| Plan Review Notes For Project Z21100021 |
| Project Number |
Z21100021 |
|
| Review Stop |
PU |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-02-07 14:54:51 | -SPLIT PLAN SHEETS. AT A MINIMUM, THE WATER AND | | | WASTEWATER PLAN SHOULD BE ON A SEPARATE SHEET. | | | -PROVIDE A REFERENCE/CALL OUT/NUMBER ON SHEET TO LINK | | | THE EXISTING MH?S AND LINE SEGMENTS TO THE CCTV VIDEOS. | | | -CALL OUT FOR VCP SEWER MAIN ON CLEARWATER PARK RD TO | | | BE LINED FROM MH TO MH. | | | -PROPOSED CONNECTIONS/ IMPROVEMENTS SEEM TO BE IN LINE | | | WITH CITY STANDARDS. A MORE THOROUGH REVIEW WILL BE | | | DONE WHEN PLANS MOVE FROM CONCEPTUAL. | | | | | | |
| |
Print |
|