Plan Review Notes
Plan Review Notes For Project Z21070018
Project Number Z21070018
Review Stop ENG - PPRC
Sequence Number 2
Notes
Date Text
2021-10-14 07:36:19COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPT., 561-494-1098
 [email protected] :
  
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER.
 4. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER PIPES ALONG ENTIRE PROJECT FRONTAGE.
 5. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 6. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 7. FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW
 PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER,
 STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND
 OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL
 AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW.
 DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY,
 PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES LOCATED ON THE RIGHT-OF-WAY.
 8. FOR FORMAL ENGINEERING SUBMITTAL , CUT AND CAP
 UTILITIES NOT IN USE, AND REMOVE ANY ABANDONED UTILITY
 LINES LARGER THAN 2 INCHES FROM CITY RIGHT OF WAY.
 9. FOR FORMAL ENGINEERING SUBMITTAL , PROVIDE DEDICATED
 UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS.
 10. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER
 METER AND BACKFLOW PREVENTION.
 11. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT
 DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW
 PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL
 BACKFLOWS.
 12. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE; AND
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO
 NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE
 CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE
 ENGINEERING PERMIT.
 13. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES
 OF PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT
 OF WAY AND SHOW ANY CROSSINGS/CONFLICTS.
 14. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 15. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD
 RIGHT OF WAY.
 16. FOR FORMAL ENGINEERING SUBMITTAL PROVIDE SANITARY
 ELEVATIONS AT MANHOLE TIE-IN.
 17. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 18. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES
 ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL
 ADDRESSES.
 19. FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN
 IN CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50
 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH PER CURRENT CITY OF WPB STANDARD DETAIL
 GC-8.
 20. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 FOLLOWUP COMMENTS:
  
 -RESPONSES DO NOT SEEM TO MATCH CIVIL PLANS. NOT SURE
 IF OLD PLAN WAS SUBMITTED OR RESPONSES ARE INACCURATE.
 PLEASE UPDATE BOTH AS NEEDED AND RESUBMIT. WILL LIST
 THE PROBLEMATIC ONES BELOW:
  
 WATER SERVICE STANDARD DETAILS ON CIVIL PLANS ARE OLD
 REVISION. PLEASE USE NEWEST REVISION.
 RESPONSE: NEWEST DETAILS HAVE BEEN INCORPORATED INTO
 THIS RESUBMITTAL.
  
 WATER METERS OF SIZE THREE INCHES OR LARGER NEED TO BE
 INSTALLED ABOVE-GROUND REFERENCING THE ABOVE-GROUND
 METER STANDARD DETAIL.
 RESPONSE: NOTED. PROJECT WILL USE A THREE-INCH DOMESTIC
 METER.
  
 ADJUST METER MAINTENANCE BYPASS SO IT IS ON THE SOUTH
 SIDE OF THE METER INSTEAD OF THE NORTH SIDE.
 RESPONSE: METER BYPASS ORIENTATION HAS BEEN ADJUSTED
 ACCORDINGLY.
  
 FOR A THREE-INCH METER THE WATER SERVICE SHOULD BE
 FOUR-INCH DIP. IF NEED SIX-INCH DIP WATER SERVICE, THEN
 ADJUST METER TO SIX-INCH SIZE.
 RESPONSE: WE ARE ASSUMING A 4? DOMESTIC WATER SERVICE
 LINE WHICH WILL USE A 3? METER.
  
 RELOCATE METER ASSEMBLY FOUR FEET EAST.
 RESPONSE: METER ASSEMBLY HAS BEEN RELOCATED. REFER TO
 SHEET C 4.1.
  
 SHOW AND LABEL PROPOSED CLEANOUTS ON THE SEWER PLAN.
 RESPONSE: CLEANOUTS ARE SHOWN ON THE SEWER PLAN.
  
 SHOW AND LABEL TAPPING VALVES AT WATER MAIN FOR FIRE
 AND WATER SERVICES.
 RESPONSE: TAPPING VALVES ADDED FOR THE FIRE AND
 DOMESTIC WATER SERVICES.
  
 CONSIDER DUAL/PARALLEL DOMESTIC BACKFLOW ASSEMBLIES TO
 MINIMIZE WATER OUTAGE DURING BACKFLOW MAINTENANCE.
 RESPONSE: NOTED. PARALLEL DOMESTIC BACKFLOWS WILL BE
 SPECIFIED.
  
 CIVIL PLANS DO NOT SHOW 301 CLEMATIS ST. PLEASE ADD
 SEPARATE SHEET SHOWING WATER AND SEWER UTILITY FOR THAT
 PROPERTY AND ADD WATER DEMAND CALCULATIONS. ALSO SHOW
 WATER AND SEWER SERVICES.
 RESPONSE: NO SITE CIVIL WORK IS BEING DONE FOR 301
 CLEMATIS. ADDING THIS TO THE PLAN SHEET WILL REQUIRE
 REDUCING THE DRAWING SCALE SIGNIFICANTLY. WE HAVE
 ELECTED TO SHOW THE 301 CLEMATIS PROPERTY ON A SEPARATE
 SHEET.
  
 CIVIL PLANS DO NOT SHOW PAVEMENT RESTORATION FOR OLIVE
 AVE. PLEASE SHOW AND LABEL THOSE BOUNDARIES AND ADD
 APPROPRIATE STANDARD DETAIL.
 RESPONSE: PAVEMENT RESTORATION ON OLIVE AVENUE HAS BEEN
 ADDED TO THE PLANS.
  
  
 NEW COMMENTS:
  
 -SITE PLAN SHOWS DOOR FROM SOUTHERN BUILDING OPENING
 INTO ALLEY ROW.
  
 -PROPOSED DOMESTIC BACKFLOW ASSEMBLY SHOULD NOT BE IN
 UTILITY EASEMENT.
  
 -IS A GAS LINE RUNNING THROUGH A GREASE TRAP?
  
 -COMMUNICATION UTILITY CONFLICT WITH PROPOSED MH1. HOW
 WILL IT BE RESOLVED?
  
 -WILL DOOR HIT FDC AT NW CORNER?
  
 -WILL DOOR HIT DOMESTIC BACKFLOW ASSEMBLY?
  
 -SHOW AND LABEL PROPOSED METERED IRRIGATION WATER
 SERVICE AND BACKFLOW ASSEMBLY.
  
 -TWO SECTIONS OF 2 FOOT CONCRETE KNEE WALL IS PROPOSED
 DIRECTLY ABOVE DOMESTIC WATER SERVICE. THAT IS A
 MAINTENANCE CONFLICT FOR THE WATER SERVICE.
  
 -ADD ABOVE GROUND TO LABEL OF DOMESTIC WATER METER.
 REFERENCE THE CORRECT STANDARD DETAIL AND ADD STANDARD
 DETAIL TO CIVIL PLAN SET.
  
 -RECOMMEND DRAIN FOR ROOM WITH DCDA IN CASE IT FLOODS.
  
 -LABEL GATE VALVE FOR FIRELINE AT WATERMAIN POINT OF
 SERVICE.
  
 -AT FORMAL ENGINEERING SUBMITTAL, ADD FIRE FLOW
 CALCULATIONS TO WATER PLAN.
  
 -THERE ARE AT LEAST THREE ACTIVE METERED WATER SERVICES
 AT ALLEY NEAR NORTHWEST CORNER OF 301 CLEMATIS. UPDATE
 DEMO AND WATER PLANS TO SHOW MORE CLEARLY WHAT IS
 HAPPENING TO THEM. ALSO SHOW THE ASSOCIATED BACKFLOW
 ASSEMBLIES. THE NORTHERN METER IS IRRIGATION AND MAY
 CONFLICT WITH PROPOSED GREASE TRAPS. THE SOUTHERN TWO
 ARE FOR 107 N OLIVE AVE AND 109 N OLIVE.
  
 -THE CONCRETE UTILITY POLES IN ALLEY NEAR LOADING ZONES
 MAY CONFLICT WITH LOADING ZONE TRAFFIC. THEY ARE ALSO
 NOT SHOWED ON LANDSCAPE PLAN. PLEASE CLEARLY LABEL
 THOSE ON ALL PLAN SETS WITH WHAT IS HAPPENING TO THEM.
 THEY SEEM TO HAVE WIRES RUNNING FROM THEM ACROSS THE
 ALLEY TO 301 CLEMATIS.
  
 -DEMO PLAN SAYS WOOD POLES ARE BEING REMOVED IN ALLEY.
 VERIFY IF THERE ARE OVERHEAD UTILITIES AND CONDUITS
 RUNNING FROM THEM. IF SO, SHOW AND LABEL WHAT IS
 HAPPENING TO THE OVERHEAD UTILITIES AND CONDUITS ON THE
 CIVIL PLANS.
  
  
 COMMENTS PER MIKE TECHNOW 561-494-1047 OR
 [email protected] WITH ANY QUESTIONS OR CONCERNS.
  
 -PLEASE PROVIDE UTILITY CROSSING PROFILE AND UTILITY
 CROSSING INFORMATION.
 -THE FLOW APPEARS TO BE ENTERING THE GREASE TRAP? WHERE
 IS THIS COMING FROM?
 - CALL OUT HORIZONTAL SEPARATION OF EXISTING UTILITIES.
 -CALL OUT POINT OF SERVICE FOR 6? DIP PRIVATE WATER
 LINE.
 -SHOW DRY UTILITIES ON N OLIVE AVE.
 -THE CALL OUT SHOULD READ ?TAPPING TEE? ON PROP. 8?
 FIRE LINE OFF OF N OLIVE.
 -SHOW EXISTING VALVES AND MANHOLES WITHIN MILLING AND
 RESURFACING LIMITS. (ON THE SOUTH END OF N OLIVE).
 -ADD NOTE CALLING OUT STORM INLET AT SE CORNER.
 -NEED A VALVE AFTER THE TAP ON THE PROP. 6? FIRE LINE.
 -ADD ADDITIONAL VALVE IN METER ASSEMBLY PER CITY
 DETAIL.
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved