Date Text
2022-01-19 12:58:54-TWO MANHOLES IN ALLEY APPEAR TO BE OVERLAPPING ON
 CIVIL PLAN. PLEASE ENSURE MANHOLES HAVE ADEQUATE
 CLEARANCE DISTANCE.
  
 -WATER SERVICE SHOWN AT NORTH SIDE OF 300 BANYAN
 PROPERTY HAS NO EXISTING WATER METER INSTALLED. IF IT
 REMAINS AFTER BANYAN STREETSCAPE PROJECT WOULD HAVE TO
 COORDINATE METER INSTALLATION AND ACCOUNT SETUP WITH
 CITY WPB, AND PAY ALL APPLICABLE FEES, DEPOSITS, AND
 CHARGES.
  
 -PROPOSED METERED IRRIGATION WATER SERVICE AT NORTH
 SIDE OF PROPERTY DOES NOT SHOW PROPOSED BACKFLOW
 ASSEMBLY INSTALLATION. BACKFLOW ASSEMBLY WOULD HAVE TO
 BE INSTALLED FOR THE WATER SERVICE TO BE USED, AND MUST
 BE AT LOCATION APPROVED BY WPB PUBLIC UTILITIES.
  
 -VERTICAL MOUNT DCDA FIRELINE BACKFLOW ASSEMBLY IS
 NONSTANDARD. WOULD REQUIRE ENGINEER DESIGN AND
 EVALUATION. PROPOSED BACKFLOW ASSEMBLY MAKE/MODEL WOULD
 HAVE TO BE USC-APPROVED FOR VERTICAL ORIENTATION.
  
 -SITE PLAN SAYS FIRELINE BACKFLOW ASSEMBLY IS LOCATED
 IN AN OUTDOOR STORAGE ROOM AND APPEARS TO HAVE OPEN
 ENTRY. RECOMMEND VERIFYING LOCATION IS ACCEPTABLE TO
 FIRE DEPARTMENT AND MEETS NFPA STANDARDS.
  
 -SITE AND LANDSCAPING PLANS NEEDS TO BE UPDATED TO SHOW
 RELOCATION OF BIKE RACK NEAR THE WATER METER FOR 300
 BANYAN AT SOUTH SIDE OF PROPERTY. CIVIL PLANS SHOW IT
 REMOVED ALRIGHT. (NOT SURE IF THEY SHOW THE NEW
 LOCATION)
  
 -PROPOSED 3 INCH BFP AND METER FOR 301 CLEMATIS ST. IS
 LOCATED SUBSTANTIALLY CLOSE TO EXISTING BUILDING.
 CONCERN WAS BROUGHT UP ABOUT BUILDING FOOTERS AND
 EXCAVATION ADJACENT BUILDING. EOR SUGGESTED DIMENSIONS
 OF BUILDING FOOTER AND SAFETY OF EXCAVATION COULD BE
 CONFIRMED. PLEASE SUBMIT THOSE VERIFICATIONS AT FORMAL
 ENGINEERING SUBMITTAL.
  
 -PROPOSED 3 INCH METER FOR 301 CLEMATIS ST. MUST BE
 INSTALLED ABOVE-GROUND IN CONFORMANCE TO WPB SD WS-3
 SEP2019.
  
 -PROPOSED 3 INCH METERED WATER SERVICE FOR 301 CLEMATIS
 ST. IS NONSTANDARD DESIGN. MAY NEED REVISION AT FORMAL
 ENGINEERING SUBMITTAL.
  
 -PROPOSED 3 INCH BACKFLOW ASSEMBLY FOR 301 CLEMATIS ST.
 APPEARS TO BE IN THE RIGHT OF WAY. RECOMMEND VERIFYING
 LOCATION IS ACCEPTABLE WITH DEVELOPMENT SERVICES.
  
 -PLANS DO NOT SHOW EXISTING LARGE DIAMETER FIRELINE
 WATER SERVICE OR DCDA FIRELINE BACKFLOW INSTALLATION AT
 301 CLEMATIS ST. SHOW BOTH AT FORMAL ENGINEERING
 SUBMITTAL.
  
 -PROPOSED 4 INCH PARALLEL RPZ MAY HAVE BIGGER FOOTPRINT
 THAN SHOWN ON CIVIL PLANS.
  
 -CIVIL PLANS DO NOT SHOW CROSSING INFORMATION OR
 PROFILES FOR UTILITY WORK IN ALLEY. WHEN REVIEWED AT
 FORMAL ENGINEERING SUBMITTAL, IF THERE ARE ANY
 CONFLICTS, ADDITIONAL WORK OR PLAN REVISION MAY BE
 NEEDED.
  
 -CIVIL PLANS DO NOT COMMUNICATE PROPOSED LOCATION FOR 2
 INCH BFP AT EAST SIDE OF 301 CLEMATIS AND WHAT IS
 HAPPENING TO THE ASSOCIATED WATER METER. ANY PROPOSED
 LOCATION MUST BE REVIEWED BY PUBLIC UTILITIES AND
 RETEST/REINSPECTION WOULD BE REQUIRED.
  
 -CIVIL PLANS SHOW EXSS AND EXDN FLOWING TO ONE MANHOLE
 IN OLIVE. EOR NEEDS TO VERIFY IF THIS IS ACCURATE AND
 UPDATE PLANS AS NEEDED.
  
 -EXISTING METERED WATER SERVICES TO 301 CLEMATIS ST.
 BUILDING ARE NOT SHOWN AND LABELED ON WATER PLAN WITH
 WHAT IS HAPPENING TO THEM. UPDATE AT FORMAL ENGINEERING
 SUBMITTAL.
  
 -PLANS ARE MISSING SEVERAL STANDARD DETAILS INCLUDING
 SMALL METERED WATER SERVICE, LARGE METERED WATER
 SERVICE, AND FIRELINE BACKFLOW ASSEMBLY. ADD AT FORMAL
 ENGINEERING SUBMITTAL.
  
 -PLANS FOR EXISTING OVERHEAD UTILITIES AND UTILITY
 POLES ALONG THE ALLEYWAY WERE PREVIOUSLY UNCERTAIN.
 NEWEST REVISION PLANS STILL DO NOT SEEM TO ACCOUNT FOR
 THEM, OR DETAIL WHAT IS HAPPENING TO THEM.
  
2022-01-19 12:56:20ENGINEERING
 -TWO MANHOLES IN ALLEY APPEAR TO BE OVERLAPPING ON
 CIVIL PLAN. PLEASE ENSURE MANHOLES HAVE ADEQUATE
 CLEARANCE DISTANCE.
  
 -WATER SERVICE SHOWN AT NORTH SIDE OF 300 BANYAN
 PROPERTY HAS NO EXISTING WATER METER INSTALLED. IF IT
 REMAINS AFTER BANYAN STREETSCAPE PROJECT WOULD HAVE TO
 COORDINATE METER INSTALLATION AND ACCOUNT SETUP WITH
 CITY WPB, AND PAY ALL APPLICABLE FEES, DEPOSITS, AND
 CHARGES.
  
 -PROPOSED METERED IRRIGATION WATER SERVICE AT NORTH
 SIDE OF PROPERTY DOES NOT SHOW PROPOSED BACKFLOW
 ASSEMBLY INSTALLATION. BACKFLOW ASSEMBLY WOULD HAVE TO
 BE INSTALLED FOR THE WATER SERVICE TO BE USED, AND MUST
 BE AT LOCATION APPROVED BY WPB PUBLIC UTILITIES.
  
 -VERTICAL MOUNT DCDA FIRELINE BACKFLOW ASSEMBLY IS
 NONSTANDARD. WOULD REQUIRE ENGINEER DESIGN AND
 EVALUATION. PROPOSED BACKFLOW ASSEMBLY MAKE/MODEL WOULD
 HAVE TO BE USC-APPROVED FOR VERTICAL ORIENTATION.
  
 -SITE PLAN SAYS FIRELINE BACKFLOW ASSEMBLY IS LOCATED
 IN AN OUTDOOR STORAGE ROOM AND APPEARS TO HAVE OPEN
 ENTRY. RECOMMEND VERIFYING LOCATION IS ACCEPTABLE TO
 FIRE DEPARTMENT AND MEETS NFPA STANDARDS.
  
 -SITE AND LANDSCAPING PLANS NEEDS TO BE UPDATED TO SHOW
 RELOCATION OF BIKE RACK NEAR THE WATER METER FOR 300
 BANYAN AT SOUTH SIDE OF PROPERTY. CIVIL PLANS SHOW IT
 REMOVED ALRIGHT. (NOT SURE IF THEY SHOW THE NEW
 LOCATION)
  
 -PROPOSED 3 INCH BFP AND METER FOR 301 CLEMATIS ST. IS
 LOCATED SUBSTANTIALLY CLOSE TO EXISTING BUILDING.
 CONCERN WAS BROUGHT UP ABOUT BUILDING FOOTERS AND
 EXCAVATION ADJACENT BUILDING. EOR SUGGESTED DIMENSIONS
 OF BUILDING FOOTER AND SAFETY OF EXCAVATION COULD BE
 CONFIRMED. PLEASE SUBMIT THOSE VERIFICATIONS AT FORMAL
 ENGINEERING SUBMITTAL.
  
 -PROPOSED 3 INCH METER FOR 301 CLEMATIS ST. MUST BE
 INSTALLED ABOVE-GROUND IN CONFORMANCE TO WPB SD WS-3
 SEP2019.
  
 -PROPOSED 3 INCH METERED WATER SERVICE FOR 301 CLEMATIS
 ST. IS NONSTANDARD DESIGN. MAY NEED REVISION AT FORMAL
 ENGINEERING SUBMITTAL.
  
 -PROPOSED 3 INCH BACKFLOW ASSEMBLY FOR 301 CLEMATIS ST.
 APPEARS TO BE IN THE RIGHT OF WAY. RECOMMEND VERIFYING
 LOCATION IS ACCEPTABLE WITH DEVELOPMENT SERVICES.
  
 -PLANS DO NOT SHOW EXISTING LARGE DIAMETER FIRELINE
 WATER SERVICE OR DCDA FIRELINE BACKFLOW INSTALLATION AT
 301 CLEMATIS ST. SHOW BOTH AT FORMAL ENGINEERING
 SUBMITTAL.
  
 -PROPOSED 4 INCH PARALLEL RPZ MAY HAVE BIGGER FOOTPRINT
 THAN SHOWN ON CIVIL PLANS.
  
 -CIVIL PLANS DO NOT SHOW CROSSING INFORMATION OR
 PROFILES FOR UTILITY WORK IN ALLEY. WHEN REVIEWED AT
 FORMAL ENGINEERING SUBMITTAL, IF THERE ARE ANY
 CONFLICTS, ADDITIONAL WORK OR PLAN REVISION MAY BE
 NEEDED.
  
 -CIVIL PLANS DO NOT COMMUNICATE PROPOSED LOCATION FOR 2
 INCH BFP AT EAST SIDE OF 301 CLEMATIS AND WHAT IS
 HAPPENING TO THE ASSOCIATED WATER METER. ANY PROPOSED
 LOCATION MUST BE REVIEWED BY PUBLIC UTILITIES AND
 RETEST/REINSPECTION WOULD BE REQUIRED.
  
 -CIVIL PLANS SHOW EXSS AND EXDN FLOWING TO ONE MANHOLE
 IN OLIVE. EOR NEEDS TO VERIFY IF THIS IS ACCURATE AND
 UPDATE PLANS AS NEEDED.
  
 -EXISTING METERED WATER SERVICES TO 301 CLEMATIS ST.
 BUILDING ARE NOT SHOWN AND LABELED ON WATER PLAN WITH
 WHAT IS HAPPENING TO THEM. UPDATE AT FORMAL ENGINEERING
 SUBMITTAL.
  
 -PLANS ARE MISSING SEVERAL STANDARD DETAILS INCLUDING
 SMALL METERED WATER SERVICE, LARGE METERED WATER
 SERVICE, AND FIRELINE BACKFLOW ASSEMBLY. ADD AT FORMAL
 ENGINEERING SUBMITTAL.
  
 -PLANS FOR EXISTING OVERHEAD UTILITIES AND UTILITY
 POLES ALONG THE ALLEYWAY WERE PREVIOUSLY UNCERTAIN.
 NEWEST REVISION PLANS STILL DO NOT SEEM TO ACCOUNT FOR
 THEM, OR DETAIL WHAT IS HAPPENING TO THEM.
  
2021-11-10 15:56:25PUBLIC ART REQUIREMENT:
 TOTAL CONSTRUCTION COSTS OF THIS DEVELOPMENT ARE OVER
 $500,000 IT IS SUBJECT TO THE PUBLIC ART REQUIREMENT AS
 PER CITY ORDINANCE.
 SECTION 78-129: ALL PRIVATE DEVELOPMENT PROJECTS,
 INCLUDING NEW CONSTRUCTION, OR THE RENOVATION OR
 IMPROVEMENT OF AN EXISTING BUILDING, WHERE TOTAL
 CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $500,000 ARE SUBJECT TO THE PUBLIC ART REQUIREMENT.
 OPTION 1: INSTALL ARTWORK ON THE DEVELOPMENT SITE
 VALUED IN AN AMOUNT NOT LESS THAN ONE PERCENT OF THE
 TOTAL CONSTRUCTION COSTS; OR
 OPTION 2: CONTRIBUTE AN AMOUNT EQUAL TO 75 PERCENT OF
 ONE PERCENT OF THE TOTAL CONSTRUCTION COSTS FOR DEPOSIT
 TO THE PUBLIC ART ACCOUNT.
 A COMPLETED PUBLIC ART ASSESSMENT APPLICATION IS
 REQUIRED AT TIME OF BUILDING PERMIT SUBMITTAL.
  
 CONTACT SYBILLE WELTER, ADMINISTRATOR OF PUBLIC ART &
 CULTURE AT [email protected] TO OBTAIN AN ART ASSESSMENT
 APPLICATION AND REVIEW THE REQUIREMENTS.
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved