| Plan Review Notes For Project Z21070016 |
| Project Number |
Z21070016 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-08-12 12:47:43 | TRAFFIC COMMENTS | | | 1) PROVIDE SITE PLAN IN THE TRAFFIC STUDY | | | 2) PROVIDE COUNTY TPS LETTER | | | 3) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS | | | (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE | | | OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT | | | 4) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND | | | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED | | | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY | | | DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE | | | FILE/DRAWING | | | 5) IDENTIFY AND DESIGNATE AN EASILY ACCESSIBLE | | | MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 FEET) AND | | | PROVIDE BASIC ELECTRIFICATION READINESS (CIRCUIT BOX | | | AND ELECTRIC CONDUIT) | | | 6) PROVIDE PARKING TABLE SHOWCASING THE NUMBER OF | | | REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA | | | AND BICYCLE ONES | | | 7) RE-DO AND RESUBMIT AUTOTURN ANALYSIS FOR THE | | | EASTBOUND MOVEMENT | | | 8) PROPOSED VALET OPERATIONS AND PICK-UP LOCATION DO | | | NOT SEEM SAFE AND SOUND. PLEASE REVISE AND RESUBMIT | | | VALET CIRCULATION PLANS AND CORRESPONDING NARRATIVE | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | | | | | | | |
| |
Print |
|