| 2022-04-12 20:05:17 | TRAFFIC COMMENTS |
| | 1) ARE THERE ANY CHANGES IN TRIP GENERATION? IF SO: |
| | 2) PROVIDE UPDATED TRAFFIC STATEMENT |
| | 3) PROVIDE COUNTY TPS LETTER |
| | 4) PROVIDE A QUEUE ANALYSIS FOR THE PROPOSED |
| | PICK-UP/DROP-OFF LOCATION. ANALYSIS MUST SHOWCASE |
| | VEHICLES? PATHS TO/FROM THE GARAGE AND OPERATIONAL |
| | DETAILS (E.G. HOURS OF OPERATION, NUMBER OF VALET, |
| | ETC.) |
| | |
| | SITE COMMENTS |
| | 5) IF SANITATION OR DELIVERY VEHICLES WILL TRAVERSE THE |
| | PROPOSED DEVELOPMENT, PROVIDE AUTOTURN ANALYSIS WITH |
| | VEHICLE DYNAMIC ENVELOPES CLEARLY DEFINED. ANALYSIS |
| | SHOULD BE PROVIDED IN A SEPARATE FILE/DRAWING |
| | 6) IDENTIFY AND DESIGNATE AN EASILY ACCESSIBLE |
| | MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 FEET) AND |
| | PROVIDE BASIC ELECTRIFICATION READINESS (CIRCUIT BOX |
| | AND ELECTRIC CONDUIT) |
| | 7) PROVIDE BICYCLE RACKS NEARBY THE ENTRANCE |
| | 8) INSTALL AN 8 FEET WIDE SIDEWALK AT TRINITY PARK ON |
| | THE NORTH SIDE OF THE PROPOSED DEVELOPMENT |
| | 9) ROADWAY WIDTH MUST BE A MINIMUM OF 18 FEET WIDE, |
| | REDESIGN/REALLOCATE THE PROPOSED ISLAND BY THE VALET |
| | SITE ACCORDINGLY |
| | 10) REDESIGN THE EXIT DRIVEWAY ON FLAGLER DR TO ALLOW |
| | STRAIGHT AND RIGHT-TURN MOVEMENTS |
| | 11) INSTALL DO NOT ENTER SIGN IN FRONT OF THE FLAGLER |
| | DRIVEWAY |
| | 12) INSTALL NO RIGHT-TURN SIGN UPSTREAM OF THE FLAGLER |
| | DRIVEWAY ALONG THE SB DIRECTION |
| | 13) PROVIDE PAVEMENT MARKINGS (E.G. LANE, DIRECTIONAL) |
| | TO BETTER MANAGE VEHICULAR MOVEMENTS BY THE |
| | PICK-UP/DROP-OFF AREA |
| | 14) INSTALL FIXED METAL BOLLARDS EVERY 10 FEET ALONG |
| | BOTH SIDEWALKS FOR PEDESTRIAN SAFETY AND NO-PARKING |
| | ENFORCEMENT PURPOSES |
| | 15) REALIGN THE WALKWAY FROM TRINITY PARK SO THAT IS |
| | PERPENDICULAR TO THE SOUTHERN SIDEWALK. INSTALL A |
| | PEDESTRIAN CROSSING ACCORDINGLY |
| | |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| | |
| | |
| | |
| |