Plan Review Notes
Plan Review Notes For Project Z21050010
Project Number Z21050010
Review Stop ENG - PPRC
Sequence Number 2
Notes
Date Text
2021-10-12 10:49:53COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR, ENG.
 SERVICES DEPT., 561-494-1098 [email protected] :
  
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE
 CALCULATIONS ON PLANS OF EXISTING AND PROPOSED DEMANDS
 FOR WATER & SEWER (AVERAGE, MAXIMUM AND PEAK) AND FIRE
 FLOW DEMANDS. CALCULATIONS SHALL BE PER FAC 64E-8 FOR
 WATER AND PER FAC 64-E.008 FOR SEWER.
 4. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER PIPES ALONG ENTIRE PROJECT FRONTAGE.
 (RESPONSE LETTER INDICATES IT HAS BEEN PROVIDED, UNABLE
 TO LOCATE.)
 5. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 6. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 7. FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW
 PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER,
 STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND
 OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL
 AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW.
 DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN
 VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY,
 PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED
 UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC,
 ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION
 FACILITIES LOCATED ON THE RIGHT-OF-WAY.
 8. FOR FORMAL ENGINEERING SUBMITTAL, CUT AND CAP
 UTILITIES NOT IN USE, AND REMOVE ANY ABANDONED UTILITY
 LINES LARGER THAN 2 INCHES FROM CITY RIGHT OF WAY.
 9. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE DEDICATED
 UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO
 PROPOSED UTILITY WATER METERS. ADJUST PROPOSED EASEMENT
 TO EXCLUDE BACKFLOW (BF MUST BE ON PRIVATE PROPERTY
 OUTSIDE OF EASEMENT).
 10. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER
 METER AND BACKFLOW PREVENTION.
 11. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT
 DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW
 PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL
 BACKFLOWS.
 12. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE; AND
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION. IF THE ENGINEERING PLANS DO
 NOT INCLUDE AN EROSION CONTROL PLAN, THEN THE
 CONTRACTOR SHOULD SUBMIT ONE PRIOR TO RECEIVING THE
 ENGINEERING PERMIT.
 13. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES
 OF PROPOSED AND EXISTING WATER AND SEWER WITHIN RIGHT
 OF WAY AND SHOW ANY CROSSINGS/CONFLICTS.
 14. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 15. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD
 RIGHT OF WAY.
 16. FOR FORMAL ENGINEERING SUBMITTAL PROVIDE SANITARY
 ELEVATIONS AT MANHOLE TIE-IN.
 17. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 18. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES
 ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL
 ADDRESSES.
 19. FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN
 IN CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50
 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH PER CURRENT CITY OF WPB STANDARD DETAIL
 GC-8.
 20. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (Z-XXXXXXXX).
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-494-2262 OR
 [email protected]:
  
 PLEASE SHOW ALL EXISTING WATER SERVICES, METERS, AND
 BACKFLOW ASSEMBLIES ON THE WATER PLAN AND LABEL WHAT IS
 HAPPENING TO THEM.
 RESPONSE: EXISTING SERVICES ARE SHOWN ON SHEET C4. NOTE
 ON PLANS REQUIRES ANY UNUSED SERVICES TO BE ABANDONED
 AND CAPPED AT THE MAIN.
 FOLLOWUP: FOR FORMAL ENGINEERING SUBMITTAL,
 SPECIFICALLY CALLOUT AND LABEL EXISTING WATER SERVICE
 THAT WILL BE ABANONDED AND CAPPED ON WATER PLAN. ALSO
 SHOW AND LABEL EXISTING WATER SERVICES AND SEWER
 LATERALS FOR THE PROPERTIES ON WEST SIDE OF FLAGLER
 DRIVE.
  
 THERE APPEARS TO BE A TREE CONFLICT WITH UTILITY POLE
 NEAR SOUTHWEST CORNER OF PROPERTY.
 RESPONSE: THE OVERHEAD LINES ARE PROPOSED TO BE PLACED
 UNDERGROUND ON THE SUBJECT SITE.
 FOLLOWUP: SHOW AND LABEL ANY PROPOSED PAD TRANSFORMERS
 ON PLANS.
  
  
 NEW COMMENTS:
  
 -IS A DO NOT ENTER SIGN NEEDED FOR THE NORTH DRIVEWAY?
  
 -SOME TREES ARE IN SIGHT TRIANGLES. IS THAT ALRIGHT?
  
 -THERE IS RECTANGULAR OBJECT ABOUT 18 FEET SOUTH OF
 CLEANOUTS ON CIVIL PLANS, BUT NOT ON OTHER PLANS.
 PLEASE LABEL WHAT IT IS AND UPDATE OTHER PLANS IF
 NEEDED.
  
 -WILL DOCK NEED FIRE PROTECTION?
  
 -DOES WATER DEMAND CALCULATION INCLUDE IRRIGATION AND
 DOCK USE? DOES SEWER DEMAND INCLUDE THE DOCK USE?
  
 -WATER PIPE TO DOCK NEEDS TO COMPLY WITH ANY PLUMBING
 BACKFLOW PROTECTION REQUIREMENTS.
  
 -FOR FORMAL ENGINEERING SUBMITTAL: ADD INVERT ELEVATION
 INFO FOR NORTH SEWER MANHOLE IN FLAGLER DR., ADD FIRE
 FLOW CALCULATIONS TO WATER PLAN, CALLOUT CROSSING
 ELEVATION INFO FOR ANY UTILITIES IN CLOSE PROXIMITY TO
 PROPOSED SEWER LATERAL.
  
 -WILL THERE BE ANY EXFILTRATION TRENCHES ON SITE? IF
 SO, LABEL ON CIVIL PLAN OR SHOW ON LEGEND.
  
 -WILL FDC HEIGHT BLOCK VISIBILITY OF STOP SIGN?
  
 -ON WATER PLAN, SHOW EXISTING GATE VALVE IN SIDEWALK
 FOR EXISTING 4 INCH DIP WM.
  
 -LABEL DCDA ON WATER PLAN.
  
 -IN CASE ROOM WITH DCDA FLOODS, WILL THERE BE A DRAIN
 PIPE?
  
 -ADD ABOVE GROUND TO LABEL OF 6 INCH METER.
  
 -SHOW AND LABEL GATE VALVE FOR FIRELINE NEAR WATER
 MAIN. ADD POINT OF SERVICE WORDING TO LABEL.
  
 -FOR FORMAL ENGINEERING SUBMITTAL: CALLOUT CONNECTIONS
 TO WATER MAINS AS TAPS OR CUT-IN TEES, LABEL ANY SAMPLE
 POINTS ON WATER PLAN.
  
  
  
 NOTE THAT THERE MAY BE PENDING COMMENTS FROM MICHAEL
 TECHNOW, PROJECT ENGINEER, WPB PUBLIC UTILITIES,
 561-494-1047, [email protected]
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  