2023-06-22 02:40:52TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE COUNTY TPS LETTER
 2) PARTIALLY SATISFIED. A COMPREHENSIVE TRAFFIC STUDY
 WILL BE REQUIRED. PLEASE SCHEDULE A METHODOLOGY MEETING
 WITH THE TRAFFIC ENGINEERING GROUP, PRIOR TO REVISING
 OR RESUBMITTING THE TRAFFIC STUDY. PLEASE ADDRESS
 3) NOT SATISFIED. IN THE TRIP GENERATION TABLE ADD THE
 CAF?? PAVILION AS A TRIP GENERATOR. EMAIL EXCHANGE DID
 NOT WAVE THIS ITEM
 4) NOT SATISFIED. PROVIDE A FIGURE SHOWCASING
 DRIVEWAY(S) VOLUMES AND DIRECTIONAL SPLIT, BOTH INBOUND
 AND OUTBOUND. EMAIL EXCHANGE DID NOT WAVE THIS ITEM
 5) SATISFIED. PROVIDE EXISTING WEEKEND TRAFFIC COUNTS.
 6) SATISFIED. PROVIDE PROPOSED DEVELOPMENT SITE PLAN IN
 THE TRAFFIC STUDY
 7) NOT SATISFIED. A DETAILED INTERNAL CIRCULATION
 ANALYSIS SHOULD BE PROVIDED IN THE TRAFFIC STUDY OR AS
 A SEPARATE DOCUMENT
 SITE COMMENTS
 8) NOT SATISFIED. PROVIDE A CLEAN SITE PLAN, SHOWCASING
 ONLY TRANSPORTATION FEATURES (I.E. ROAD, CURB, GUTTER,
 SIDEWALK, DRIVEWAY, PAVEMENT MARKING, SIGNAGE, PATHWAY,
 WALKWAY, PEDESTRIAN CROSSING, LOADING ZONE,
 PICK-UP/DROP-OFF AREA) AND CORRESPONDING DIMENSIONS. A
 SPECIFIC AND SEPARATE SITE PLAN SHEET SHOULD BE
 PROVIDED TO FULFILL THIS COMMENT, AS SEVERAL DIMENSIONS
 ARE MISSING FOR KEY TRANSPORTATION ITEMS. PAVEMENT
 MARKINGS AND DIMENSIONS SHOULD BE PROVIDED FOR ALL
 TRAVEL LANES; THE LATEST PAVEMENT MARKINGS AND SIGNAGE
 PLANS ARE DEFICIENT.
 9) SATISFIED. PROVIDE TYPICAL PARKING STALL DIMENSIONS
 AND TYPOLOGY (I.E. NORMAL, COMPACT, TRAILER). MARK OR
 PROPERLY LABEL EACH OF THEM ON THE SITE PLAN
 10) PARTIALLY SATISFIED. ON THE SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING
 STALLS IF ANY) ON THE OPPOSITE SIDE OF THE ROADS
 SURROUNDING THE PROPOSED DEVELOPMENT. PARKING STALL
 MARKINGS ARE MISSING. PLEASE INCLUDE THEM IN THE
 PAVEMENT MARKING AND SIGNAGE PLANS
 11) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES
 CLEARLY DEFINED. ALSO PROVIDE ANALYSIS FOR TYPICAL
 TRUCK WITH BOAT TRAILER. INSERT DESIGN VEHICLES DETAILS
 IN THE DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET
 NUMBER SHOWCASING THE ANALYSIS. LATEST ANALYSIS IS NOT
 PROPER, ENGINEERING SERVICES CAN PROVIDE A SAMPLE
 ANALYSIS FOR REFERENCE PURPOSES
 12) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY
 ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR
 THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2???
 SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL
 PULL BOX (240V CIRCUIT).
 13) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE
 NUMBER OF DESIGNATED PARKING SPACES, INCLUSIVE OF ADA,
 SPECIALTY OR RESTRICTED SUCH AS TRAILERS, AND BICYCLE
 ONES. PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER
 SHOWCASING SUCH TABLE
 14) PARTIALLY SATISFIED. PROVIDE AND INDICATE FREIGHT
 DELIVERY LOADING ZONE. PROVIDE DIMENSIONS IN THE
 TRANSPORTATION SPECIFIC SITE PLAN. NOTE: THE DESIGNATED
 AREA SHOULD BE STRICTLY FOR COMMERCIAL VEHICLES AND
 SHOULD BE MARKED AND SIGNED ACCORDINGLY
 15) SATISFIED. PROVIDE A SIDEWALK WITH 10 FEET MINIMUM
 WIDTH ALONG SITE FRONTAGE. IMPLEMENTATION OF A MULTIUSE
 PATHWAY, WITH DISTINCT BICYCLE LANES IS STRONGLY
 ENCOURAGED, MINIMUM WIDTH SHOULD BE 15-FEET
 16) SATISFIED. ARE THERE ANY DESIGNATED
 PICK-UP/DROP-OFF OR VALET AREAS? IF SO CLEARLY INDICATE
 THEM ON THE SITE PLAN. COMMENT IS REFERRING TO
 PASSENGER PICK-UP/DROP-OFF OPERATIONS, NOT COMMERCIAL
 LOADING/UNLOADING. IN CASE OF THE FORMER, A VALET
 OPERATIONAL ANALYSIS SHOULD BE PROVIDED
 17) SATISFIED. THERE IS A CONCEPT TO EXTEND NORTHWOOD
 RD TO FLAGLER, AND POTENTIALLY INSTALL A ROUNDABOUT IN
 LIEU OF AN INTERSECTION. PLEASE COORDINATE WITH
 PLANNING AND CRA ON THIS ITEM, AS IT MAY AFFECT THE
 LAYOUT OF THE PARKING AREA AND THE ALIGNMENT OF THE
 DRIVEWAYS.
 18) NOT SATISFIED. PROVIDE A PAVEMENT MARKING AND
 SIGNAGE PLAN. THIS SHOULD BE A SEPARATE SITE PLAN SHEET
 OR INCLUDED IN THE TRANSPORTATION SPECIFIC SITE PLAN.
 LATEST PLANS ARE MISSING SEVERAL MARKINGS AND
 DIMENSIONS
 19) NOT SATISFIED. PROVIDE A SEPARATED AND PROTECTED
 TWO-WAY BIKE LANE ALONG THE EASTERN SIDE OF FLAGLER DR
 ACCORDING TO THE CITY BICYCLE MASTERPLAN. THIS IS A
 MAJOR ITEM, PLEASE CONTACT ENGINEERING SERVICES FOR
 FURTHER DISCUSSION OR CLARIFICATIONS. DUE TO FULL
 REDEVELOPMENT OF THE PARK, THERE ARE NO REASONS THAT
 PRECLUDE ESTABLISHING A 14-FEET WIDE SHARED USE PATHWAY
 THROUGHOUT. PER FDOT SHARED USE PATHWAY GUIDELINES
 SECTION 224.7: PROVIDE A 4-FOOT CLEAR AREA ADJACENT TO
 BOTH SIDES OF THE PATH, INCLUDING PLACEMENT OF SIGNS.
 FOR RESTRICTED CONDITIONS, BRIDGE ABUTMENTS, SIGNPOSTS,
 FENCING AND RAILING MAY BE LOCATED WITHIN 4 FEET OF THE
 EDGE OF PAVEMENT, BUT NOT LESS THAN 2 FEET. PLEASE
 REVISE ACCORDINGLY
 20) SHEET C5.00. BASED ON THE PROPOSED DRIVE AISLES,
 SIGNAGE AND PAVEMENT MARKINGS, THE OVERALL INTERNAL
 CIRCULATION ESPECIALLY NEARBY THE BOAT LAUNCH AREA DOES
 NOT SEEM OPTIMAL NOR CONDUCIVE TO SAFE OPERATIONS.
 GENERAL VEHICULAR TRAFFIC IS MIXED WITH THE
 BOAT-TRAILING ONE. IT IS STRONGLY RECOMMENDED TO
 REDESIGN THE PARKING LOT LAYOUT AND VALIDATE ITS
 CONFIGURATION WITH A PROPER INTERNAL CIRCULATION
 ANALYSIS
 21) SHEET C5.01. SEVERAL PAVEMENT MARKINGS AND
 DIMENSIONS ARE MISSING, PROVIDE A 14-FEET WIDE MULTIUSE
 PATHWAY. THE INTERSECTION OF BUTLER AND FLAGLER MUST BE
 PROPERLY AND ENTIRELY DEPICTED, INCLUSIVE OF ALL
 PERTINENT TRANSPORTATION FEATURES; THAT IS NECESSARY TO
 VALIDATE THE PROPOSED SOUTHERN DRIVEWAY LOCATION AND
 CONFIGURATION
 22) SHEET C5.02. SEVERAL PAVEMENT MARKINGS AND
 DIMENSIONS FOR KEY TRANSPORTATION ITEMS (I.E. TRAVEL
 LANES, OPPOSITE SIDE MARKINGS) ARE MISSING
 23) SHEET C.5.03. PROVIDE A CONTINUOUS 14-FEET SHARED
 USE PATHWAY
 24) SHEET C5.04. TRANSPORTATION FEATURES SUCH AS RAMPS
 AND CROSSWALKS FOR THE INTERSECTION OF 23RD AND FLAGLER
 ARE EITHER MISSING OR GROSSLY DEPICTED. SEVERAL OTHER
 MARKINGS AND DIMENSIONS ARE MISSING
 25) SHEET C5.06. DRAFT ROADWAY CONFIGURATIONS FOR THE
 PLANNED NORTHWOOD ROAD EXTENSION SHOULD BE AVAILABLE
 FOR INTEGRATION AND PROPER CONFIGURATION OF THE
 PROPOSED DRIVEWAY; PLEASE REVISE ACCORDINGLY. SEVERAL
 DIMENSIONS ARE MISSING (I.E. TRAVEL LANES, DRIVE
 AISLES). THE CROSSWALK BY THE INTERNAL DRIVE AISLE
 SHOULD BE BETTER DEPICTED AND CONFIGURED AS A RAISED
 ONE. UNDERGROUND UTILITY LINES ARE NOT PERTINENT,
 PLEASE DO NOT SHOW THAT LAYER
 26) SHEET C5.08. PROPERLY RE-ALIGN THE DRIVEWAY
 CROSSWALK, SEVERAL PAVEMENT MARKINGS AND DIMENSIONS
 MISSING
 27) SHEET C5.09. A FEW DIMENSIONS MISSING. INSTALL
 DO-NOT-ENTER AND/OR DIRECTIONAL ARROW SIGNAGE AT THE
 INTERNAL INTERSECTION ALONG THE NORTHERN ONE-WAY DRIVE
 AISLE
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved