| Plan Review Notes For Project Z21080014 |
| Project Number |
Z21080014 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-09-08 19:51:28 | 1) PROVIDE COUNTY TPS LETTER | | | 2) PROVIDE A LETTER BY A PROFESSIONAL ENGINEER | | | VALIDATING THE BI-DIRECTIONAL DRIVEWAY | | | 3) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS | | | (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE | | | OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT | | | 4) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR | | | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED | | | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY | | | DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE | | | FILE/DRAWING | | | 5) PROVIDE PARKING TABLE SHOWCASING THE NUMBER OF | | | REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA | | | AND BICYCLE ONES | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|