Plan Review Notes
Plan Review Notes For Project Z21070018
Project Number Z21070018
Review Stop STORM
Sequence Number 1
Notes
Date Text
2021-08-12 09:24:42THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY'S OFFICIAL VERTICAL DATUM PER CITY CODE IS
 NGVD1929. THE CITY IS ALLOWING SURVEYS AND PLANS TO USE
 NAVD1988 PROVIDED THE CONVERSION EQUATION BETWEEN
 NAVD1988 AND NGVD1929 IS ALSO PROVIDED. PROVIDE THE
 CONVERSION EQUATION TO NGVD1929 ON THE SURVEY.
  
 2. PROVIDE PIPE MATERIAL, PIPE INVERTS OF EXISTING
 DRAINAGE SYSTEM IN THE PUBLIC RIGHTS OF WAY.
  
 3. THE STORM PIPE ALONG THE WEST PROPERTY LINE APPEARS
 TO BE LOCATED UNDER THE PROPOSED BUILDING.
  
 4. DO NOT CONNECT THE ONSITE DRAINAGE SYSTEM FOR 300
 BANYAN TO THE EXISTING ALLEY DRAINAGE SYSTEM.
  
 5. EXPLORE CONNECTING THE ROOF DRAINS IN THE ALLEY FOR
 301 CLEMATIS TO THE ALLEY DRAINAGE SYSTEM.
  
 6. INDICATE IF THE EXISTING ELECTRICAL CONDUITS WILL
 REMAIN ONSITE.
  
 7. MOVE SANITARY MH2 OUT OF THE ALLEY R/W.
  
 8. ON THE EROSION CONTROL PLAN, SHOW INLET PROTECTION
 FOR DRAINAGE STRUCTURES WITH THE R/W.
  
 9. PROVIDE DETAIL FOR SPECIAL TYPE 'F' CURB AND GUTTER
 USED IN THE DOWNTOWN AREA.
  
 10. PROVIDE TYPICAL CROSS SECTIONS FROM THE FACE OF
 BUILDING TO THE CENTERLINE OF THE R/W.
  
 11. PROVIDE CROSS SECTION OF THE ALLEY FROM BUILDING
 FACE TO BUILDING FACE.
  
 12. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA.
  
 13. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS IN
 CONTROL STRUCTURES USED TO SURCHARGE EXFILTRATION
 TRENCHES.
  
 14. CONSIDER ALTERNATIVE STORMWATER STORAGE SYSTEM.
 EXFILTRATION SYSTEMS CAN HAVE A SHORT LIFE SPAN.
  
 15. COORDINATE DESIGN WITH THE BANYAN BLVD STREETSCAPE
 PROJECT.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE COPY OF SFWMD ERP PERMIT(S) BEFORE START OF
 CONSTRUCTION.
  
 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)