Date Text
2021-08-05 13:06:23COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPT., 561-494-1098
 [email protected] :
  
 1. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER
 ENGINEERING RELATED DOCUMENTS, CLICK HERE OR GO TO: HTT
 PS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FOR
 MS-PERMITS-AND-APPLICATIONS .
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90
 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY:
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, CLICK HERE OR GO TO: HTTPS://WWW.WPB.
 ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FORMS-PERMITS-AN
 D-APPLICATIONS .
 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1040 FOR FURTHER
 ASSISTANCE.
 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER.
 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29).
 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER ALONG ENTIRE PROJECT FRONTAGE.
 11. PLEASE ADD NOTE TO PLANS SPECIFYING CITY?S
 DOWNSTREAM LIFT STATION NUMBER.
 12. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 13. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 14. PLEASE LABEL WATER LINES AS PRIVATE WHERE
 APPLICABLE.
 15. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION.
 16. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 17. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS
 FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS.
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -VERIFY WITH WPB FIRE MARSHAL THAT PROPOSED DCDA
 LOCATION IS ACCEPTABLE.
  
 -SEPARATE THE FIRELINE FROM THE DOMESTIC WATER SERVICE
 WITH ITS OWN PIPING FROM THE WATER MAIN.
  
 -DOMESTIC WATER METER FOOTPRINT ON UTILITY PLAN LOOKS
 SUBSTANTIALLY SMALLER THAN A TYPICAL LARGE METERED
 WATER SERVICE.
  
 -METERS THREE INCHES OR LARGER NEED TO BE INSTALLED
 ABOVE-GROUND AND OUTSIDE OF BUILDING.
  
 -DOMESTIC BACKFLOW ASSEMBLIES NEED TO BE INSTALLED
 OUTSIDE OF BUILDING. SHOW AND LABEL THEM ON THE UTILITY
 PLAN.
  
 -CONSIDER DUAL/PARALLEL DOMESTIC BACKFLOW ASSEMBLIES TO
 MINIMIZE WATER OUTAGES DURING BACKFLOW MAINTENANCE.
  
 -WILL A SEPARATE METERED IRRIGATION WATER SERVICE BE
 NEEDED?
  
 -THERE IS A CLEANOUT IN ALLEY WHERE DOORS OPEN WHICH
 MAY CONFLICT WITH USE OF EACH AT THE SAME TIME.
  
 -ADD WATER DEMAND CALCULATIONS TO UTILITY PLAN.
  
 -IF THERE WILL BE DEMOLITION, DEMOLITION PLAN NEEDS TO
 BE SUBMITTED.
  
 -ALLEY IS ONE-WAY FROM WEST TO EAST. IT IS ALSO NARROW
 AT BOTH ENDS AND THERE MAY BE SOME POLES AND BOLLARDS
 THROUGHOUT. CAN PROPOSED LOADING DOCK BE UTILIZED BY
 THE NEEDED VEHICLES BASED ON THAT INFORMATION?
  
 -WILL ALL OF THE METERED PARKING SPOTS ON DATURA REMAIN
 AFTER PROJECT COMPLETED?
  
 -HISTORIC PICTURES AND SURVEY SHOW TALL UTILITY POLE IN
 ALLEY ADJACENT SOUTH PROPERTY LINE. PLEASE SHOW AND
 LABEL ON UTILITY PLAN.
  
 -FIBER OPTIC BOX IN ALLEY NOT SHOWING ON UTILITY PLAN.
 PLEASE ADD AND LABEL. DO SAME WITH ELECTRIC VAULT.
  
 -WATER MAINS AND/OR SEWER MAINS MAY NEED TO BE REPLACED
 BY APPLICANT TO FACILITATE PROPOSED SEWER LATERALS AND
 WATER SERVICES.
  
 -ON UTILITY PLAN PLEASE SHOW THE BOLLARDS, DCDA, AND
 STREET SIGNS IN ALLEY.
  
 -LABEL THE FIRE HYDRANT NEAR SOUTHEAST AREA OF PROPERTY
 TO THE UTILITY PLAN.
  
 -SOME OF THE BUILDING STRUCTURES APPEAR TO BE THE IN
 THE SETBACKS. IS THAT ALLOWED?
  
 -ON THE SITE PLAN AND UTILITY PLAN, PLEASE LABEL THE
 TWO OBJECTS JUST NORTH OF THE PUMP ROOM.
  
 -LANDSCAPING PLAN ONLY SHOWS TREES BEING REMOVED.
 PLEASE UPDATE LANDSCAPING PLAN TO SHOW ANY OTHER
 PROPOSED OR EXISTING LANDSCAPING SUCH AS TREES, BUSHES,
 PLANTS, AND GRASS. VERIFY TREES WILL NOT CONFLICT WITH
 UTILITIES. ALSO ADD SEPARATE SHEET SHOWING UTILITIES
 OVERLAID WITH LANDSCAPING.
  
 COMMENTS PER MIKE TECHNOW 561-494-1047 OR
 [email protected] WITH ANY QUESTIONS OR CONCERNS.
  
 ADDITIONAL COMMENTS TO THE STANDARDS:
 -CALL OUT PIPE SIZE AND MATERIAL.
 -SHOW EXISTING VALVES.
 -CALL OUT EASEMENTS POINT OF SERVICE CONNECTIONS.
 -PROVIDE PROFILE OF EXISTING UTILITIES (WATER, SEWER
 AND STORM) WITHIN CITY R/W.
 -PROVIDE PROFILE FOR POINT OF SERVICE CONNECTION.
 -PROVIDE NOTE THAT THIS IS WITHIN LIFT STATION #21
 SERVICE BOUNDARY.
 -PROVIDE CALCULATION FOR SELECTED METER SIZE.
 -INCLUDE UTILITY CONFLICT/CROSSING INFO INCLUDING SOFT
 DIG/TEST HOLE REPORTS.
  
  
  
  
  
  