Plan Review Notes
Plan Review Notes For Project Z21070018
Project Number Z21070018
Review Stop TRAFFIC
Sequence Number 3
Notes
Date Text
2021-12-22 18:04:25TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE COUNTY TPS LETTER. IT WAS NOT
 PROVIDED IN THE LATEST RE-SUBMISSION.
 2) SATISFIED. PROVIDE SITE PLAN WITH PROPOSED
 TRANSPORTATION FEATURES (I.E. ROAD, SIDEWALK, CURB,
 DRIVEWAY) PROPERLY LABELED AND EXACT WIDTHS SHOWCASED.
 IF ALREADY PROVIDED, PLEASE INDICATE SPECIFIC FILE NAME
 AND/OR SHEET NUMBER(S). LATEST RE-SUBMISSION DID NOT
 INDICATE ANY FILE NOR SHEET NUMBER.
 3) SATISFIED. CONSIDER DESIGNATING THE ALLEY AS ONE-WAY
 AND COORDINATE WITH SANITATION PERTAINING BEST
 DIRECTION. AFTER INTERNAL CONSULTATION WITH SANITATION,
 THE ALLEYWAY SHALL BE DESIGNATED ONE-WAY EASTBOUND
 4) SATISFIED. PROVIDE A WIDER SIDEWALK ALONG OLIVE
 AVENUE. PLEASE REFER TO COMMENT #2.
 5) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC
 CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) ON THE
 OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED
 DEVELOPMENT. LATEST CIVIL DRAWINGS DO NOT SHOW THE
 REQUESTED FEATURES
 6) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES
 CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED IN A
 SEPARATE FILE/DRAWING. UPDATE ANALYSIS ASSUMING
 ALLEYWAY DESIGNATION AS ONE-WAY EASTBOUND.
 7) SATISFIED. IDENTIFY AND DESIGNATE AN EASILY
 ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20
 FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS
 (CIRCUIT BOX AND ELECTRIC CONDUIT). PROVIDE FILE
 NAME/SHEET NUMBER, CLEARLY MARK AND PLACE A CALLOUT FOR
 THE AREA.
 8) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 9) SATISFIED. PLEASE PROVIDE AN INTERSECTION ANALYSIS
 FOR THE BANYAN AND DIXIE INTERSECTION. FUTURE
 CONDITIONS SHALL ASSUME BANYAN BLVD COMPLETE STREET
 CONFIGURATION
 10) PARTIALLY SATISFIED. SETUP A MEETING WITH PLANNING
 AND ENGINEERING TO DISCUSS TRANSPORTATION DEMAND
 MANAGEMENT MEASURES, AS THE TRIPS GENERATED BY THE
 PROPOSED DEVELOPMENT ARE EXCEEDING THE CAPACITY
 ESTIMATED BY THE BANYAN BOULEVARD COMPLETE STREET
 PROJECT. PROVIDE A DRAFT TDM DOCUMENT AND REACH MUTUAL
 AGREEMENT ON THE PROPOSED MEASURES.
  
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved