| 2021-07-06 18:35:26 | 1. THE CITY OF WEST PALM BEACH HAS A NUMBER OF |
| | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY |
| | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND |
| | WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW |
| | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER |
| | ENGINEERING RELATED DOCUMENTS, CLICK HERE OR GO TO: HTT |
| | PS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FOR |
| | MS-PERMITS-AND-APPLICATIONS . |
| | 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH, |
| | FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED |
| | SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90 |
| | UTILITIES, ARTICLE I. SEC. 90-7. |
| | POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE |
| | FACILITIES OF THE CITY: |
| | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE |
| | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY |
| | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, |
| | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. |
| | 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH |
| | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR |
| | MORE INFORMATION, CLICK HERE OR GO TO: HTTPS://WWW.WPB. |
| | ORG/GOVERNMENT/ENGINEERING/ENGINEERING-FORMS-PERMITS-AN |
| | D-APPLICATIONS . |
| | 4. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS |
| | OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, |
| | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND |
| | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, |
| | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE |
| | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING |
| | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, |
| | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL |
| | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER |
| | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE |
| | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN |
| | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. |
| | PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT |
| | MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL |
| | EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT, |
| | INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & |
| | TELECOMMUNICATION FACILITIES LOCATED ON THE |
| | RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL |
| | UTILITY CROSSINGS. |
| | 5. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE |
| | DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB |
| | DEVELOPMENT APPLICATION). |
| | 6. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND |
| | PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM |
| | AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE |
| | PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER. |
| | 7. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION |
| | (NAVD 88 AND NGVD 29). |
| | 8. PLEASE ADD NOTE TO PLANS SPECIFYING CITY?S |
| | DOWNSTREAM LIFT STATION NUMBER. |
| | 9. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND |
| | IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED |
| | AREAS. |
| | 10. PLEASE LABEL WATER LINES AS PRIVATE WHERE |
| | APPLICABLE. |
| | 11. THERE IS AN ACTIVE ENGINEERING SUBMITTAL E21050024 |
| | THAT APPEARS TO HAVE THE SAME PLAN SET. PLEASE CLARIFY. |
| | 12. PLEASE PROVIDE DETAILS ON UTILITIES ? |
| | EXISTING/PROPOSED? |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES |
| | DEPARTMENT |
| | DIRECT: (561) 494-1098 [email protected] |
| | |
| | |
| | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD |
| | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, |
| | PLEASE CONTACT 561-494-2262 OR [email protected]: |
| | |
| | -IS ANY SPECIAL APPROVAL NEEDED TO BUILD CONCRETE |
| | TRAILER PAD IN 6 FOOT TELEPHONE EASEMENT? |
| | |
| | -THE PAD IS OVER SEWER UTILITY WHICH MAY MAKE |
| | MAINTENANCE DIFFICULT FOR PROPERTY OWNER. |
| | |
| | -ELECTRIC UTILITY NEAR CONCRETE PAD DOES NOT SPECIFY IF |
| | IT IS UNDERGROUND OR OVERHEAD. IF UNDERGROUND, |
| | MAINTENANCE MAY BE DIFFICULT. |
| | |
| | -WILL THE WATER FEEDING THE RPZ COME FROM ST. MARY?S |
| | PLUMBING? |
| | |
| | -WILL WASTEWATER FROM TRAILER TIE INTO THE SEWER LINE |
| | UNDERNEATH CONCRETE PAD? |
| | |
| | -WILL TRAILER STRUCTURE BE ON TOP OF SS CLEANOUT? |
| | |
| | -WHAT WILL PERMANENT CONCRETE PAD BE USED FOR AFTER 6 |
| | MONTHS WHEN TEMPORARY TRAILER IS REMOVED? |
| | |
| | -WHERE ARE THE FOUR RELOCATED TREES BEING RELOCATED TO? |
| | |
| | -THERE IS LARGE DIAMETER WATER PIPE IN THE AREA, SUCH |
| | AS FOR THE NEARBY FIRE HYDRANT, BUT ENGINEERING PLAN |
| | DOES NOT SHOW ANY. RECOMMEND VERIFYING WATER PIPING NOT |
| | UNDER PROPOSED CONCRETE PAD. |
| | |
| | -WILL THE EXISTING DROP CURB NEAR THE NORTHWEST CORNER |
| | OF PROPOSED PAD REMAIN? |
| | |
| | |
| |