2022-07-02 15:05:26COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR,
 ENG. SERVICES DEPT., 561-494-1098 [email protected] :
  
 O PREVIOUS COMMENT: PROVIDE CCTV VIDEO OF EXISTING
 SANITARY SEWER AND STORMWATER INFRASTRUCTURE ALONG
 ENTIRE PROJECT FRONTAGE. (NOTE: THIS IS A CONDITION OF
 SITE PLAN APPROVAL.)
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR, 561-822-2262, [email protected]
 DID NOT RECEIVE WRITTEN RESPONSE TO PRIOR REVIEW
 COMMENTS:
  
 -BACKFLOW ASSEMBLY NEAR WATER METER NOT SHOWN ON PLANS.
 PLEASE SHOW AND LABEL. MAKE SURE LOCATION COMPLIES WITH
 SMALL BACKFLOW ASSEMBLY STANDARD DETAIL.
  
 -CANNOT FIND RECORD OF WATER METER CURRENTLY INSTALLED
 AT 1156 CLARE AVE. NEW WATER METER WOULD BE REQUIRED.
  
 -FOR A 1 INCH METER, THE WATER SERVICE LINE AND TAP
 SHOULD BE 1 INCH SIZING.
  
 -CANNOT USE SCHEDULE 40 PVC PIPING BETWEEN METER AND
 TAP. MUST USE APPROVED MATERIAL TYPE. PLEASE UPDATE.
  
 -PAVEMENT RESTORATION ON CLARE AVE MUST COMPLY WITH WPB
 STANDARD DETAILS. WOULD BE LARGER THAN VISUALLY
 REPRESENTED ON PLANS.
  
 -SEWER LATERAL CLOSE TO PROPERTY LINE IS NOT SHOWN ON
 LANDSCAPING PLAN. PLEASE UPDATE AND VERIFY NO CONFLICTS
 WITH TREES.
  
 -WATER DEMAND CALCULATIONS MISSING FROM WATER PLAN. IF
 ANY IRRIGATION IS PLANNED TO RUN OFF METERED WATER
 SERVICE, THEN ALSO INCLUDE IN CALCULATIONS.
  
  
 NEW COMMENTS:
  
 -0.75 INCH METER SHOULD HAVE 1 INCH SERVICE LINE AND
 TAP. IF 2 INCH SERVICE LINE IS REQUIRED, THEN INCREASE
 METER SIZE TO 1.5 OR 2 INCH.
  
 -AT FORMAL ENGINEERING SUBMITTAL: CALLOUT WATER SERVICE
 PIPE MATERIAL TYPE.
  
 -PAVEMENT RESTORATION AREA OF CLARE AVE ON PGD PLAN
 LOOKS SMALLER THAN REQUIRED. SEE NOTE 1 ON SD GC8.
  