Plan Review Notes For Project Z21080014
Project Number Z21080014
Review Stop STORM
Sequence Number 3
Notes
Date Text
2022-08-12 16:43:04THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 6-13-2022 SUBMITTAL. THEY CAN ALL BE LISTED AS
 CONDITIONS FOR SITE PLAN APPROVAL.
  
 1. SHEET C-3: DRAINAGE CALCS.
 A. 5-YEAR RUNOFF VOLUME SHOULD INCLUDE PERVIOUS AREA.
 SCS EQUATION CAN BE USED TO CALCULATE THE VOLUME OF
 RUNOFF.
 B. MINIMUM REQUIRED LENGTH OF TRENCH WOULD BE AROUND 40
 LINEAR FEET.
  
 2. SHEET C-3 DETAIL 4 ? PROPOSED DRIVEWAY CONNECTION
 DETAIL ?
 A. SUGGEST ADDING SLOPE ARROW ON SIDEWALK AND LISTING
 SLOPE AS 2% MAXIMUM.
 B. REMOVE DROP CURB AND SHOW DRIVEWAY APRON TO THE EDGE
 OF PAVEMENT AND CONTROL JOINT WHERE THE BACK OF CURB
 WOULD BE.
 C. SPECIFY SP ASPHALT INSTEAD OF TYPE S-III ASPHALT
 WITHIN THE RIGHT OF WAY.
  
 3. SHEET C-3 PROPOSED PGD PLAN ? LIST CONTOUR INTERVAL
 OR SPOT GRADE LOWER THAN THE BACK OF SIDEWALK TO
 INDICATE SWALE.
  
 4. SHEET C-5 DETAIL 3 PROPOSED SIDEWALK SECTION
 A. SUGGEST ADDING SLOPE ARROW ON SIDEWALK AND LISTING
 SLOPE AS 2% MAXIMUM.
 B. SHOW SWALE SECTION BEHIND THE SIDEWALK.
 C. SPECIFY SP ASPHALT INSTEAD OF TYPE S-III ASPHALT
 WITHIN THE RIGHT OF WAY.
  
 5. WHAT IS THE ROCK TRENCH BETWEEN CB-2 AND BU-1 FOR?
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved