Plan Review Notes
Plan Review Notes For Project Z21080033
Project Number Z21080033
Review Stop STORM
Sequence Number 1
Notes
Date Text
2021-10-14 12:38:041. UTILITY EASEMENT WILL BE NEEDED FOR THE MAIN STORM
 PIPE AND DRAINAGE STRUCTURES CONNECTED TO THE MAIN
 STORM PIPE. THE CATCH BASINS AND PIPES BETWEEN THE
 CATCH BASINS AND THE MAIN STORM PIPE WILL BECOME THE
 RESPONSIBILITY OF THE NEW PROPERTY OWNER.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved