2022-10-04 10:55:49STORM #4 WAS GIVEN A PASS WITH SITE PLAN CONDITIONS
 LISTED AT THE BOTTOM OF THESE NOTES.
  
 THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 9/22/22 SUBMITTAL. PREVIOUSLY SATISFIED COMMENTS ARE
 NOT INCLUDED.
  
 1. [PARTIALLY SATISFIED] LABEL ALL THE STREETS ON ALL
 OF THE SHEETS. FOR EXAMPLE, SHEET C1.01 ONLY LABELS
 PINEWOOD AVE. NONE OF THE EAST-WEST STREETS ARE
 LABELED. NEW COMMENT - ON SHEET C3.01 LABEL PINEWOOD
 AVE NORTH AND SOUTH OF 25TH ST.
  
 13. [SATISFIED] REVISE THE PARKING SPACE STRIPING
 DETAIL TO MATCH CITY CODE.
  
 16. [SATISFIED ??? SEE NEW COMMENTS ON THE 9/22/2022
 SUBMITTAL] RCP PIPE (MINIMUM 15 INCHES IN DIAMETER) TO
 BE INSTALLED WITHIN THE RIGHT OF WAY. NEW COMMENT: NOT
 ALL PIPES ARE LABELED. PROPOSED STORM PIPES ON 25TH ST
 AT BROADWAY, ON BROADWAY AVE AT 24TH ST., BROADWAY AT
 NORTHWOOD RD LABELED AS 18" HDPE.
  
 NEW COMMENTS (5/27/2022 SUBMITTAL):
  
 17. [SATISFIED] INDICATE HOW THE EXISTING CATCH BASIN
 ON THE SOUTH SIDE OF 23RD ST EAST OF PINEWOOD DRIVE
 WILL CONNECT TO THE MS4.
  
 18. [NOT SATISFIED ??? TO BE PROVIDED AND REVIEWED WITH
 ENGINEERING PERMIT SUBMITTAL] PROVIDE PRE- AND
 POST-DEVELOPMENT HGL CALCULATIONS FOR THE DRAINAGE
 SYSTEM ON BROADWAY AND 23RD STREET WITH THE ENGINEERING
 PERMIT SUBMITTAL.
  
 19. [NOT SATISFIED] REVIEW DESIGN PLANS IN SFWMD
 PERMITS FOR 24TH ST AND 25TH ST AND OTHER PROJECTS IN
 THE VICINITY FOR STORM PIPE CONNECTIVITY. THE INLET ON
 THE SOUTH SIDE OF 24TH ST EAST OF BROADWAY MAY BE
 CONNECTED TO A MANHOLE SOUTH OF THE STRUCTURE INSTEAD
 OF THE MANHOLE ON BROADWAY AVE. ADDITIONAL COMMENTS:
 THE AS-BUILT PICTURE PROVIDED IN THE 7/15/22 RESPONSE
 LETTER SHOWS THE DRAINAGE SYSTEM BEFORE CORNER BULBOUTS
 WERE CONSTRUCTED ON 24TH STREET ABOUT 12 YEARS AGO. THE
 AFOREMENTIONED MH IS VISIBLE IN THE APRIL 2011 AND
 APRIL 2015 GOOGLE MAP STREETVIEWS.
  
 20. [TO BE SATISFIED AT ENGINEERING PERMIT SUBMITTAL]
 ADDITIONAL GRADES WILL BE NEEDED FOR THE ENGINEERING
 PERMIT SUBMITTAL. NOTE PROPOSED SPOT GRADES WERE
 REMOVED ON THE 9/22/22 SET.
  
 21. [NOT SATISFIED ??? PROPOSED SPOT GRADES WERE
 REMOVED FROM THE PGD PLANS BUT THE CROSS SECTIONS
 APPEAR TO SHOW SIDEWALK AND PARKING SPACE CROSS SLOPES
 OF 4% OR STEEPER, WHICH EXCEEDS THE 2% MAX SHOWN ON THE
 CROSS SECTIONS.] THE FINISHED FLOOR ELEVATIONS AND SPOT
 GRADES ON THE PGD PLANS PROVIDED WHERE THE CROSS
 SECTION SYMBOLS ARE WILL RESULT IN CROSS SLOPES STEEPER
 THAN THE MAX. 2% SHOWN ON THE CROSS SECTIONS FOR THE
 PARKING AREA AND ALLOWED FOR THE SIDEWALK AREA.
  
 22. [PARTIALLY SATISFIED] WILL THERE BE PEDESTRIAN
 ACCESS TO THE SOUTH SIDE OF 23RD STREET AT THE PINEWOOD
 AND BROADWAY INTERSECTIONS? SHOW CROSS WALKS AND CURB
 RAMPS. ADDITIONAL COMMENTS - SHOW CURB RAMP AND
 PEDESTRIAN CROSSWALK SIGN ON THE SOUTH SIDE OF 23RD ST
 EAST OF PINEWOOD AVE SHOW NEW CURB RAMP ON SOUTH SIDE
 OF 23RD STREET AT THE BROADWAY AVE. CROSSWALK. MAKE
 SURE THE CRUB RAMP DOES NOT FALL WITHIN THE EXISTING
 DRIVEWAY APRON OR FLARES.
  
 23. [SATISFIED ??? WILL BE CONFIRMED WITH THE
 ENGINEERING PERMIT SUBMITTAL] ALL CURB RAMPS WILL NEED
 TO BE BROUGHT UP TO CURRENT ADA STANDARDS IF THE
 PAVEMENT ADJACENT TO THE CURB RAMP IS DISTURBED OR
 OVERLAID.
  
 24. [SATISFIED] ADA MATS MAY BE NEEDED WHERE THE
 SIDEWALKS MEET DRIVEWAYS FOR THE GARAGES OR ALLEYS.
  
 25. SHEET C3.05:
 A. [SATISFIED] BUILDING A (NORTHWEST) SERVICE -
 1. CONFIRM PROPOSED 3" WATER SERVICE WILL CROSS AN 8"
 PVC SANITARY SEWER MAIN.
 2. CONFIRM TAP IS TO A 24" WM.
  
 B. [SATISFIED ??? NOTE SHEET C2.02 CALLS OUT STORM PIPE
 AS HDPE] BUILDING A (NORTHEAST) SERVICE - SHOW THE
 EXFILTRATION TRENCH.
  
 C. [SATISFIED] BUILDING A (SOUTHWEST) SERVICE - CONFIRM
 THE WATER SERVICE WILL CROSS 15" RCP STORM AND 8" PVC
 SEWER.
  
 D. [PARTIALLY SATISFIED ??? SHOW 14??? FM. CONFIRM 8???
 SSWR] BUILDING B SERVICE - SHOW PROPOSED STORM PIPE
 BETWEEN EXISTING INLETS.
  
 E. [NOT SATISFIED ??? SHEET C2.02 LABELS PIPE AS 18
 INCH HDPE] BUILDING A (SOUTHEAST) SERVICE -
 2. CONFIRM RCP STORM VS. HDPE STORM.
  
 26. [SATISFIED] SHOW BREAKS IN THE EXFILTRATION TRENCH
 IF WATER OR SEWER SERVICE LINES WILL CROSS IN THE
 ENVELOPE OF THE EXFILTRATION TRENCH.
  
 27. [NOT SATISFIED ??? WILL PROVIDE WITH THE
 ENGINEERING PERMIT SUBMITTAL] PROVIDE DETAILS OF THE
 CONTROL STRUCTURES WITH THE ENGINEERING PERMIT
 SUBMITTAL.
  
 28. [SATISFIED] SECTION B-B - LEFT SIDE OF SECTION IS
 LABELED AS 18.4 FEET LANDSCAPING. WILL THERE BE A
 CONTINUOUS SIDEWALK ON THE WEST SIDE OF THE STREET?
  
 29. [SATISFIED] SECTION E-E - CONFIRM 2.5 FEET
 DIMENSION FOR THE TYPE 'F' CURB. SUM OF DIMENSIONS
 ACROSS RIGHT OF WAY IS LESS THAN 75 FEET.
  
 30. [SATISFIED] SECTION H-H - CONFIRM 2.5 FEET
 DIMENSION FOR THE TYPE 'F' CURB. SUM OF DIMENSIONS
 ACROSS RIGHT OF WAY IS MORE THAN 55 FEET.
  
 NEW COMMENTS (9/22/2022 SUBMITTAL)
  
 31. MOVE THE CONSTRUCTION ENTRANCE OUT OF THE 25TH ST.
 R/W ON THE EROSION CONTROL PLAN.
  
 32. CALLOUT AND NUMBER THE NEW DRAINAGE STRUCTURE ON
 THE SW CORNER OF 25TH ST AND PINEWOOD AVE AND THE PIPE
 CONNECTION TO STRUCTURE EX-1.
  
 33. NUMBER THE MANHOLE STORM STRUCTURE LOCATED BETWEEN
 ST-15 AND ST-14 AND NUMBER THE EXISTING DRAINAGE
 STRUCTURE EAST OF THIS MANHOLE AND LABEL THE STORM PIPE
 BETWEEN THESE UNNUMBERED STRUCTURES ON THE WEST SIDE OF
 BROADWAY AVE NORTH OF 24TH ST.
  
 34. NUMBER THE PROPOSED DRAINAGE STRUCTURE TO THE
 SOUTHWEST OF MH EX-3 AND LABEL THE STORM PIPE BETWEEN
 THESE TWO STRUCTURES NEAR THE INTERSECTION OF 24TH ST
 AND BROADWAY AVE.
  
 35. NUMBER THE PROPOSED DRAINAGE STRUCTURE TO THE
 NORTHWEST OF MANHOLE EX-4 AND LABEL THE STORM PIPE
 BETWEEN THESE STRUCTURES IN THE INTERSECTION OF
 NORTHWOOD ROAD AND BROADWAY AVE.
  
 36. NUMBER THE EXISTING MANHOLE TO THE EAST OF MANHOLE
 EX-4 ON NORTHWOOD ROAD.
  
 37. THE PRELIMINARY STORMWATER MANAGEMENT CALCULATIONS
 WERE REVIEWED TO SEE THE ASSUME WIDTH OF 5 FEET FOR THE
 PROPOSED EXFILTRATION TRENCH. THE EXFILTRATION TRENCHES
 ALONG BROADWAY AVE BETWEEN ST-34 AND ST-35 AND BETWEEN
 ST-36 AND ST-37 ONLY MEASURE 3 FEET IN WIDTH.
  
 38. STRUCTURE EX-3 ON BROADWAY AT 24TH ST MAY NEED TO
 BE REPLACED WITH A LARGER STRUCTURE IN ORDER TO CONNECT
 NEW STORM PIPES TO THE STRUCTURE.
  
 39. STORM PIPE SOUTH OF STRUCTURE ST-14 LABELED (TWICE)
 AS 14 LF 18??? HDPE 1 LF EXFILTRATION TRENCH. THIS
 COMMENT CAN BE ADDRESSED WITH THE ENGINEERING PERMIT
 SUBMITTAL.
  
 40. ON THE PGD PLANS, SHOW EXISTING DRIVEWAY FOR 940
 NORTHWOOD ROAD AND THE DRIVEWAYS ON THE SOUTH SIDE OF
 23RD STREET SO THAT THE PROPOSED BULBOUT FOR THE
 ONE-WAY PORTION OF THE STREET WILL NOT CONFLICT WITH
 THE DRIVEWAYS.
  
 41. PROVIDE A DETAIL FOR A VALLEY GUTTER INLET AND HOW
 THE DROP CURB WILL TRANSITION TO THE VALLEY GUTTER TOP.
  
 *******************************************************
 *****************************
 *******************************************************
 *****************************
 CONDITIONS FOR SITE PLAN APPROVAL (THESE CAN BE
 ADDRESSED WITH THE ENGINEERING PERMIT SUBMITTAL):
  
 - LABEL ALL THE STREETS ON ALL OF THE PLANS (COMMENT
 #1)
  
 - PROVIDE PRE- AND POST-DEVELOPMENT HGL CALCULATIONS
 FOR THE DRAINAGE SYSTEM FROM BROADWAY AVE/26TH ST OR
 BROADWAY AVE/25TH ST TO PINEWOOD AVE/23RD ST. (COMMENT
 #18)
  
 - REVISE STORM PIPE CONNECTION BETWEEN THE INLET ON THE
 SOUTH SIDE OF 24TH ST EAST OF BROADWAY AVE TO THE
 MANHOLE IN THE INTERSECTION OF BROADWAY AVE AND 24TH
 ST. (COMMENT #19)
  
 - PROVIDE PROPOSED SPOT GRADES ON THE PGD PLANS.
 SIDEWALK AND PARKING SPACE CROSS SLOPES ARE NOT TO
 EXCEED 2%. (COMMENTS #20 AND #21)
  
 - SHOW EXISTING DRIVEWAYS ON THE SOUTH SIDE OF 23RD
 STREET. SHOW CURB RAMPS THAT DO NOT INTERFERE WITH THE
 DRIVEWAY APRONS OR DRIVEWAY FLARES. SHOW THAT THE
 PROPOSED BULBOUT EAST OF THE BROADWAY AVE EXTENSION
 WILL NOT CONFLICT WITH THE DRIVEWAYS.(COMMENTS #22 AND
 #40)
  
 - ALL CURB RAMPS WHERE THE ADJACENT PAVEMENT IS
 DISTURBED OR OVERLAID WILL NEED TO BE BROUGHT UP TO
 CURRENT ADA STANDARDS. (COMMENT #23)
  
 - UTILITY PROFILES (SHEET C3.05) TO SHOW AND LABEL ALL
 EXISTING (THAT WILL REMAIN) AND PROPOSED UTILITIES THAT
 THE WATER SERVICES WILL BE CROSSING. COORDINATE PIPE
 CALLOUTS WITH THE PGD AND UTILITY PLANS. (COMMENT #25)
  
 - PROVIDE DETAILS OF THE STORMWATER CONTROL STRUCTURES.
 (COMMENT #27)
  
 - MOVE THE CONSTRUCTION ENTRANCE OUT OF THE R/W.
 (COMMENTS #31)
  
 - CALLOUT AND NUMBER ALL OF THE EXISTING AND PROPOSED
 DRAINAGE STRUCTURES AND STORM PIPES WITHIN THE
 CONSTRUCTION LIMITS. (COMMENTS #32 TO #36)
  
 - LABEL THE WIDTH OF THE EXFILTRATION TRENCHES ON THE
 PDG PLANS (COMMENTS #37 AND #39)
  
 - CONFIRM EXISTING DRAINAGE STRUCTURES DO NOT NEED TO
 BE REPLACED FOR THE PROPOSED MODIFICATIONS TO THE
 STRUCTURES (COMMENT #38)
  
 - PROVIDE A DETAIL FOR A VALLEY GUTTER INLET AND HOW
 THE DROP CURB WILL TRANSITION TO THE VALLEY GUTTER TOP.
 (COMMENT #41)
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT