| 2021-06-10 09:55:12 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. PROJECT SITE IS WITHIN A SPECIAL FLOOD HAZARD AREA. |
| | DRAFT COASTAL FLOOD ZONE MAPS HAVE BEEN ISSUED BY FEMA |
| | THAT MAY SHOW A HIGHER BASE FLOOD ELEVATION THAN WHAT |
| | IS SHOWN ON THE CURRENT FLOOD INSURANCE RATE MAPS. TWO |
| | FEET OF FREEBOARD ABOVE THE BFE WILL BE REQUIRED FOR |
| | THE FINISHED FLOOR ELEVATION AND ANY |
| | MECHANICAL/ELECTRICAL EQUIPMENT. |
| | |
| | 2. PROPOSED EXFILTRATION TRENCH IS WITHIN FPL EASEMENT. |
| | APPROVAL FROM FPL MAY BE NEEDED. |
| | |
| | 3. PROVIDE CROSS SECTIONS FOR EACH DRIVEWAY AND MIDWAY |
| | BETWEEN DRIVEWAYS FROM CENTERLINE OF ROAD TO 10 FEET |
| | WITHIN THE PROPERTY. |
| | |
| | 4. PROVIDE TYPICAL CROSS SECTIONS AT NORTH AND SOUTH |
| | PROPERTY LINES FROM PROPERTY LINE TO FACE OF BUILDING. |
| | |
| | 5. PROPERTY CANNOT DRAIN ONTO ADJACENT PARCELS. |
| | |
| | 6. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA AND CONSIDER SEA LEVEL RISE. THE DESIGN OF THE |
| | EXFILTRATION TRENCH SHOULD CONSIDER THE IMPACTS THE |
| | PERIMETER WALL AND THE BUILDING WILL HAVE ON THE FLOW |
| | RATE OF THE EXFILTRATION TRENCH. |
| | |
| | 7. PROVIDE FLOW ARROWS ON THE PGD PLAN SHOWING |
| | DIRECTION OF SURFACE RUNOFF. |
| | |
| | 8. CONSIDER SEA LEVEL RISE IN THE DESIGN OF THE |
| | PROPOSED BULKHEAD. |
| | |
| | 9. CITY CODE PROHIBITS NEW DRAINAGE OUTFALLS INTO THE |
| | LAKE WORTH LAGOON. |
| | |
| | 10. SHOW UTILITIES ON THE LANDSCAPE PLANS. |
| | |
| | 11. DECKING SHOWN ON THE CIVIL PLANS DOES NOT MATCH |
| | WHAT IS SHOWN ON THE SITE PLAN. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE COPY OF SFWMD ERP PERMIT(S) BEFORE START OF |
| | CONSTRUCTION. |
| | |
| | 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE |
| | ENGINEERING PERMIT APPLICATION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| |
Print |