Date Text
2021-11-18 13:40:31THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY?S OFFICIAL VERTICAL DATUM PER CITY CODE IS
 NGVD1929. THE CITY IS ALLOWING SURVEYS AND PLANS TO USE
 NAVD1988 PROVIDED THE CONVERSION EQUATION BETWEEN
 NAVD1988 AND NGVD1929 IS ALSO PROVIDED. LIST THE
 CONVERSION EQUATION TO NGVD1929 ON THE SURVEY AND ON
 THE ENGINEERING PLANS.
  
 2. LABEL THE STREET NAMES ON THE CIVIL PLAN SHEETS.
  
 3. CONFIRM MATERIAL AND LAYOUT OF EXISTING STORMWATER
 SYSTEM ON 25TH ST.
  
 4. BROADWAY AVE NORTH OF 24TH STREET AND 24TH STREET
 EAST OF BROADWAY ARE MAINTAINED BY FDOT.
  
 5. MINIMUM 15? RCP TO BE INSTALLED WITHIN CITY R/W.
  
 6. CONFIRM EXISTING DRAINAGE STRUCTURES ARE LARGE
 ENOUGH TO ACCEPT NEW STORM PIPE CONNECTIONS.
  
 7. PROVIDE CROSS SECTIONS FROM CENTERLINE OF ROAD TO
 FACE OF BUILDING FOR EACH SIDE AND INTERIOR OF
 DEVELOPMENT.
  
  
 8. SHOW MILL AND PAVEMENT OVERLAY LIMITS ON THE PGD
 PLAN SHEETS.
  
 9. PROVIDE SUFFICIENT OVERHEAD CLEARANCE TO MAINTAIN
 UTILITIES WITHIN THE RIGHT OF WAY INCLUDING THE MAKING
 OF REPAIRS OR REPLACING PIPE AND/OR STRUCTURES WITH
 HEAVY EQUIPMENT.
  
 10. ACCESS EASEMENT FOR THE SIDEWALK ON 23RD ST MAY BE
 REQUIRED.
  
 11. SHOW ADA MATS FOR SIDEWALK RAMPS.
  
 12. EXFILTRATION TRENCHES NEXT TO BUILDINGS MAY MAKE
 REPLACEMENT OF THE SYSTEM IN THE FUTURE PROBLEMATIC.
 SUGGEST MOVING THE EXFILTRATION TRENCHES AWAY FROM THE
 BUILDINGS.
  
 13. IDENTIFY STORMWATER CONTROL STRUCTURES.
  
 14. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS WITH
 EXFILTRATION TRENCHES.
  
 15. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 2. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 3. ACCESS EASEMENT FOR THE SIDEWALK ON 23RD ST MAY BE
 REQUIRED.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved