Plan Review Notes
Plan Review Notes For Project Z21070018
Project Number Z21070018
Review Stop Z
Sequence Number 1
Notes
Date Text
2021-08-12 10:47:28SETBACKS
 1. PROJECT DOES NOT COMPLY WITH TABLE IV-50 BUILDING
 REQUIREMENTS ? CWD 10-12. BUILDING IS ENCROACHING INTO
 THE MINIMUM SETBACK (16?) ON LEVELS 3 AND ABOVE ALONG
 OLIVE STREET, PLEASE ADJUST.
  
 OPEN SPACE
 2. PLEASE PROVIDE INFORMATION ON PRIVATE OPEN SPACE
 (SEC. 94-109 TABLE IV-7), SPECIFYING THE AMOUNT,
 LOCATION, AND TYPE OF SPACE. CONFIRM COMPLIANCE WITH
 STANDARDS LOCATED IN TABLE FOR EACH TYPE OF SPACE.
 3. PLEASE EXPLAIN WHAT THE OPEN SPACE/ACTIVE USE ALONG
 THE GROUND LEVEL OF NORTHERN FA?ADE ON BANYAN IS.
  
 ACTIVE USE
 4. PROPOSED PROJECT IS NOT IN COMPLIANCE WITH MINIMUM
 GROUND ACTIVE USES (65%) ALONG PRIMARY PEDESTRIAN
 STREETS (OLIVE AND BANYAN). SEE TABLE IV-50 BUILDING
 REQUIREMENTS ? CWD 10-12
 5. PROPOSED PROJECT IS NOT IN COMPLIANCE WITH MINIMUM
 LINER ACTIVE USES [2 TO 3 STORIES (44?)] WHICH REQUIRES
 60%.
  
 STREETSCAPE
 6. STREETSCAPE REQUIREMENTS ARTICLE IV: SEC. 94-113,
 PROPOSED PROJECT AND PLANS SHOULD REFLECT/COORDINATE
 WITH THE CITY?S PROPOSED STREETSCAPE IMPROVEMENTS ALONG
 BAYAN BOULEVARD.
 7. CITY WOULD LIKE TO DISCUSS WIDENING THE SIDEWALK IN
 FRONT OF HISTORIC BUILDING (301 CLEMATIS) TO ALLOW FOR
 LANDSCAPING ALONG OLIVE.
 8. STREET TREES SHALL BE PLANTED ALONG OLIVE FRONTAGE
 ADJACENT TO THE CURB AT A MAXIMUM OF 30 FEET ON CENTER.
 TEES SHALL BE A MINIMUM OF 20 FEET IN HEIGHT, AND HAVE
 A MINIMUM OF EIGHT FEET CLEAR TRUNK, OR AS APPROVED BY
 THE CITY. STRUCTURAL SOIL SHALL BE INSTALLED MEETING
 THE CITY APPROVED STANDARDS AS A MINIMUM REQUIREMENT
 UNDER ADJACENT PAVED AREAS, OR SUSPENDED PAVEMENT SOIL
 CELL SYSTEMS MAY BE INSTALLED AS AN ALTERNATIVE.
  
 BIKES, PARKING, & LOADING
 9. AS PER ARTICLE IV: SEC. 94-111, BICYCLE PARKING MUST
 INCLUDE:
 A) (I) SECURE BIKE RACKS AND/OR STORAGE AT A RATIO OF
 ONE BICYCLE PARKING SPACE PER EVERY 15 PARKING SPACES
 PROVIDED
 B) (II) A MINIMUM OF ONE SHOWER AND CHANGING FACILITY
 SHALL BE PROVIDED TO BE AVAILABLE FOR ALL TENANTS AND
 SHALL BE LOCATED WITHIN THE BUILDING, OR WITHIN 200
 FEET OF THE BUILDING ENTRANCE, FOR DEVELOPMENTS GREATER
 THAN 50,000 SQUARE FEET IN GROSS BUILDING AREA.
 C) ADDITIONALLY, 1 SPACE PER 100 FT. OF STREET
 FRONTAGE; TO BE LOCATED ALONG ROW OR STREET FRONTAGES
 FOR PUBLIC ACCESS.
 D) PLEASE INDICATE THE LOCATION OF SHOWER FACILITIES
 10. AS PER SUBSECTION 94-485(P), PROPOSED PROJECT NOT
 IN COMPLIANCE WITH REQUIRED LOADING STANDARDS
 A) REQUIRES 2 (10?X50?) FOR COMMERCIAL USES; PROPOSED
 PLAN WILL REQUIRE A VARIANCE
 11. PLEASE PROVIDE AN AUTOTURN STUDY AND SERVICE PLAN
 12. STAFF DOES NOT SUPPORT LOCATION OF PORTE COCHERE
 DROP-OFF ALONG OLIVE.
 A) MAY SUPPORT ALTERNATIVE ON-STREET DROP-OFF.
 13. PLEASE INCLUDE TABLE OF PARKING REQUIREMENTS.
 14. PLEASE DIMENSION ALL DRIVE AISLE AND PARKING
 SPACES.
  
 FACADE ARTICULATION
 15. WEST ELEVATION OF PROPOSED BUILDING HAS THE FIRST 7
 FLOORS AS A BLANK WALL. DOES NOT COMPLY WITH CODE SEC.
 94-109 TABLE IV-4. BLANK WALLS ARE NOT PERMITTED, AND
 EXCEEDS 20% OF THE WESTERN FA?ADE. REQUIRES
 FENESTRATION OR ARCHITECTURAL TREATMENTS.
 16. ADDITIONAL ARCHITECTURAL TREATMENT SHALL BE
 PROVIDED TO SCREEN PARKING USES.
 17. SOME ADDITIONAL ARCHITECTURAL TREATMENTS ON PORTION
 OF ALLEY (SOUTHERN FA?ADE) WOULD BE PREFERRED AS IT
 DOESN?T HAVE FENESTRATION.
  
 GENERAL SITE
 18. CITY CURRENTLY HAS A TRASH COMPACTOR ON SITE.
 FURTHER DISCUSSIONS NECESSARY TO EXPLORE OPTION TO KEEP
 COMPACTOR ON SITE.
 19. FURTHER DISCUSSION NEEDED TO DETERMINE IF ALLEYWAY
 NEEDS TO BE ONE-WAY.
 20. PLEASE IDENTIFY IF THERE ARE ANY HARDSCAPE
 IMPROVEMENTS PROPOSED TO THE ALLEYWAY.
 21. PLEASE EXPLORE HOW THE DESIGN OF PROPOSED BUILDING
 CAN BETTER RELATE TO THE HISTORIC BUILDING.
 A) SCALE COMPATIBILITY WITH HISTORIC BUILDING, HISTORIC
 TREATMENTS, ETC.
 22. PROVIDE SITE TABLE WITH:
 A) SITE AREA
 B) GROSS BUILDING AREA ALLOWED
 C) GROSS BUILDING AREA PROPOSED
 D) TDRS NEEDED FOR PROJECT
 23. PLEASE LABEL WHAT THE USES ARE THAT ARE COUNTED AND
 THOSE USES EXCLUDED FROM THE GROSS BUILDING AREA
 CALCULATIONS.
 24. PLEASE CONFIRM THAT GROSS BUILDING AREA
 CALCULATIONS ARE MEASURED FROM THE EXTERIOR WALL.
 25. PLEASE IDENTIFY LOCATION OF GAS METERS AND ANY
 OTHER ABOVE GROUND UTILITY CONNECTIONS.
 A) FIRE DEPT. CONNECTION ON BANYAN SHALL BE
 WALL-MOUNTED.
 26. OPEN GROUND FLOOR AREAS EXCEED THE MAX PERMITTED
 GROUND FLOOR SETBACK.
  