| Date |
Text |
| 2022-02-23 11:29:01 | 1. PARTIALLY SATISFIED- PLEASE UPDATE SURVEY TO INCLUDE |
| | TOTAL SQUARE FOOTAGE OF PARCEL (TRACK A + B) . |
| | -PREVIOUS COMMENT (PC)- PLEASE CONFIRM THE PROPERTY |
| | LINE INDICATED IN DRAWINGS ACCURATELY REFLECT THE |
| | LOCATION OF THE PROPERTY LINE ACCORDING TO SURVEY. |
| | 2. PARTIALLY SATISFIED - PLEASE CONFIRM THE SQUARE |
| | FOOTAGE OF THE EXISTING BUILDING REFLECTS THE GBA |
| | DEFINITION IN CURRENT CODE - PC -PLEASE PROVIDE A GBA |
| | TABLE WITH THE INFORMATION OF EXISTING ALLOWABLE GBA |
| | FOR SITE, EXISTING GBA FOR MARRIOTT, AND PROPOSED GBA. |
| | 3. PARTIALLY SATISFIED -VERTICAL CIRCULATION THROUGH |
| | THE GARAGE LEVELS SHALL BE COUNTED IN THE GBA |
| | NUMBERS.PLEASE IDENTIFY IF THE CORE (NOT COLORED IN |
| | GROSS FLOOR PLAN SHEETS) IS ALL INCLUDED IN THE GBA. |
| | MECHANICAL ROOMS CAN BE EXCLUDED. PLEASE LABEL EACH OF |
| | THE SPACES THAT ARE NOT CLEARLY IDENTIFIABLE- PC- |
| | PLEASE PROVIDE A FLOOR BY FLOOR PLAN AND TABLE |
| | INDICATING THE AREAS THAT ARE INCLUDED IN THE GBA |
| | CALCULATION ACCORDING TO THE GBA DEFINITION IN SECTION |
| | 94-109. CALL OUT THE USE IN EACH OF THE AREAS. GBA IN |
| | SHEETS A0.14, A0.15 AND A0.16 DO NOT MATCH THE GBA |
| | DEFINITION BY CODE. |
| | 4. NOT SATISFIED - PUBLIC OPEN SPACE DOES NOT COMPLY |
| | WITH THE REQUIREMENTS ACCORDING TO SECTION 94-109 OR |
| | TABLE IV-7. PROPOSED PUBLIC OPEN SPACE DOES NOT ABUT AN |
| | ACTIVE USE OR COMPLIES WITH MINIMUM PROPORTIONS. |
| | 5. NOT SATISFIED - PLEASE CLASIFY THE PRIVATE OPEN |
| | SPACE TYPE PROPOSED ACCORDING TO TABLE IV-7. GREEN/ |
| | LANDSCAPE BUFFERS DO NOT QUALIFY AS PRIVATE OPEN SPACE. |
| | LANDSCAPE EDGE SOUTH OF THE NEW HOTEL POOL BUILDING OR |
| | LANDSCAPE EAST OF THE EXISTING HOTEL ENTRANCE ARE |
| | REALLY LEFT OVER AREAS NOT PRIVATE OPEN SPACES. - PC- |
| | PROJECT DOES NOT COMPLY WITH THE PRIVATE OPEN SPACE |
| | MINIMUM REQUIREMENTS. PLEASE EXPLAIN THE HARDSHIPS |
| | JUSTIFYING THE VARIANCE REQUEST. |
| | 6. PARTIALLY SATISFIED - COLORED ELEVATIONS NOT |
| | PROVIDED. - PC- PLEASE PROVIDE COLORED ELEVATIONS WITH |
| | CALL OUT MATERIALS FOR ALL ELEVATIONS. PLEASE INCLUDE |
| | PHOTOS OF PROPOSED MATERIALS. |
| | 7. NOT SATISFIED - PLEASE STUDY THE EFFICIENCY OF THE |
| | GARAGE LAYOUT FOR POSSIBLE REDUCTION ON TOTAL NUMBER OF |
| | FLOORS. NORTHERN GARAGE LAYOUT DOES NOT SEEM TO |
| | FUNCTION. |
| | 8. NOT SATISFIED- GARAGE STRUCTURE EXCEEDS THE MAXIMUM |
| | FOOTPRINT LENGHT OF 350 FEET ALLOWED AND DOES NOT |
| | COMPLY WITH MINIMUM 60 FEET SEPARATION.A BREAK IS |
| | RECOMMENDED AND A VARIANCE WILL BE NEEDED - PC- PLEASE |
| | PROVIDE INFORMATION TO CONFIRM THE PROJECT COMPLIES |
| | WITH THE MAXIMUM 350 FEET FOOTPRINT LENGTH ALLOWED IN |
| | THE DISTRICT. |
| | 9. NOT SATISFIED - PC - PROJECT EXCEEDS THE MAXIMUM |
| | SETBACK ALLOWED ALONG OKEECHOBEE BLVD, CREATING A |
| | SUBURBAN CONFIGURATION DUE TO THE LOCATION OF THE |
| | VEHICULAR ACCESS DRIVES IN FRONT OF THE BUILDING. |
| | 10. NOT SATISFIED - PC - PLEASE PROVIDE INFORMATION TO |
| | CONFIRM COMPLIANCE WITH MAXIMUM BUILDING FOOTPRINTS |
| | ALLOWED. |
| | 11. PARTIALLY SATISFIED. PLEASE INCLUDE THE OVERALL |
| | BUILDING HEIGHT TO CONFIRM COMPLIANCE WITH MAXIMUM |
| | VERTICAL PROJECTIONS- PC - ON FA?ADE, PLEASE INDICATE |
| | THE ELEVATION OF EACH FLOOR LEVEL. |
| | 12. SATISFIED - PC - PROPOSED PROJECT REMOVED THE TURN |
| | AROUND SPACE AT THE END OF CLEARWATER PARK ROAD. IF A |
| | GATE AT THE ENTRANCE OF THE PROPERTY IS INSTALLED, |
| | VEHICLES DO NOT HAVE SPACE TO TURN AROUND. |
| | 13. SATISFIED - PLEASE PROVIDE INFORMATION TO CONFIRM |
| | THE PROJECT COMPLIES WITH THE MINIMUM ACTIVE USE |
| | REQUIRED ALONG THE AVENUE DESIGNATION AND THE CSX |
| | FRONTAGE. |
| | 14. NOT SATISFIED - IMPROVEMENTS NEED TO BE INDICATED |
| | IN THE LANDSCAPE AND HARDSCAPE PLAN FOR REVIEW DRUING |
| | THE SITE PLAN APPROVAL PROCESS.- PC- STREETSCAPE ALONG |
| | OKEECHOBEE SHALL BE DESIGNED TO CONTINUE THE RECENT |
| | DESIGN IMPLEMENTED BETWEEN TAMARIND AND ROSEMARY. |
| | STREET TREES PLANTED EVERY 30 FEET, A CONTINUOUS HEDGE |
| | OR GROUND COVER ALONG OKEECHOBEE AND A MULTIPURPOSE |
| | PATH OF 12 FEET IN WIDTH. |
| | 15. SATISFIED - PLEASE PROVIDE BUILDING SECTION. |
| | 16. NOT SATISFIED - PC-PLEASE PROVIDE GRAPHIC |
| | INFORMATION TO CONFIRM COMPLIANCE WITH THE PLANAR BREAK |
| | REQUIREMENTS. |
| | 17. SATISFIED - PLEASE NOTE THAT MINIMUM SETBACKS ARE |
| | ALSO APPLICABLE TO GARAGE STRUCTURES. CHECK INFORMATION |
| | PROVIDED IN SHEET A0.01 REGARDING INTERIOR SETBACK. |
| | 18. NOT SATISFIED - PLEASE INDICATE THE LOCATION OF THE |
| | REQUIRED PUBLIC BIKE PARKING SPACES 1/100? FEET OF |
| | FRONTAGE. |
| | 19. NOT SATISFIED - PLEASE INDICATE THE LOCATION OF THE |
| | REQUIRED SECURED BIKE PARKING FOR THE OFFICE USE AT A |
| | RATIO OF 1/15 PARKING SPACES PROVIDED (74 BIKE SPACES |
| | REQUIRED). |
| | 20. PARTIALLY SATISFIED - FOR THE PARKING CALCULATIONS, |
| | PLEASE LIST EACH OF THE EXISTING AND PROPOSED USES |
| | (WITH NET SQUARE FOOTAGE OR NUMBER OF ROOMS) AND THE |
| | REQUIRED AND PROVIDED PARKING. |
| | 21. NOT SATISFIED - PLEASE IDENTIFY THE ROUTE OF |
| | PEDESTRIAN ACCESS TO THE HOTEL AND OFFICE FROM |
| | CLEARWATER PARK ROAD. |
| | 22. NOT SATISFIED - PLEASE PROVIDE NARRATIVE JSUTIFYING |
| | THE REQUESTED VARIANCES. DETAILED COMPLIANCE WITH |
| | VARIANCE STANDARDS WILL BE REQUIRED FOR DAC REVIEW. |
| | NEW COMMENTSFOR 2-1-22 |
| | 23. MONUMENT SIGNS ARE NOT PERMITTED IN THE DOWNTOWN |
| | MASTER PLAN AREA. |
| | 24. PROPOSED SIDEWALK ALONG THE EAST SIDE OF THE |
| | PROPERTY IS WITHIN CITY-OWNED PROPERTY THAT IS |
| | CURRENTLY USED BY THE TRI-RAIL MAINTENANCE YARD. |
| | 25. EXISTING CHILLER SHALL BE SCREEN AND A LANDSCAPE |
| | BUFFER SHALL BE PROVIDED AROUND. |
| | |
| | FOR RESUBMITTAL, PLEASE PROVIDE A RESPONSE SHEET |
| | ADDRESSING ALL COMMENTS. PLEASE INDICATE WHERE IN THE |
| | DRAWINGS THE UPDATED INFORMATION CAN BE FOUND IF |
| | POSSIBLE. SUBMIT ONE LARGE COLORED PRINTED SET AND ONE |
| | CD WITH THE ELECTRONIC COPY OF THE DRAWING AND ALL |
| | SUPPORT INFORMATION (INCLUDING RESPONSE LETTER). |
| | BEFORE THE PROJECT CAN BE SCHEDULED FOR DAC ALL |
| | COMMENTS SHALL BE ADDRESSED. |
| | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA |
| | APONTE AT 561-822-1439. |
| |
Print |