Plan Review Notes
Plan Review Notes For Project Z21050030
Project Number Z21050030
Review Stop STORM
Sequence Number 1
Notes
Date Text
2021-07-08 10:39:30THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. ON THE OVERALL SITE PLAN (SHEET 1 OF 2), SHOULD THE
 LABEL ?EGRET LAKE ELEMENTARY? ABOVE STA22+00 BE MOVED
 TO ABOVE STA41+00?
  
 2. THE CITY?S OFFICIAL VERTICAL DATUM PER CITY CODE IS
 NGVD1929. THE CITY IS ALLOWING SURVEYS AND PLANS TO USE
 NAVD1988 PROVIDED THE CONVERSION EQUATION BETWEEN
 NAVD1988 AND NGVD1929 IS ALSO PROVIDED. LABEL THE
 VERTICAL DATUM AND CONVERSION EQUATION TO NGVD1929 ON
 ALL CIVIL ENGINEERING SHEETS WITH ELEVATION
 INFORMATION.
  
 3. FOR SECTION A-A ON SHEET 3 OF 7, CONSIDER CHANGING
 THE NOTE ?ALL SLOPES GREATER THAN 5:1 TO BE SODDED? TO
 ?ALL SLOPES FLATTER THAN 5:1 TO BE SODDED? (OR STEEPER
 DEPENDING ON THE INTENT OF THE NOTE).
  
 4. THE BOTTOM ELEVATION OF THE ROADSIDE SWALES VARY
 BETWEEN 13.5 AND 15.8 ALONG THE ROAD. WAS THIS
 VARIATION CONSIDERED IN THE SWALE STORAGE VOLUME FOR
 WATER QUALITY TREATMENT? WILL THERE BE DITCH BLOCKS
 CONSTRUCTED TO MAXIMIZE THE STORAGE IN THE SWALE? THE
 DRAINAGE CALCULATIONS WILL BE REVIEWED AT ENGINEERING
 PERMIT SUBMITTAL.
  
 5. HOW AND WHERE WILL THE ROADSIDE SWALES DISCHARGE?
 THERE APPEARS TO BE A BERM ALONG THE NORTH SIDE OF THE
 EXISTING DITCH EAST OF STA11+00. WILL THE TOP OF THE
 BERM BE AFFECTED WITH THE ROAD CONSTRUCTION?
  
 6. PROVIDE CONDITION ASSESSMENT OF THE STORM PIPE(S)
 CROSSED BY THE PROPOSED ROAD (APPROX. STA39+00).
  
 7. CHECK THE ELEVATIONS LISTED FOR THE FRENCH DRAIN
 DETAIL ON SHEET 3 OF 7 AND THE DRAINAGE CONTROL
 STRUCTURE DSC-1 DETAIL ON SHEET 4 OF 7.
  
 8. LIMEROCK MAY NOT BE SUITABLE FOR THE ROAD BASE IF IT
 WILL BE SUSCEPTIBLE TO SATURATION FROM THE HIGH GROUND
 WATER TABLE AND/OR SWALE STORAGE.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE COPY OF SFWMD ERP PERMIT(S) BEFORE START OF
 CONSTRUCTION.
  
 4. THE PROJECT IS WITHIN THE NORTHERN PALM BEACH COUNTY
 IMPROVEMENT DISTRICT. PROVIDE A COPY OF THE NPBCID
 PERMIT BEFORE THE START OF CONSTRUCTION.
  
 5. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  