Plan Review Notes
Plan Review Notes For Project Z21100021
Project Number Z21100021
Review Stop STORM
Sequence Number 1
Notes
Date Text
2021-11-18 12:50:191. THE CITY?S OFFICIAL VERTICAL DATUM PER CITY CODE IS
 NGVD1929. THE CITY IS ALLOWING SURVEYS AND PLANS TO USE
 NAVD1988 PROVIDED THE CONVERSION EQUATION BETWEEN
 NAVD1988 AND NGVD1929 IS ALSO PROVIDED. LIST THE
 CONVERSION EQUATION TO NGVD1929 ON THE SURVEY AND ON
 THE ENGINEERING PLAN.
  
 2. CONSIDER RELOCATING THE PROPOSED STORM CHAMBERS
 OUTSIDE OF THE UTILITY EASEMENT.
  
 3. ARE THE OVERHEAD LINES WITHIN AN EASEMENT?
  
 4. OKEECHOBEE BLVD IS MAINTAINED BY FDOT. PROVIDE
 PERMIT FROM FDOT PRIOR TO ENGINEERING PERMIT ISSUANCE
 FOR WORK WITHIN THE R/W.
  
 5. AUSTRALIAN AVE IS MAINTAINED BY PALM BEACH COUNTY.
 PROVIDE PERMIT FROM THE COUNTY PRIOR TO ENGINEERING
 PERMIT ISSUANCE FOR WORK WITHIN THE R/W.
  
 6. ARE FLOW ARROWS SHOWN CORRECTLY FOR DRIVE LANES
 GOING TOWARD OKEECHOBEE BLVD?
  
 7. INDICATE IF ALL OF THE STORAGE CHAMBERS WILL BE
 INTERCONNECTED TO BALANCE OUT THE RUNOFF TO THE SYSTEM
 AND, IF NOT ALL INTERCONNECTED, THE INDIVIDUAL STORAGE
 CHAMBER AREAS ARE APPROPRIATELY SIZED FOR THE RUNOFF
 EXPECTED TO DRAIN TO THEM.
  
 8. CONDITION ASSESSMENT PERFORMED ON THE EXISTING CMP
 STORM PIPE TO REMAIN TO DETERMINE IF THE STORM PIPES
 SHOULD BE REPLACED OR LINED.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE
 START OF CONSTRUCTION.
  
 2. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 3. SWPPP REQUIRED WITH THE ENGINEERING PERMIT
 APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved