| Plan Review Notes For Project Z21080015 |
| Project Number |
Z21080015 |
|
| Review Stop |
PU |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2022-06-27 14:06:54 | -SHOW PINEWOOD ROW AS PRIVATE AND THE PROPOSED GRAVITY | | | SEWER POINT OF CONNECTION ON 24TH ST. | | | -CALL FOR THE GRAVITY MAIN ON 23RD ST TO BE | | | BACK-PITCHED AND REVERSE FLOW DIRECTION INTO THE | | | EXISTING SYSTEM. | | | -THERE IS NO NEED TO EXTEND THE GRAVITY MAIN ON | | | BROADWAY/CANNOT CONNECT INTO ALLEY OFF BROADWAY. | | | -REMOVE BACKFLOWS FROM THE ROW. | | | -NO 3? SERVICES. UPSIZE OR DOWNSIZE. | | | -THE EXISTING FPL DUCT BANK NEEDS TO BE RELOCATED TO | | | PROVIDE SPACING FOR PROPOSED UTILITIES WITHIN THE ROAD | | | ROW. PROPOSED UTILITIES SHOULD NOT BE RUNNING UNDER THE | | | CURB. | | | -THE CITY IS EVALUATING REQUIRED UPSIZING FOR PROPOSED | | | UTILITIES AND WILL NEED TO LOOK AT FLOWS FOR PIPE | | | SIZING/LIFT STATION. | | | -SHOW ALL EXISTING UTILITIES. | | | | | | | | | CONTACT MIKE TECHNOW [email protected] 561-494-1047 |
| |