| Date |
Text |
| 2022-04-01 13:05:24 | Z21060007 - 777 S FLAGLER AMEND - RESUB |
| | 1. PLEASE PROVIDE RESPONSE TO PREVIOUS COMMENTS: |
| | 2. THE CITY OF WEST PALM BEACH HAS A NUMBER OF |
| | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY |
| | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND |
| | WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW |
| | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER |
| | ENGINEERING RELATED DOCUMENTS, CLICK HERE OR GO TO: HTT |
| | PS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FOR |
| | MS-PERMITS-AND-APPLICATIONS . |
| | 3. CODE OF ORDINANCES, CITY OF WEST PALM BEACH, |
| | FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED |
| | SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90 |
| | UTILITIES, ARTICLE I. SEC. 90-7. |
| | POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE |
| | FACILITIES OF THE CITY: |
| | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE |
| | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY |
| | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, |
| | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. |
| | 4. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH |
| | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR |
| | MORE INFORMATION, CLICK HERE OR GO TO: HTTPS://WWW.WPB. |
| | ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FORMS-PERMITS-AN |
| | D-APPLICATIONS . |
| | 5. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY |
| | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC |
| | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF |
| | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE |
| | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL |
| | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT |
| | [email protected] OR 561-494-1040 FOR FURTHER |
| | ASSISTANCE. |
| | 6. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS |
| | OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, |
| | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND |
| | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, |
| | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE |
| | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING |
| | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, |
| | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL |
| | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER |
| | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE |
| | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN |
| | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. |
| | PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT |
| | MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL |
| | EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT, |
| | INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & |
| | TELECOMMUNICATION FACILITIES LOCATED ON THE |
| | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL |
| | UTILITY CROSSINGS. |
| | 7. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY |
| | ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY |
| | ROW. |
| | 8. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE |
| | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB |
| | DEVELOPMENT APPLICATION). |
| | 9. UPDATE CALCULATIONS ON PLANS OF EXISTING AND |
| | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM |
| | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE |
| | PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER. |
| | 10. NEW CONSTRUCTION OF WATER/SEWER SHALL COMPLY WITH |
| | LATEST CITY STANDARD DETAILS. PLEASE UPDATE PLANS |
| | ACCORDINGLY. |
| | |
| | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD |
| | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, |
| | PLEASE CONTACT 561-494-2262 OR [email protected]: |
| | |
| | -PLEASE CLARIFY PPRC PROJECT. IT IS ENTITLED PHILLIPS |
| | POINT, BUT THE CIVIL PLAN COVER SHEET SAYS ESPERANTE |
| | STREETSCAPE WITH A LARGER AREA ENCOMPASSING SEVERAL |
| | PROPERTIES ON THE PROJECT LOCATION MAP. SEVERAL SHEETS |
| | OF CIVIL PLAN SET ALSO MISSING OR OMITTED. IF THIS |
| | PROJECT IS JUST FOR 777 S FLAGLER, THEN PLEASE SUBMIT |
| | ALL SHEETS SHOWING 777 S FLAGLER PROPERTY. |
| | |
| | -PGD PLAN ADJACENT LAKEVIEW AVE SHOWS LIGHT POLE IN |
| | SIDEWALK THAT IS CALLED OUT FOR REMOVE RELOCATE ON DEMO |
| | PLAN. |
| | |
| | -PGD PLAN SHOWS LIGHT POLE REMAINING IN SIDEWALK JUST |
| | WEST OF DRIVEWAY ADJACENT LAKEVIEW AVE THAT IS NOT |
| | CALLED OUT ON DEMO PLAN. IS THAT CORRECT OR AS |
| | INTENDED? |
| | |
| | -PLEASE UPDATE TD4 TO CLEARLY SHOW WHAT IS HAPPENING TO |
| | THE TREES ADJACENT LAKEVIEW AVE. NO SYMBOL SHOWN FROM |
| | DISPOSITION LEGEND. |
| | |
| | -THERE IS A DOUBLE SIDED STREET SIGN ADJACENT SOUTHWEST |
| | CORNER OF BUILDING AND LAKEVIEW AVE. PLANS SHOULD |
| | ADDRESS WHAT IS HAPPENING TO IT. IF VIEW BLOCKED BY |
| | TREE, THEN CONSIDER ADJUSTING LOCATION IN LANDSCAPING |
| | AREA. |
| | |
| | -THERE IS A STREET SIGN ON NORTH SIDE OF TREE 35. WILL |
| | IT BE VIEWABLE TO VEHICLES WITH PROPOSED LIGHT POLE |
| | INSTALLED ON LL4? |
| | |
| | -SHOW FPL MANHOLE IN FRONT OF STAIRWAY ADJACENT |
| | LAKEVIEW AVE ON HARDSCAPE PLAN AND MAKE SURE DOES NOT |
| | CONFLICT WITH PROPOSED LIGHT POLE ON LL4. |
| | |
| | -HARDSCAPE PLAN IS SHOWING LIGHT POLE AND STREET SIGN |
| | IN PROPOSED SIDEWALK ADJACENT LAKEVIEW, BUT THEY ARE |
| | GETTING REMOVED OR RELOCATED. |
| | |
| | -SHOW AND LABEL ANY EXISTING OR PROPOSED SIDEWALK |
| | EASEMENTS. (SOME MAY BE REQUIRED DUE TO PROPOSED |
| | IMPROVEMENTS) |
| | |
| | -ADD A LEGEND ON PGD PLAN SHOWING WHAT THE DIFFERENT |
| | SHADED AREAS ARE. |
| | |
| | -THERE IS A WATER WELL VAULT SHOWED IN PROPOSED |
| | SIDEWALK. IF INTENDED TO BE WALKED ON, RECOMMEND |
| | CHECKING FURTHER TO MAKE SURE THAT THE VAULT IS IN |
| | SUITABLE CONDITION AND THAT IT CAN BE ADJUSTED TO MATCH |
| | PROPOSED FINISHED GRADE. |
| | |
| | -PGD PLAN SHOWS DOORS OPENING INTO AREAS THAT LOOK LIKE |
| | LANDSCAPING ON THE NORTH SIDE OF BUILDING. IS THAT |
| | CORRECT; AND WILL THERE BE ELEVATION DIFFERENCE BETWEEN |
| | DOOR AND LANDSCAPING GRADE? |
| | |
| | -ARE ANY ADDITIONAL SEWER CLEANOUTS NEEDED? IF SO, SHOW |
| | ON UTILITY PLAN. |
| | |
| | -FIRELINE IS NOT COMPLIANT WITH BACKFLOW PROTECTION. |
| | NEEDS TO BE UPGRADED TO ABOVE-GROUND DETECTOR ASSEMBLY |
| | WHICH WOULD BE LOCATED ON PRIVATE PROPERTY. RECOMMEND |
| | INCLUDING IN THIS PROJECT AS UNDERGROUND PIPING MAY |
| | NEED REPLACEMENT, VAULT STRUCTURE WOULD NEED REMOVAL, |
| | AND WILL TAKE UP SPACE ON SITE. |
| | |
| | -WILL WATER DEMAND INCREASE? IF SO, ADD WATER DEMAND |
| | CALCULATIONS ON UTILITY PLAN AND ENSURE THAT EXISTING |
| | WATER SERVICE IS SUFFICIENT. |
| | |
| | -PLANTING PLAN IS SHOWING TWO STRM PIPES RUNNING ACROSS |
| | TRINITY PL THAT ARE NOT SHOWN ON CIVIL PLANS. PLEASE |
| | VERIFY AND MAKE SURE ALL PLAN SETS MATCH. |
| | |
| | -LANDSCAPING PLANS SHOW LIGHT POLE IN PROPOSED SIDEWALK |
| | ALONG FLAGLER AT EAST SIDE OF BUILDING. PLEASE ADD |
| | CIVIL PLAN SHEETS FOR THAT AREA AND LABEL IF LIGHT POLE |
| | IS INTENDED TO REMAIN. |
| | |
| | -PLANS DO NOT SHOW EXISTING SIGN POLES ALONG FLAGLER. |
| | |
| | -PROPOSED SEWER LATERAL IN RIGHT OF WAY SHOULD BE AT |
| | LEAST 6 INCH SIZE. |
| | |
| | -DEMO PLAN SAYS FDC NEAR NORTHEAST AREA OF PROPERTY |
| | WILL REMAIN, BUT UTILITY PLAN MAKES IT LOOK LIKE |
| | MOVING. PLEASE CLARIFY ON PLANS. |
| | |
| | -PLANS SHOW STOP SIGN AT END OF CROSSWALK AT TRINITY |
| | AND CHASE INTERSECTION IN MIDDLE OF PEDESTRIAN TRAFFIC. |
| | IS IT POSSIBLE TO RELOCATE SO NOT IN PEDESTRIAN |
| | TRAFFIC? |
| | |
| | -PGD PLAN DOES NOT SHOW TRENCH DRAIN AT GARAGE ENTRANCE |
| | ON CHASE. |
| | |
| | -LH3 SHOWS AN FDC IN SIDEWALK. |
| | |
| | -PLANS SHOW ALL OF CHASE STREET WITH PAVERS, BUT DEMO |
| | PLAN ONLY SHOWS PORTION OF CHASE ST. BEING AFFECTED. |
| | PLEASE CLARIFY INTENTION. |
| | |
| | -DO PLANS TAKE INTO ACCOUNT CURRENT CONSTRUCTION WORK |
| | TAKING PLACE ON CHASE ST.? |
| | |
| |
Print |