2021-07-06 18:35:261. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER
 ENGINEERING RELATED DOCUMENTS, CLICK HERE OR GO TO: HTT
 PS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FOR
 MS-PERMITS-AND-APPLICATIONS .
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90
 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY:
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, CLICK HERE OR GO TO: HTTPS://WWW.WPB.
 ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FORMS-PERMITS-AN
 D-APPLICATIONS .
 4. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 5. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 6. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER.
 7. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29).
 8. PLEASE ADD NOTE TO PLANS SPECIFYING CITY?S
 DOWNSTREAM LIFT STATION NUMBER.
 9. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 10. PLEASE LABEL WATER LINES AS PRIVATE WHERE
 APPLICABLE.
 11. THERE IS AN ACTIVE ENGINEERING SUBMITTAL E21050024
 THAT APPEARS TO HAVE THE SAME PLAN SET. PLEASE CLARIFY.
 12. PLEASE PROVIDE DETAILS ON UTILITIES ?
 EXISTING/PROPOSED?
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 DIRECT: (561) 494-1098 [email protected]
  
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -IS ANY SPECIAL APPROVAL NEEDED TO BUILD CONCRETE
 TRAILER PAD IN 6 FOOT TELEPHONE EASEMENT?
  
 -THE PAD IS OVER SEWER UTILITY WHICH MAY MAKE
 MAINTENANCE DIFFICULT FOR PROPERTY OWNER.
  
 -ELECTRIC UTILITY NEAR CONCRETE PAD DOES NOT SPECIFY IF
 IT IS UNDERGROUND OR OVERHEAD. IF UNDERGROUND,
 MAINTENANCE MAY BE DIFFICULT.
  
 -WILL THE WATER FEEDING THE RPZ COME FROM ST. MARY?S
 PLUMBING?
  
 -WILL WASTEWATER FROM TRAILER TIE INTO THE SEWER LINE
 UNDERNEATH CONCRETE PAD?
  
 -WILL TRAILER STRUCTURE BE ON TOP OF SS CLEANOUT?
  
 -WHAT WILL PERMANENT CONCRETE PAD BE USED FOR AFTER 6
 MONTHS WHEN TEMPORARY TRAILER IS REMOVED?
  
 -WHERE ARE THE FOUR RELOCATED TREES BEING RELOCATED TO?
  
 -THERE IS LARGE DIAMETER WATER PIPE IN THE AREA, SUCH
 AS FOR THE NEARBY FIRE HYDRANT, BUT ENGINEERING PLAN
 DOES NOT SHOW ANY. RECOMMEND VERIFYING WATER PIPING NOT
 UNDER PROPOSED CONCRETE PAD.
  
 -WILL THE EXISTING DROP CURB NEAR THE NORTHWEST CORNER
 OF PROPOSED PAD REMAIN?
  
  