| Plan Review Notes For Project Z21080033 |
| Project Number |
Z21080033 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-10-14 12:38:04 | 1. UTILITY EASEMENT WILL BE NEEDED FOR THE MAIN STORM | | | PIPE AND DRAINAGE STRUCTURES CONNECTED TO THE MAIN | | | STORM PIPE. THE CATCH BASINS AND PIPES BETWEEN THE | | | CATCH BASINS AND THE MAIN STORM PIPE WILL BECOME THE | | | RESPONSIBILITY OF THE NEW PROPERTY OWNER. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | |
| |
Print |
|