Plan Review Notes For Project Z21060007
Project Number Z21060007
Review Stop STORM
Sequence Number 1
Notes
Date Text
2021-07-08 10:34:48THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. CONSIDER ADDING A 'NO RIGHT TURN' SIGN FOR EASTBOUND
 S. FLAGLER DRIVE BEFORE THE TURN ONTO TRINITY PLACE.
  
 2. THERE APPEARS TO BE 2 INCH DROP AT THE EAST SIDE OF
 THE NEW CONNECTION BETWEEN TRINITY PLACE AND S. FLAGLER
 DRIVE (PROPOSED 3.24 FEET TO EXISTING 3.08).
  
 3. NO DETECTIBLE WARNING HATCHING PER THE SHEET LEGEND
 IS SHOWN ON SHEET C5.00.
  
 4. CONSIDER ADJUSTING THE NORTH END OF THE SIDEWALK
 NEXT TO THE DROP OFF AREA TO AVOID THE STORMWATER
 MANHOLE.
  
 5. IT APPEARS RUNOFF FROM MOST OF THE DROP OFF AREA
 WILL DRAIN TO S. FLAGLER DRIVE. REGRADE THIS AREA TO
 LIMIT THE AMOUNT OF RUNOFF TO S. FLAGLER DRIVE.
  
 6. VERIFY THE PROPOSED RIM ELEVATION OF 4.80 FT NAVD
 FOR THE EXISTING INLET SHOWN EAST OF THE SECTION A-A
 SYMBOL. THE NEAREST SPOT GRADE ON THE EP NEXT TO THE
 VALLEY GUTTER IS 4.16 FT NAVD.
  
 7. FOR ENGINEERING PERMIT SUBMITTAL, PROVIDE A DETAIL
 FOR RAISING THE EXISTING STRUCTURES TO GRADE.
 'CHIMNEYS' MORE THAN 8 INCHES HIGH MAY NOT PROVIDE
 ACCESS TO THE BOTTOM OF THE STRUCTURE.
  
 8. FOR ENGINEERING PERMIT SUBMITTAL, PROVIDE A CATCH
 BASIN DETAIL SHOWING FLUSH GRATE TO BE USED IN LINE
 WITH THE VALLEY GUTTER.
  
 9. PLEASE NUMBER THE DRAINAGE AND SANITARY STRUCTURES
 FOR EASE OF REFERENCE.
  
 10. CAN THE YARD DRAIN SHOWN SOUTH OF THE SECTION B-B
 SYMBOL BE LOCATED OVER THE INTERSECTION OF THE TWO
 PROPOSED 12 INCH HDPE PIPES.
  
 11. USE MINIMUM 15 INCH DIAMETER PIPE, RCP WHEN
 FEASIBLE.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP OR ERP MODIFICATION
 IF THERE IS AN EXISTING PERMIT.
  
 4. DRAINAGE CALCULATIONS WILL BE REVIEWED WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  