| Date |
Text |
| 2021-10-14 18:52:37 | 1) NOT SATISFIED. PROVIDE COUNTY TPS LETTER. IT WAS NOT |
| | PROVIDED IN THE LATEST RE-SUBMISISON. |
| | 2) NOT SATISFIED. PROVIDE SITE PLAN WITH PROPOSED |
| | TRANSPORTATION FEATURES (I.E. ROAD, SIDEWALK, CURB, |
| | DRIVEWAY) PROPERLY LABELED AND EXACT WIDTHS SHOWCASED. |
| | IF ALREADY PROVIDED, PLEASE INDICATE SPECIFIC FILE NAME |
| | AND/OR SHEET NUMBER(S). LATEST RE-SUBMISSION DID NOT |
| | INDICATE ANY FILE NOR SHEET NUMBER. |
| | 3) PARTIALLY SATISFIED. CONSIDER DESIGNATING THE ALLEY |
| | AS ONE-WAY AND COORDINATE WITH SANITATION PERTAINING |
| | BEST DIRECTION. AFTER INTERNAL CONSULTATION WITH |
| | SANITATION, THE ALLEYWAY SHALL BE DESIGNATED ONE-WAY |
| | EASTBOUND |
| | 4) PARTIALLY SATISFIED. PROVIDE A WIDER SIDEWALK ALONG |
| | OLIVE AVENUE. PLEASE REFER TO COMMENT #2. |
| | 5) NOT SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE |
| | BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) |
| | ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING THE |
| | PROPOSED DEVELOPMENT. LATEST CIVIL DRAWINGS DO NOT SHOW |
| | THE REQUESTED FEATURES |
| | 6) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR |
| | GARBAGE TRUCK AND SERVICE VEHICLES DRIVING IN AND OUT |
| | OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC |
| | ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED |
| | IN A SEPARATE FILE/DRAWING. UPDATE ANALYSIS ASSUMING |
| | ALLEYWAY DESIGNATION AS ONE-WAY EASTBOUND. |
| | 7) NOT SATISFIED. IDENTIFY AND DESIGNATE AN EASILY |
| | ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 |
| | FEET) AND PROVIDE BASIC ELECTRIFICATION READINESS |
| | (CIRCUIT BOX AND ELECTRIC CONDUIT). PROVIDE FILE |
| | NAME/SHEET NUMBER, CLEARLY MARK AND PLACE A CALLOUT FOR |
| | THE AREA. |
| | 8) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE |
| | NUMBER OF REQUIRED AND PROVIDED PARKING SPACES, |
| | INCLUSIVE OF ADA AND BICYCLE ONES |
| | 9) PLEASE PROVIDE AN INTERSECTION ANALYSIS FOR THE |
| | BANYAN AND DIXIE INTERSECTION. FUTURE CONDITIONS SHALL |
| | ASSUME BANYAN BLVD COMPLETE STREET CONFIGURATION |
| | 10) SETUP A MEETING WITH PLANNING AND ENGINEERING TO |
| | DISCUSS TRANSPORTATION DEMAND MANAGEMENT MEASURES, AS |
| | THE TRIPS GENERATED BY THE PROPOSED DEVELOPMENT ARE |
| | EXCEEDING THE CAPACITY ESTIMATED BY THE BANYAN |
| | BOULEVARD COMPLETE STREET PROJECT |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| |