| Plan Review Notes For Project Z21080015 |
| Project Number |
Z21080015 |
|
| Review Stop |
PU |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2022-08-31 15:39:00 | | | | -ON 24TH ST. EXTEND THE PROPOSED SANITARY SYSTEM TO THE | | | WITHIN THE LIMITS OF THE PROPOSED DEVELOPMENT (THE | | | SPRUCE AKA THE PROPER). | | | -EXTEND THE FORCE MAIN ON BROADWAY TO THE CONNECTION | | | POINT ON 26TH ST. AND TO UPSIZE THE PROPOSED FROM 14? | | | TO 20?. THE CITY EXPECTS TO CONTRIBUTE TOWARDS THIS | | | WORK. | | | -EXTEND THE SANITARY SEWER ON 23RD STREET WESTWARD 100 | | | LINEAR FEET TOWARD PINEWOOD AVE. | | | -IN THE ALLEY NORTH OF NORTHWOOD RD., REMOVE THE | | | SANITARY SEWER FROM UNDER BUILDING OVERHANG AND INSTALL | | | A TERMINAL MANHOLE. | | | -DRAINAGE SYSTEMS ON 23RD STREET BETWEEN BROADWAY AVE | | | AND PINEWOOD AVE AND ON BROADWAY AVE SOUTH OF NORTHWOOD | | | ROAD ARE TO BE MAINTAINED BY THE DEVELOPER. | | | | | | CONTACT MIKE TECHNOW [email protected] WITH ANY | | | QUESTIONS |
| |