| Plan Review Notes For Project Z21080015 |
| Project Number |
Z21080015 |
|
| Review Stop |
PU |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-04-13 15:15:38 | -CORRECT PIPE DIMENSIONS ON PINEWOOD. THERE IS AN | | | EXISTING 8? WM. | | | -UPSIZE THE 6? WM ON 25TH ST. (SMALL STRETCH OF PIPE) | | | -THE EXISTING BUSINESSES ON 23RD ST ARE SENDING FLOW TO | | | THE SANITARY SYSTEM. THE ONLY WAY THE SANITARY SYSTEM | | | CAN BE PRIVATE IS IF FLOW FROM THESE PROPERTIES IS | | | DIVERTED. | | | -WILL NEED TO UPSIZE THE SANITARY SYSTEM DOWNSTREAM DUE | | | TO ADDITIONAL IMPACTS ON THE SYSTEM. THE EXISTING | | | SYSTEM HAS THE GRAVITY SEWER BEHIND THE PROPERTIES ON | | | 25TH, THE PROPOSED IMPROVEMENTS SHOULD BE WITHIN THE | | | 25TH ST ROW. | | | -WILL NEED TO SEE ALL THE EXISTING DRY UTILITIES TO | | | FINALIZE THE PROPOSED CITY OWNED UTILITIES. | | | -SHOW THE EXISTING 14? CAS FM ON PINEWOOD AND PROVIDE A | | | PLAN TO ALLOW ACCESS FOR O&M OR PROPOSE THE MAIN BE | | | RELOCATED. IT CANNOT HAVE A BUILDING ON TOP OF IT. | | | -IS THE WATER MAIN PRIVATE AND ARE YOU PROPOSING A | | | MASTER METER? | | | |
| |
Print |
|