Plan Review Notes
Plan Review Notes For Project Z21080015
Project Number Z21080015
Review Stop TRAFFIC
Sequence Number 5
Notes
Date Text
2022-10-19 17:17:01APPROVED WITH THE FOLLOWING CONDITIONS:
  
 1) PROVIDE A CLEAN, DEDICATED TRANSPORTATION SITE PLAN
 DEPICTING ALL RELATED ROADWAY AND TRANSPORTATION
 FEATURES, FULLY DIMENSIONED AND SHOWCASING CURB DETAILS
 ON THE OPPOSITE SIDE OF THE ROAD FRONTING THE PROPOSED
 DEVELOPMENT. PLEASE KEEP IN MIND THAT THIS COMMENT WAS
 PROVIDED AT THE VERY FIRST PPRC REVIEW AND WAS NEVER
 COMPLETELY FULFILLED
 2) PROVIDE A REVISED AUTOTURN ANALYSIS SHOWCASING
 SERVICE VEHICLES ACCESSING/EXITING THE FACILITY,
 MANEUVERING AT EACH POSSIBLE LOADING OR SANITATION
 ZONE(S), WITH BOTH DYNAMIC AND WHEEL PATHS HIGHLIGHTED
 IN SEPARATE COLORS
 3) PROVIDE A LIST OF ON-GOING ITEMS UNDER DISCUSSION OR
 REVIEW WITH COUNTY AND FDOT. OBTAIN COUNTY AND/OR FDOT
 APPROVAL PERTAINING THE PORTION OF THE PROPOSED
 DEVELOPMENT IMPACTING THEIR RIGHT OF WAY
 4) INSTALL AND SHOW SHARROW MARKINGS ALONG 23RD ST AND
 PINEWOOD AVE
 5) 25TH ST ROADWAY DESIGN SHOULD ACCOMMODATE THE
 PLANNED SEPARATED AND ELEVATED BICYCLE LANES FROM
 AUSTRALIAN TO BROADWAY. PLEASE REFER TO THE CITY
 BICYCLE MASTERPLAN FOR TYPICAL SECTION(S) AND UPDATE
 THE SITE PLANS ACCORDINGLY. NOTE: CITY MAY NOT REQUIRE
 THE DEVELOPER TO IMPLEMENT SUCH FEATURE ALONG SITE
 FRONTAGE; HOWEVER, ROW MUST BE PRESERVED AND PROVIDED
 TO ACCOMMODATE ITS FUTURE IMPLEMENTATION
 6) THE PROPOSED PINEWOOD AVENUE RE-ALIGNMENT IS NOT
 CONDUCIVE TO A SAFE VEHICULAR STRAIGHT-THROUGH MOVEMENT
 ACROSS THE 25TH AND 23RD INTERSECTIONS. SUCH MOVEMENT
 SHOULD BE EITHER FORBIDDEN OR FACILITATED BY SIGNAGE,
 STRIPING AND ROADWAY FEATURES SUCH AS FLEXIBLE POLES,
 MIDDLE RAISED ISLANDS AND CHANNELIZATION. PLEASE REVISE
 THE SITE PLANS ACCORDINGLY
 7) INSTALL AND SHOWCASE STOP BARS AND SIGNS ON EACH
 GARAGE LEVEL. IT IS RECOMMENDED TO TREAT THE NORTHERN
 AND SOUTHERN EAST-WEST DRIVE AISLES AS THE MAIN ONES,
 WHILE THE NORTH-SOUTH AS MINOR
 8) DIRECTIONAL ARROW PAVEMENT MARKINGS ARE MISSING.
 PLEASE INSERT THEM IN THE TRANSPORTATION SITE PLAN
 THROUGHOUT WERE NEEDED (E.G. RIGHT ARROW FOR THE
 SOUTHBOUND MOVEMENT, LEFT ARROW FOR THE EASTBOUND
 MOVEMENT AT THE 23RD AND PINEWOOD INTERSECTION)
  
 PAST AND LATEST COMMENTS, FOR REFERENCE PURPOSES
  
 TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE UPDATED COUNTY TPS LETTER ONCE
 AVAILABLE
 2) SATISFIED. SUBMITTED TRAFFIC STUDY NEEDS REVISION AS
 THE TRIP GENERATION RATES DO NOT REPRESENT THE LATEST
 SITE PLAN
 3) SATISFIED. SCHEDULE A METHODOLOGY MEETING WITH THE
 TRANSPORTATION ENGINEERING GROUP. PRIOR TO ANY REVISION
 OR RESUBMISSION
 4) SATISFIED. REVISE THE TRAFFIC STUDY TO ALSO INCLUDE
 RESIDENTIAL TRIPS IN THE SIGNIFICANCE ANALYSIS. CRCEA
 EXEMPTION ONLY APPLIES TO COUNTY CONCURRENCY. TEST 2
 MAY BE NEEDED
 5) SATISFIED. PLEASE ELABORATE ON THE IMPROVEMENTS
 NEEDED TO ACCOMMODATE FUTURE BACKGROUND TRAFFIC AND
 THEIR CAPACITY FOR THE PROPOSED PROJECT TRAFFIC
 6) SATISFIED. KEEP THE INTERSECTION OF 25TH AND
 PINEWOOD UNDER EXISTING TWO-WAY STOP CONTROL
 CONFIGURATION
 7) SATISFIED. IMPLEMENT A LEFT-TURN LANE, NOT A TWLT
 ONE, ON THE EAST AND WEST APPROACH OF THE 25TH AND
 PINEWOOD INTERSECTION
 SITE COMMENTS
 8) PARTIALLY SATISFIED. PROVIDE A CLEAN SITE PLAN,
 SHOWCASING ONLY TRANSPORTATION FEATURES (I.E. ROAD,
 CURB, GUTTER, SIDEWALK, DRIVEWAY, PAVEMENT MARKING,
 SIGNAGE, PATHWAY, WALKWAY, PEDESTRIAN CROSSING, LOADING
 ZONE, PICK-UP/DROP-OFF AREA) AND CORRESPONDING
 DIMENSIONS. SHEET C2.01-C3.04 ARE UNACCEPTABLE, AS THEY
 ARE OVERCROWDED WITH UNRELATED ITEMS AND MISSING
 SEVERAL TRANSPORTATION FEATURES. ALSO, DIMENSIONS FOR
 ALL LISTED TRANSPORTATION FEATURES ARE MISSING. A
 DEDICATED SITE PLAN IS A CRITICAL ITEM FOR A PROPER
 TRANSPORTATION REVIEW CONSIDERING THE SIGNIFICANT
 IMPACT OF THE PROPOSED DEVELOPMENT TO THE EXISTING
 NETWORK. SEVERAL DIMENSIONS ARE STILL MISSING IN THE
 LATEST RESUBMISSION (SEPTEMBER 2022)
 9) PARTIALLY SATISFIED. ON THE SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING
 STALLS) ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING
 THE PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME
 AND SHEET NUMBER SHOWCASING SUCH FEATURES. DETAILS
 MISSING FOR THE FOLLOWING LOCATION: SOUTH SIDE OF 23RD
 ST, EAST SIDE OF BROADWAY, NORTH SIDE OF 25TH ST.
 SEVERAL PAVEMENT MARKINGS ARE STILL MISSING IN THE
 LATEST RESUBMISSION (SEPTEMBER 2022)
 10) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND
 OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC
 ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED
 IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT
 NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS. SHEET
 C4.01 IS INCOMPLETE, GARBAGE VEHICLES SHOULD BE SHOWN
 TURNING-IN/ENTERING AND TURNING-OUT/EXITING THE
 PREMISES OF THE PROPOSED DEVELOPMENT. PLEASE COORDINATE
 WITH SANITATION SERVICES REGARDING TYPICAL FUTURE
 ROUTE(S)
 11) SATISFIED. IDENTIFY AND DESIGNATE TWO OR MORE
 ACCESSIBLE MICRO-MOBILITY STATION AREAS (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS. FOR
 THE LATTER ITEM, MORE SPECIFICALLY: A CONDUIT (2???
 SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL
 PULL BOX (240V ??? 10,000W CIRCUIT). PLEASE PROVIDE
 DOCUMENT NAME AND SHEET NUMBER SHOWCASING SUCH FEATURE
 12) PARTIALLY SATISFIED. OBTAIN COUNTY AND/OR FDOT
 APPROVAL PERTAINING THE PORTION OF THE PROPOSED
 DEVELOPMENT IMPACTING THEIR RIGHT OF WAY. COMMENT WILL
 BE SATISFIED ONCE APPROVAL DOCUMENTATION IS PROVIDED.
 IN THE MEANTIME, PROVIDE A LIST OF ON-GOING ITEMS UNDER
 DISCUSSION OR REVIEW WITH COUNTY AND FDOT
 13) SATISFIED. GARAGE RAMP ON 25TH ST NEEDS TO BE
 RELOCATED. FRA REGULATIONS REQUIRE A MINIMUM DISTANCE
 OF 60 FEET FROM RAILROAD CROSSING???S GATE ARM
 14) PARTIALLY SATISFIED. PROPER TURNAROUND SPACE NEEDS
 TO BE PROVIDED AT EACH DEAD END WITHIN THE GARAGE.
 PLEASE PROVIDE DOCUMENT NAME AND SHEET NUMBER. PROVIDE
 A TURNAROUND SPACE ON THE NORTH-WEST CORNER OF THE
 GARAGE LEVEL 2
 15) INSTALL AND SHOW SHARROW MARKINGS ALONG 23RD ST
 16) INSTALL AND SHOW SHARROW MARKINGS ALONG PINEWOOD
 AVE
 17) 25TH ST ROADWAY DESIGN SHOULD ACCOMMODATE THE
 PLANNED SEPARATED AND ELEVATED BICYCLE LANES FROM
 AUSTRALIAN TO BROADWAY. PLEASE REFER TO THE CITY
 BICYCLE MASTERPLAN FOR TYPICAL SECTION(S)
 18) DIRECTIONAL ARROW PAVEMENT MARKINGS ARE MISSING.
 PLEASE INSERT THEM THROUGHOUT WERE NEEDED (E.G. RIGHT
 ARROW FOR THE SOUTHBOUND MOVEMENT, LEFT ARROW FOR THE
 EASTBOUND MOVEMENT AT THE 23RD AND PINEWOOD
 INTERSECTION)
 19) PROVIDE A MINIMUM OF 8-FEET WIDE UN-OBSTRUCTED
 PEDESTRIAN WALKABLE AREA ALONG EACH OF THE ROADS
 TRAVERSING OR FRONTING THE PROPOSED DEVELOPMENT.
 SIDEWALK WIDTH IS INSUFFICIENT ALONG 25TH, OTHER
 STREETS CANNOT BE VERIFIED AS DIMENSIONS ARE MISSING
 20) INSTALL AND SHOWCASE STOP BARS AND SIGNS ON EACH
 GARAGE LEVEL. IT IS RECOMMENDED TO TREAT THE NORTHERN
 AND SOUTHERN EAST-WEST DRIVE AISLES AS THE MAIN ONES,
 WHILE THE NORTH-SOUTH AS MINOR
 21) PER CITY CODE 94-111(Q)(2) RAMP WITH SLOPES GREATER
 THAN 14% MUST PROVIDE A BREAK-OVER TRANSITION
 22) THE PROPOSED PINEWOOD AVENUE RE-ALIGNMENT IS NOT
 CONDUCIVE TO A SAFE VEHICULAR STRAIGHT-THROUGH MOVEMENT
 ACROSS THE 25TH AND 23RD INTERSECTIONS. SUCH MOVEMENT
 SHOULD BE EITHER FORBIDDEN OR FACILITATED BY SIGNAGE,
 STRIPING AND ROADWAY FEATURES SUCH AS FLEXIBLE POLES,
 MIDDLE RAISED ISLANDS AND CHANNELIZATION. PLEASE REVISE
 THE SITE PLAN ACCORDINGLY
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  