Date Text
2021-08-05 13:09:44RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPT., 561-494-1098 [email protected] :
  
 1. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER
 ENGINEERING RELATED DOCUMENTS, CLICK HERE OR GO TO: HTT
 PS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FOR
 MS-PERMITS-AND-APPLICATIONS .
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90
 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY:
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, CLICK HERE OR GO TO: HTTPS://WWW.WPB.
 ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FORMS-PERMITS-AN
 D-APPLICATIONS .
 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1040 FOR FURTHER
 ASSISTANCE.
 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER.
 9. PLEASE ADD NOTE TO PLANS SPECIFYING CITY?S
 DOWNSTREAM LIFT STATION NUMBER.
 10. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 11. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 12. PLEASE LABEL WATER AND SANITARY LINES AS PRIVATE
 WHERE APPLICABLE.
 13. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 (OR EXISTING) LOCATION OF WATER METER AND BACKFLOW
 PREVENTION.
 14. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF NEW BACKFLOW DEVICES AND WATER METERS.
 CONTACT HIM AT 561-494-2262 OR [email protected]
 15. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS
 FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS (IF
 ANY).
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -BUILDING IS PROPOSED OVER EXISTING PRIVATE SEWER
 UTILITY PIPE. MAY MAKE MAINTENANCE DIFFICULT. SAME
 SITUATION WITH FIBER OPTIC.
  
 -ARE THERE ANY EXISTING SEWER LATERAL CLEANOUTS NEAR
 PROPOSED BUILDING? IF SO, SHOW AND LABEL ON CIVIL
 PLANS.
  
 -SHOW AND LABEL ALL METERED WATER SERVICES TO PROPERTY
 AND THE ASSOCIATED BACKFLOW ASSEMBLIES ON THE PLANS.
 UTILITY BILLING SYSTEM SAYS SITE 8130 N JOG RD HAS TWO
 ONE INCH WATER METERS, A TWO INCH DOMESTIC METER, AND
 AN EIGHT INCH FIRELINE WITH DETECTOR METER.
  
 -SHOW WATER DEMAND CALCULATIONS ON CIVIL PLAN.
  
 -SHOW AND LABEL ANY GATE VALVES BETWEEN EIGHT INCH DCDA
 AND WATER MAIN.
  
 -DEMO PLAN REFERRED TO A LANDSCAPE PLAN BUT DID NOT SEE
 IT INCLUDED IN SUBMITTAL PACKAGE. PLEASE ADD.
  
 -ALL OF THE CONTAINMENT DOMESTIC BACKFLOW ASSEMBLIES
 ARE SHOWING TO BE OUT OF TESTING COMPLIANCE. SOME OF
 THEM WERE LEAKING, AND THEY ARE OLDER MODELS WITH
 HIGHER LEAD CONTENT. BESIDES BRINGING THEM UP TO
 TESTING COMPLIANCE, CONSIDER REPLACING THEM WITH NEW
 LEAD-FREE ASSEMBLIES.
  
 -THE BACKFLOW ASSEMBLY AT THE LIFT STATION IS LEAKING
 AND IN BAD SHAPE. CONSIDER REPLACING THE BACKFLOW
 ASSEMBLY TO PREVENT BACKFLOW INTO THE POTABLE PLUMBING.
  