| 2021-11-15 13:27:48 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER |
| | 561-822-1462 |
| | PROJECT: 300 BANYAN Z21070018 |
| | NOVEMBER 15, 2021 |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | |
| | 1. MAKE THE FOLLOWING CORRECTIONS TO THE TREE |
| | DISPOSITION PLAN: |
| | ? SATISFIED. ADD A COLUMN TO THE CHART FOR MITIGATION |
| | SQUARE FOOTAGE DUE AND SHOW THE AMOUNT FOR EACH TREE |
| | PROPOSED TO BE REMOVED. |
| | COLUMN SHOULD BE LABELED MITIGATION DUE, NOT TREE |
| | CREDITS. TREES WITH A CANOPY 20 FEET OR MORE IN |
| | DIAMETER MUST HAVE THE ACTUAL SQUARE FOOTAGE CALCULATED |
| | AND ENTERED ON THE CHART. |
| | ? SATISFIED. PROVIDE TOTAL OF MITIGATION SQUARE FOOTAGE |
| | DUE. |
| | UPDATE TOTAL WITH MITIGATION RECALCULATED FOR ABOVE. |
| | ? PARTIALLY SATISFIED. PROVIDE A TOTAL OF MITIGATION |
| | SQUARE FOOTAGE PROVIDED BASED ON THE PLANT LIST. |
| | PROVIDE A CHART WITH THE TOTAL FOR EACH SPECIES AND |
| | REMOVE MITIGATION CALCULATIONS FROM SHEET L11, THEY ARE |
| | INCORRECT. TREE CATEGORY LIST MUST BE USED FOR |
| | MITIGATION CREDITS. CATEGORY 1 IS 300 SQ FT CANOPY |
| | CREDIT, CATEGORY 2 IS 150 SQ FT CANOPY CREDIT, CATEGORY |
| | 3 IS 100 SQ FT CANOPY CREDIT, CATEGORY 4 IS 50 SQ FT |
| | CANOPY CREDIT. |
| | |
| | COUNTS DO NOT MATCH PLANT LIST. THERE ARE 13 LIVE OAKS, |
| | NOT 12 (3900 SQ FT) SABAL PALMS ARE CATEGORY 3 AT 100 |
| | SQ FT EACH (400 SQ FT), 7 HOLLY AT 150 EACH (1050 SQ |
| | FT), 2 MEDJOOL CATEGORY 3 AT 100 EACH (200 SQ FT) |
| | TOTAL WOULD BE 8000 SQ FT, LEAVING 614SQ FT TO BE |
| | MITIGATED BY PAYMENT IN LIEU. |
| | |
| | 2. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE |
| | TREES IN GOOD CONDITION TO BE PRESERVED ON SITE OR |
| | RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY |
| | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR |
| | POOR FOR RELOCATION. PROVIDE AN ARBORIST REPORT SHOWING |
| | CONDITION FOR ALL TREES AND RELOCATION POTENTIAL FOR |
| | THE NATIVE TREES. ALL INDIVIDUAL TREES NEED AN ACCURATE |
| | REASON FOR REMOVAL PROVIDED, CANNOT BE A GENERAL |
| | STATEMENT, SO REMOVE THE NOTE. |
| | REMOVE NOTE ON TREE DISPOSITION SCHEDULE SHEET L1A |
| | REGARDING REMOVAL OF TREES AS IT IS NOT ACCURATE OR |
| | RELEVANT. |
| | THE ARBORIST REPORT LISTS ONLY TREE #12 AS GOOD |
| | CONDITION. PROVIDE THE REASON FOR NOT RELOCATING. |
| | |
| | 3. SATISFIED. PROVIDE A DIAGRAM OF THE PROVIDED 25% |
| | PRIVATE OPEN SPACE AREAS FOR CWD-10. IDENTIFY THE TYPE |
| | OF OPEN SPACE AS ALLOWED BY TABLE IV-7 AND DEFINITIONS |
| | IN SECTION 94-109. SHOW HOW THE STANDARDS FOR THE TYPES |
| | OF OPEN SPACE ARE MET FOR VEGETATED AREAS AND TREE |
| | CANOPY SQUARE FOOTAGE BASED ON TABLE IV-8. |
| | SHOW EACH TERRACE PRIVATE OPEN SPACE SQUARE FOOTAGE AND |
| | HOW IT INDIVIDUALLY MEETS THE 20% VEGETATED AREA. THEY |
| | CAN SHOW THE TOTAL AREA PROVIDED, BUT EACH SPACE MUST |
| | MEET THE REQUIREMENTS. PROVIDE ALL SQUARE FOOTAGE AND |
| | PERCENTAGE MEASUREMENTS ON SHEET L8A. |
| | |
| | |
| | 4. SATISFIED. PROVIDE CALCULATIONS FOR REQUIRED STREET |
| | TREES AT ONE FOR EVERY 30 FEET OR PORTION THEREOF FOR |
| | STREETSCAPE LENGTH, AND SHOW THE NUMBER PROVIDED PER |
| | SECTION 94-113 AND 94-116. |
| | STREET TREE CALCULATIONS AND PLAN NEED TO BE PROVIDED. |
| | OLIVE AVE SIDE OF CLEMATIS BUILDING NEEDS TO BE |
| | INCLUDED. REFERENCE THE APPROVED STREETSCAPE PLANS FOR |
| | THE BANYAN STREETSCAPE PROJECT. |
| | PROVIDE THE CALCULATIONS FOR EACH STREETSCAPE LENGTH |
| | FOR BANYAN AND OLIVE ALONG 300 BANYAN AND DIVIDE BY 30 |
| | AND ROUND UP TO SHOW THE REQUIRED NUMBER OF STREET |
| | TREES FOR EACH SIDE. PROVIDE THE NUMBER OF SHADE TREES |
| | FOR EACH SIDE. PALMS MAY NOT BE COUNTED TOWARD SHADE |
| | TREE REQUIREMENT. THERE IS ENOUGH ROOM TO USE LIVE OAKS |
| | FOR ALL REQUIRED STREET TREES. |
| | |
| | 5. PARTIALLY SATISFIED. SHOW THE LOCATIONS OF THE |
| | REQUIRED STRUCTURAL SOIL UNDER HARDSCAPE PER SECTION |
| | 94-113 AND PROVIDE THE TYPICAL DETAIL FOR INSTALLATION. |
| | THE AREA MUST BE 9 X14 FT PARALLEL TO THE CURB FOR EACH |
| | TREE CONSISTING OF PLANTING AREA AND/OR STRUCTURAL |
| | SOIL. |
| | SHOW THE LOCATIONS ON THE LANDSCAPE PLAN. |
| | CORRECT THE LOCATIONS TO SHOW THE STRUCTURAL SOIL ONLY |
| | UNDER THE ADJACENT SIDEWALK. |
| | |
| | 6. SATISFIED. THERE APPEAR TO BE CONFLICTS IN SEVERAL |
| | LOCATIONS BETWEEN PROPOSED STREET TREES AND DRAINAGE |
| | EXFILTRATION LINES ON THE LANDSCAPE PLAN. ADJUST |
| | DRAINAGE LOCATIONS SO THEY DO NOT INFRINGE ON THE |
| | REQUIRED PLANTING AREA OR STRUCTURAL SOIL. |
| | |
| | 7. SATISFIED. SHOW THE LOCATIONS OF ALL UTILITIES ON |
| | THE LANDSCAPE PLAN AND RESOLVE ANY CONFLICTS. |
| | |
| | 8. SATISFIED. PER SECTION 94-113 TREE GRATES ARE ONLY |
| | TO BE USED IF PLANTING STRIPS ARE NOT POSSIBLE. |
| | PLANTING STRIP WITH PAVER PASS THROUGHS FOR PARKING |
| | SPACE ACCESS ARE WARRANTED ON BANYAN. IF PARKING IS NOT |
| | APPROVED ON BANYAN, PLANTING STRIPS MUST BE USED. |
| | THE PLANTING AREAS NEED TO BE LENGTHENED ALONG BOTH |
| | STREETS WITH PASS THROUGHS PLACED FOR PEDESTRIAN ACCESS |
| | FROM THE DROP OFFS. |
| | |
| | |
| | 9. PARTIALLY SATISFIED. PROVIDE A COMPLETE PLANT LIST. |
| | PLANT LIST NEEDS TO BE MODIFIED TO SEPARATE THE |
| | REQUIRED OPEN SPACE PLANT LISTS AND THE SEPARATE |
| | BUILDINGS. |
| | LIVE OAK TREE COUNT IS INCORRECT. |
| | |
| | 10. SATISFIED. REMOVE HIGHRISE CULTIVAR AND INDICATE |
| | SPECIES LIVE OAK OR CATHEDRAL LIVE OAK. |
| | |
| | 11. SATISFIED. ADD A COLUMN FOR DROUGHT TOLERANCE LEVEL |
| | TO THE PLANT LIST. |
| | |
| | 12. SATISFIED. SHOW COMPLIANCE WITH SECTION 94-445 L. |
| | PLANT SPECIES. A MINIMUM OF 60 PERCENT OF PLANT |
| | MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT |
| | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE |
| | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH |
| | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH |
| | FLORIDA LANDSCAPES. PROVIDE THE ACTUAL PERCENTAGE BASED |
| | ON THE PLANT LIST. |
| | REVISE AFTER ALL CHANGES ARE COMPLETE WITH LANDSCAPE |
| | PLAN. |
| | |
| | 13. SATISFIED. PROVIDE BUFFER REQUIREMENTS ON THE CHART |
| | AND LANDSCAPE PLAN FOR THE WEST AREA OF THE LOT |
| | ADJACENT TO THE PROPERTY LINE. STAFF REQUESTS ADDING |
| | ANY LANDSCAPING SUCH AS HEDGING ALONG THE ALLEY |
| | PROPERTY LINE TO IMPROVE THE ENVIRONMENT. |
| | PROVIDE THE ENTIRE PROPERTY LINE LENGTH FOR THE WEST |
| | BUFFER, DIVIDE BY 30 AND ROUND UP FOR THE REQUIRED |
| | NUMBER OF BUFFER TREES. SHOW THE NUMBER PROVIDED. SABAL |
| | PALMS ARE A 3:1 EQUIVALENT TO A REQUIRED TREE. |
| | |
| | 14. MAKE THE FOLLOWING CORRECTIONS TO THE PLANTING |
| | NOTES ON SHEET L10: |
| | ? SATISFIED. CORRECT TO REMOVE CYPRESS MULCH FROM THE |
| | NOTE, IT IS NOT ALLOWED. |
| | ? SATISFIED. ALL PLANTING AREAS SHALL BE NOTED TO BE |
| | BACKFILLED WITH 50/50 MIX OR SIMILAR TO A DEPTH OF 30 |
| | INCHES. |
| | ? SATISFIED. INDICATE ALL PLANT MATERIAL TO BE GRADE#1 |
| | OR BETTER. |
| | CONDITIONS OF APPROVAL |
| | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE |
| | STREET TREES AND RIGHT OF WAY LANDSCAPING AND |
| | IRRIGATION APPROVED WITH THIS PETITION. |
| | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF |
| | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A |
| | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. |
| | |
| |