| Date |
Text |
| 2021-10-26 07:51:39 | COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG. |
| | SERVICES DEPT., 561-494-1098 [email protected] : |
| | 1. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY |
| | SEWER ARE REQUIRED. |
| | 2. FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW |
| | PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER, |
| | STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING |
| | STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY |
| | SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND |
| | OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH |
| | BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES |
| | SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS, |
| | CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND |
| | MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL |
| | AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW. |
| | DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN |
| | VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY, |
| | PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED |
| | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, |
| | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION |
| | FACILITIES LOCATED ON THE RIGHT-OF-WAY. |
| | 3. FOR FORMAL ENGINEERING SUBMITTAL , CUT AND CAP |
| | UTILITIES NOT IN USE, AND REMOVE ANY ABANDONED UTILITY |
| | LINES LARGER THAN 2 INCHES FROM CITY RIGHT OF WAY. |
| | 4. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND |
| | NPDES NOI REQUIREMENTS WILL BE ENFORCED. |
| | - AN NOI IS REQUIRED FOR PROJECTS THAT: |
| | - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS |
| | THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF |
| | DEVELOPMENT OR SALE; AND |
| | - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE |
| | STATE OR TO SURFACE WATERS OF THE STATE THROUGH A |
| | MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). |
| | - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF |
| | CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION |
| | THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL |
| | SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT |
| | OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO |
| | NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE |
| | CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE |
| | ENGINEERING PERMIT. |
| | 5. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES |
| | OF PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT |
| | OF WAY AND SHOW ANY CROSSINGS/CONFLICTS. |
| | 6. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING |
| | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT |
| | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING |
| | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED |
| | LEAD-FREE DESIGN. |
| | 7. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD |
| | RIGHT OF WAY. |
| | 8. FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN |
| | IN CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50 |
| | FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF |
| | PROPOSED TRENCH PER CURRENT CITY OF WPB STANDARD DETAIL |
| | GC-8. |
| | 9. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND |
| | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER |
| | (Z-XXXXXXXX). |
| | |
| | COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE |
| | SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR |
| | [email protected]: |
| | -IF MAINTENANCE IS NEEDED ON LIFT STATION OR FORCE |
| | MAIN, WHAT IS THE CONTACT INFORMATION FOR FPL (NAME, |
| | PHONE, EMAIL)? |
| | -WATER DEMAND DOCUMENT SAYS 92K GALLONS PEAK DAILY |
| | IRRIGATION, BUT 30K GALLONS PER WEEK. PLEASE VERIFY |
| | CALCULATIONS ARE CORRECT AT FORMAL ENGINEERING |
| | SUBMITTAL. |
| | -LIFT STATION REPORT SAYS IT WAS BASED ON 1840 FT OF 2 |
| | INCH FM, BUT SOME SIZING WAS INCREASED TO 4 INCH. |
| | PLEASE VERIFY LIFT STATION WILL STILL FUNCTION |
| | PROPERLY. |
| | -PLANS CALLOUT POSSIBLE RECLAIM VALVE IN ROAD. THERE IS |
| | A LARGE RECLAIM WATER MAIN IN AREA. AT FORMAL |
| | ENGINEERING SUBMITTAL, PLEASE LOOK AT THE RECLAIM |
| | ASBUILTS AND SHOW ANY RECLAIM PIPING IN AREA. |
| | -4 INCH FORCE MAIN CANNOT BE SCH80 PVC. PLEASE UPDATE |
| | MATERIAL TYPE AT FORMAL ENGINEERING SUBMITTAL. |
| | |
| | COMMENTS FROM MICHAEL TECHNOW, PROJECT ENGINEER, WPB |
| | PUBLIC UTILITIES, 561-494-1047, [email protected] : |
| | -CALL OUT POINT OF SERVICE ON PLANS AS WELL AS DETAIL A |
| | . |
| | -SHOW FM AS ?PRIVATE? UNTIL CONNECTION WITH EXISTING |
| | CITY SYSTEM. |
| | -PROVIDE REFERENCE TO THE NEAREST MAJOR STREET/LANDMARK |
| | IN DETAIL A. |
| | -SHOW PROPOSED FM IN DETAIL A. |
| | -ADD NOTE TO ENSURE THAT ANY ROADWAY OR CONSTRUCTION |
| | RUNOFF IS INCLUDED IN THE MITIGATION PLAN. |
| | -WHO OWNS THE EXISTING 32? RCP WM? (MATCH LINE C TO D) |
| | -WHO OWNS THE EXISTING STORM PIPE? (MATCH LINE C TO D) |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| |