT - PLEASE IDENTIFY THE ROUTE OF PEDESTRIAN |
| | ACCESS TO THE HOTEL AND OFFICE FROM CLEARWATER PARK |
| | ROAD. |
| | 22. NOT SATISFIED - PLEASE PROVIDE NARRATIVE JUSTIFYING |
| | THE REQUESTED VARIANCES. DETAILED COMPLIANCE WITH |
| | VARIANCE STANDARDS WILL BE REQUIRED FOR DAC REVIEW. |
| | NEW COMMENTS FOR 2-1-22 |
| | 23. SATISFIED - MONUMENT SIGNS ARE NOT PERMITTED IN THE |
| | DOWNTOWN MASTER PLAN AREA. |
| | 24. SATISFIED - PROPOSED SIDEWALK ALONG THE EAST SIDE |
| | OF THE PROPERTY IS WITHIN CITY-OWNED PROPERTY THAT IS |
| | CURRENTLY USED BY THE TRI-RAIL MAINTENANCE YARD. |
| | 25. NOT SATISFIED- EXISTING CHILLER SHALL BE SCREENED |
| | AND A LANDSCAPE BUFFER SHALL BE PROVIDED AROUND. |
| | |
| | ADDITIONAL COMMENTS FOR 3-8-22 RESUBMITTAL |
| | 26. PLEASE REMOVE THE SEMI-PUBLIC OPEN SPACE FROM THE |
| | OPEN SPACE TABLE AS IT IS NOT APPLICABLE FOR THIS |
| | PROJECT. |
| | 27. PLEASE PROVIDE INFORMATION ON THE PROPOSED PLANTER |
| | ALONG THE EDGE OF THE TERRACES AND PARKING GARAGE. |
| | DETAILS NEEDED ON PROPOSED INSTALLATION SYSTEM, |
| | IRRIGATION AND PROPOSED LANDSCAPE MATERIAL. |
| | 28. COMPLIANCE WITH POS: STAFF SUGGESTS APPLICANT TO |
| | UTILIZE THE SPACE NEXT TO THE ROW TO COMPLY WITH THE |
| | POS REQUIREMENT AND ASK FOR NECESSARY VARIANCES (ACTIVE |
| | USE ABUTMENT). ALL OTHER STANDARDS CAN BE MET. |
| | IMPROVEMENTS SHALL BE DONE TO PEDESTRIAN AREA IN FRONT |
| | OF BUILDINGS, THE DROP-OFF AREA AND ACCESS ROAD TO |
| | MINIMIZE THE NEGATIVE IMPACT ON THE POS. FOR EXAMPLE: |
| | TREATMENT OF BLANK WALL AT SOUTH END OF HOTEL BUILDING; |
| | IDENTIFY THE TREATMENT OF THE WEST CONFERENCE CENTER |
| | WALL; PROVISION OF TREES ALONG THE ACCESS ROAD. IN |
| | ADDITION, POS NEXT TO OKEECHOBEE WEST OF ACCESS DRIVE |
| | SHALL BE INTEGRATED TO THE EXISTING CITY PARK ON WEST |
| | SIDE. |
| | 29. ADA ACCESS SHALL BE PROVIDED FROM THE OKEECHOBEE |
| | SIDEWALK TO THE OFFICE ENTRANCE. |
| | 30. PEDESTRIAN ACCESS SHALL BE PROVIDED ALSO ALONG THE |
| | WEST SIDE OF THE ACCESS ROAD. SCREENING OF LOADING |
| | RECOMMENDED, POSSIBLY REMOVAL OF CURB CUT EAST OF |
| | LOADING. RENDERING SHOW SOME ENCLOSURE BUT DRAWINGS DO |
| | NOT INDICATE ANYTHING. |
| | 31. RENDERINGS SHOW THAT THE WEST ELEVATION OF THE |
| | GARAGE ABOVE THE CONFERENCE CENTER IS VISIBLE FROM THE |
| | STREET. ARCHITECTURAL TREATMENT SHALL BE PROVIDED TO |
| | SCREEN THE NON-ACTIVE USES. |
| | 32. RENDERINGS SHALL BE UPDATED TO ACCURATELY REFLECT |
| | PROJECT AND SURROUNDING CONDITIONS (LEFT TURN MOVEMENT |
| | ON OKEECHOBEE SHOWN, VIEW FROM AMENITY DECK DOES NOT |
| | ACCURATELY REFLECT SURROUNDINGS. |
| | 33. ALL LANDSCAPE INDICATED WITHIN THE CITY PROPERTY |
| | (EAST OF THE SITE) SHALL BE CALLED OUT AS SUBJECT TO |
| | SEPARATE AGREEMENT. IN ADDITION, NOT ALL THE PROPOSED |
| | LANDSCAPE BUFFER IS POSSIBLE DUE TO THE EXISTING TRAIN |
| | FACILITY. IMPROVEMENTS SHALL BE INDICATED AS TWO PHASES |
| | IN CASE THE TRAIN FACILITY IS NOT MOVED OUT BY THE TIME |
| | THE BUILDING IS UNDER CONSTRUCTION. |
| | FOR RESUBMITTAL, PLEASE PROVIDE A RESPONSE SHEET |
| | ADDRESSING ALL COMMENTS. PLEASE INDICATE WHERE IN THE |
| | DRAWINGS THE UPDATED INFORMATION CAN BE FOUND IF |
| | POSSIBLE. SUBMIT ONE LARGE COLORED PRINTED SET AND ONE |
| | CD WITH THE ELECTRONIC COPY OF THE DRAWING AND ALL |
| | SUPPORT INFORMATION (INCLUDING RESPONSE LETTER). |
| | BEFORE THE PROJECT CAN BE SCHEDULED FOR DAC ALL |
| | COMMENTS SHALL BE ADDRESSED. REVISED DRAWINGS SHALL BE |
| | SUBMITTED BY APRIL 12 ADDRESSING ALL OUTSTANDING |
| | COMMENTS FOR THE PROJECT TO BE SCHEDULED FOR MAY 11 |
| | DAC. |
| | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| | APONTE AT 561-822-1439. |
| | |
| |