Plan Review Notes
Plan Review Notes For Project Z21050015
Project Number Z21050015
Review Stop STORM
Sequence Number 3
Notes
Date Text
2021-08-19 13:37:20THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 AUGUST 5, 2021 PLAN SUBMITTAL.
  
 1. [CONDITION OF SITE PLAN APPROVAL] COORDINATE THE
 GRADING OF CURRIE CRESCENT WITH THE FLAGLER FORTE
 DEVELOPMENT.
  
 2. [CONDITION OF SITE PLAN APPROVAL] CURRIE CRESCENT
 CURB AND GUTTER TO HAVE POSITIVE DRAINAGE TO THE STREET
 DRAINAGE SYSTEM.
  
 3. [CONDITION OF SITE PLAN APPROVAL] MAINTAIN CROWN
 CROSS SECTION OF CURRIE CRESCENT.
  
 4. [PARTIALLY SATISFIED] REQUESTED DIMENSIONS WERE ONLY
 PROVIDE FOR SECTIONS B-B, C-C, D-D, H-H, AND J-J.
 PREVIOUS COMMENT: FOR THE CROSS SECTIONS ON SHEET
 C-501, PROVIDE DIMENSIONS FROM PROPERTY LINE/RIGHT OF
 WAY LINE TO VALLEY GUTTER OR BACK OF SIDEWALK.
  
 5. [SATISFIED] SUGGEST SLOPING THE SIDEWALK PORTION OF
 THE DRIVEWAY SHOWN IN SECTION B-B TOWARD THE VALLEY
 GUTTER.
  
 6. [NOT SATISFIED] SECTION D-D SHOWS 10% SLOPE EAST OF
 THE PROPERTY LINE. SHEET A-101 SHOWS 7.5% RAMP UP.
 PREVIOUS COMMENT: COORDINATE THE SLOPES SHOWN FOR THE
 DRIVEWAYS WITH THE ARCHITECTURAL PLANS. FOR EXAMPLE,
 SECTION C-C SHOWS 3.4% SLOPE BETWEEN THE BUILDING AND
 VALLEY GUTTER. SHEET A-101 SHOWS THE DRIVEWAY AT 7.5%
 SLOPE.
  
 7. {SATISFIED] SECTION D-D: PROVIDE SIDEWALK AREA WITH
 SLOPE NO STEEPER THAN 2%.
  
 8. [SATISFIED] SECTION E-E: CORRECT LABELS FOR ROAD
 CENTERLINE AND PROPERTY LINE.
  
 9. [PARTIALLY SATISFIED ? GRADING OF THE AREA BETWEEN
 THE SOUTH PROPERTY LINE AND THE CENTER LINE OF DIANA
 PLACE CAN BE A CONDITION OF SITE PLAN APPROVAL TO BE
 WORKED OUT DURING ENGINEERING PERMIT SUBMITTAL.] THE
 GRADING BETWEEN THE ROAD CENTERLINE AND R/W, AS SHOWN
 ON SECTIONS H-H THROUGH K-K NEEDS FURTHER REFINEMENT.
 THE ROAD AND PARKING CROSS SLOPES NEED TO MEET THE
 CITY?S DESIGN CRITERIA AND BE ACCEPTABLE TO THE CITY
 TRANSPORTATION ENGINEER. THE LANDSCAPE SLOPES STEEPER
 THAN 4:1 ARE DIFFICULT TO MAINTAIN. FOR SECTION J-J,
 THE LANDSCAPE AREA SHOULD MEET THE TOP OF CURB. FOR
 SECTION K-K, THE ARROW FOR THE 0.1% LANDSCAPE SLOPE IS
 POINTING IN THE WRONG DIRECTION. PREVIOUS COMMENT:
 SECTION G-G, CONSIDER LOWERING THE COURTYARD AREA
 WITHIN THE PROPERTY IN ORDER TO FLATTEN THE SLOPE
 BETWEEN THE 10 FT WIDE SIDEWALK AND THE BACK OF CURB OF
 DIANA PLACE.
  
 10. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END
 OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE
 SIDEWALK.
  
 11. [SATISFIED] PROVIDE A CROSS SECTION FROM THE NORTH
 PROPERTY LINE TO THE FACE OF THE BUILDING INCLUDING
 DIMENSIONS TO THE OUTSIDE OF THE UNDERGROUND PARKING
 GARAGE.
  
 12. [SATISFIED - TO BE WORKED OUT AT ENGINEERING PERMIT
 SUBMITTAL] FOR THE EXFILTRATION TRENCH ALONG THE NORTH
 PROPERTY LINE, THE SFWMD TRENCH EQUATION WILL HAVE TO
 BE MODIFIED TO ACCOUNT FOR THE RETAINING WALL ON ONE
 SIDE AND POSSIBLE GARAGE WALL ON THE OTHER THAT WILL
 LIMIT THE FLOW OUT OF THE TRENCH.
  
 13. [SATISFIED] EXPLAIN HOW THE EXFILTRATION TRENCH
 ALONG THE NORTH PROPERTY LINE WILL BE MAINTAINED,
 INCLUDING POSSIBLE REPLACEMENT, WHEN IT HAS LOST ITS
 DISPOSAL CAPACITY IN A FEW YEARS.
  
 14. [NOT SATISFIED. INFORMATION CAN BE PROVIDED WITH
 ENGINEERING PERMIT SUBMITTAL] PROVIDE AN EXFILTRATION
 TRENCH DETAIL, LABELING THE TRENCH WIDTH AND THE
 ELEVATIONS FOR THE TOP OF TRENCH, THE BOTTOM OF THE
 TRENCH, AND THE PIPE INVERT.
  
 15. [NOT SATISFIED. INFORMATION CAN BE PROVIDED WITH
 ENGINEERING PERMIT SUBMITTAL] PROVIDE DETAIL OF CONTROL
 STRUCTURE(S). NOTE BLEEDERS CANNOT BE USED AS PART OF
 THE CONTROL TO SURCHARGE THE EXFILTRATION TRENCH.
  
 16. [PARTIALLY SATISFIED] SHOW MILL AND RESURFACING
 LIMITS ON CURRIE CRESCENT (BECAUSE OF THE TRENCH CUTS
 AND THE CHANGE IN PAVEMENT MARKINGS FOR THE PARKING
 SPACES). PREVIOUS COMMENT: SHOW MILL AND RESURFACING
 LIMITS FOR TRENCH CUTS IN THE ROADWAY PER CITY'S
 STANDARD DETAIL GC-8.
  
 17. [SATISFIED] CONVERT EXISTING DRAINAGE STRUCTURE IN
 THE EXISTING SOUTH DRIVEWAY TO S. FLAGLER DRIVE TO A
 CATCH BASIN WITH A HOODED FRAME AND GRATE. THE
 STRUCTURE MAY NEED TO BE ENLARGED IN ORDER TO CONNECT
 THE PROPOSED 15-INCH RCP FROM THE DEVELOPMENT.
  
 18. [SATISFIED ? TO BE WORKED OUT AT ENGINEERING PERMIT
 SUBMITTAL] DRAINAGE SYSTEM DESIGN TO CONSIDER SEA LEVEL
 RISE.
  
 19. [SATISFIED ? PIPE WAS REMOVED] WHAT IS THE PURPOSE
 OF THE 6-INCH HDPE PIPE BETWEEN THE SIDEWALK AND EAST
 PROPERTY LINE?
  
 20. [SATISFIED ? TO BE ADDRESSED DURING FINAL
 ENGINEERING DESIGN] THE ROOF DRAIN SYSTEM WILL NEED TO
 BE DESIGNED SO THAT MANHOLE LIDS ARE NOT DISPLACED BY
 THE PRESSURE OF THE WATER OR TRAPPED AIR IN THE ROOF
 DOWNSPOUTS.
  
 21. [SATISFIED] IT APPEARS THE TOWNHOME AT THE WEST END
 OF THE PROJECT WILL HOLD WATER BEHIND THE DIANA PLACE
 SIDEWALK.
  
 22. [CONDITION OF SITE PLAN APPROVAL] WHAT DRAINAGE
 MITIGATION (WATER QUALITY AND PEAK FLOW ATTENUATION) IS
 PROPOSED FOR THE ADDITIONAL IMPERVIOUS AREA IN THE
 DIANA PLACE PARCEL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  