Plan Review Notes
Plan Review Notes For Project Z21050011
Project Number Z21050011
Review Stop ENG - PPRC
Sequence Number 3
Notes
Date Text
2021-09-15 14:40:18COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG.
 SERVICES DEPT., 561-494-1098 [email protected] :
  
 PLEASE ADDRESS COMMENTS FROM FIRST SUBMITTAL ?
 Z21050011 ? AUTOZONE 1236 PB LAKES ? INITIAL REVIEW
 1. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER
 ENGINEERING RELATED DOCUMENTS, GO HERE:
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90
 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY:
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, GO TO:
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING
 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1040 FOR FURTHER
 ASSISTANCE.
 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29).
 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER ALONG ENTIRE PROJECT FRONTAGE.
 11. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 12. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 13. PLEASE LABEL WATER LINES AS PRIVATE WHERE
 APPLICABLE.
 14. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION.
 15. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 16. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS
 FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT, (561) 494-1098 [email protected]
  
  
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
 THE PLANS DID NOT SEEM TO CHANGE MUCH OR ADDRESS
 COMMENTS PROVIDED EITHER THROUGH THE COMPUTER SYSTEM OR
 VERBALLY DURING PPRC MEETING.
 -SEWER LATERAL CROSSES ADJACENT PROPERTY. WILL THERE BE
 A LEGAL AGREEMENT TO ALLOW THAT AND CLARIFY OTHER
 FACTORS SUCH AS MAINTENANCE RESPONSIBILITY?
  
 -PLEASE VERIFY IF THERE IS AN EXISTING FENCE OVER THE
 WATER MAIN ON EAST SIDE OF PROPERTY.
  
 -HOW FAR IS THE EAST SIDE OF THE BUILDING TO THE WATER
 MAIN? PLEASE SHOW THAT ON UTILITY PLAN.
  
 -WILL A SEPARATE METERED IRRIGATION WATER SERVICE BE
 NEEDED?
  
 -WILL THE BUILDING HAVE FIRE SPRINKLERS?
  
 -SHOW AND LABEL ALL EXISTING FIRE HYDRANTS ON UTILITY
 PLAN. (THERE IS AT LEAST ONE TO THE SOUTHWEST AND ONE
 TO THE NORTHEAST)
  
 -ON THE UTILITY PLAN, PLEASE LABEL THE UNMARKED SQUARE
 OBJECT BETWEEN THE BATHROOMS AND DUMPSTER.
  
 -ON THE UTILITY PLAN, PLEASE LABEL THE OBJECT NEAR THE
 SOUTHEAST CORNER OF THE BUILDING IN THE UTILITY
 EASEMENT.
  
 -THERE APPEAR TO BE SOME TREE CONFLICTS WITH WATER
 UTILITIES. PLEASE ENSURE ROOTS WILL NOT GROW INTO WATER
 PIPING. INCREASE CLEARANCE DISTANCE AND ADD ROOT
 BARRIERS AS NEEDED.
  
 -IT APPEARS THERE IS A PROPOSED TREE IN DRAINAGE
 EASEMENT. IS THAT ALLOWED?
  
 -A COUPLE OF MANHOLES APPEAR TO CONFLICT WITH A PARKING
 BLOCK AND WITH AN ADA RAMP.
  
 -WILL THE MARQUEE AND MONUMENT SIGNS BE VISIBLE WITH
 THE ADJACENT TREES?
  
 -THERE ARE A LOT OF WATER SERVICES AND WATER METER
 BOXES ALONG THE EAST SIDE OF PROPERTY JUST WEST OF THE
 EXISTING FENCE. PLEASE SHOW AND LABEL ALL OF THEM ON
 THE UTILITY PLAN.
  
 -THERE IS A METER BOX AND BACKFLOW ASSEMBLY EAST OF THE
 SOUTHWEST FIRE HYDRANT. SHOW AND LABEL THAT ON UTILITY
 PLAN. IT SHOULD BE THE WATER SERVICE FOR THE ICE
 MACHINE BUSINESS 1256 PALM BEACH LAKES. ALSO SHOW THE
 PLUMBING PIPE IF IT CROSSES INTO THE PROPERTY; AND
 VERIFY R1-1 SIGN WILL NOT HIT IT.
  
 -ON THE UTILITY PLAN, THERE ARE A COUPLE OF UNLABELED
 LINES RUNNING FROM THE SOUTHEAST CORNER OF THE BUILDING
 TO THE PROPERTY LINE. PLEASE LABEL THOSE.
  
 -SURVEY SHOWS MULTIPLE 6 INCH WATER MAINS RUNNING
 EAST-WEST THROUGH PROPERTY. IT ALSO SHOWS SOME
 DIFFERENT LOCATIONS FOR THE NORTH-SOUTH WATER MAINS.
 PLEASE VERIFY LOCATIONS AND UPDATE UTILITY PLAN AS
 NEEDED.
  
 -PLEASE VERIFY THERE IS A 6 INCH WATER MAIN RUNNING
 NEAR THE NORTH PROPERTY LINE.
  
 -SURVEY SHOWS INGRESS/EGRESS EASEMENT NEAR NORTH
 DRIVEWAY. IS AN INGRESS/EGRESS EASEMENT NEEDED FOR
 SOUTHERN DRIVEWAY?
  
 -THERE IS AN EXISTING WATER METER AND BACKFLOW ASSEMBLY
 NEAR EAST SIDE OF PROPOSED BUILDING THAT LIKELY FEEDS
 1258 PALM BEACH LAKES RESTAURANT. PLEASE SHOW AND LABEL
 THE WATER METER, BACKFLOW ASSEMBLY, AND PLUMBING PIPE
 RUNNING TO RESTAURANT.
  
 -SHOW WATER METERS AND BACKFLOW ASSEMBLIES ON THE
 LANDSCAPING PLAN.
  
 -VERIFY PROPOSED METER BOX WOULD BE IN LANDSCAPING AREA
 AND NOT HARDSCAPE.
  
 -EXISTING DRAINAGE INFRASTRUCTURE IN EASEMENT THAT
 CROSSES MULTIPLE PROPERTIES APPEARS TO BE
 PRIVATELY-OWNED. HOW WILL OWNERSHIP AND MAINTENANCE BE
 HANDLED?
  
 -WHAT WILL YARD HYDRANT BE USED FOR?
  
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved