| Plan Review Notes For Project Z21060003 |
| Project Number |
Z21060003 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-07-08 10:27:38 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. THE CITY?S OFFICIAL VERTICAL DATUM PER CITY CODE IS | | | NGVD1929. THE CITY IS ALLOWING SURVEYS AND PLANS TO USE | | | NAVD1988 PROVIDED THE CONVERSION EQUATION BETWEEN | | | NAVD1988 AND NGVD1929 IS ALSO PROVIDED. LABEL THE | | | VERTICAL DATUM AND CONVERSION EQUATION TO NGVD1929 ON | | | ALL CIVIL ENGINEERING SHEETS WITH ELEVATION | | | INFORMATION. | | | | | | | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
| |
Print |
|