2021-06-10 09:55:12THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. PROJECT SITE IS WITHIN A SPECIAL FLOOD HAZARD AREA.
 DRAFT COASTAL FLOOD ZONE MAPS HAVE BEEN ISSUED BY FEMA
 THAT MAY SHOW A HIGHER BASE FLOOD ELEVATION THAN WHAT
 IS SHOWN ON THE CURRENT FLOOD INSURANCE RATE MAPS. TWO
 FEET OF FREEBOARD ABOVE THE BFE WILL BE REQUIRED FOR
 THE FINISHED FLOOR ELEVATION AND ANY
 MECHANICAL/ELECTRICAL EQUIPMENT.
  
 2. PROPOSED EXFILTRATION TRENCH IS WITHIN FPL EASEMENT.
 APPROVAL FROM FPL MAY BE NEEDED.
  
 3. PROVIDE CROSS SECTIONS FOR EACH DRIVEWAY AND MIDWAY
 BETWEEN DRIVEWAYS FROM CENTERLINE OF ROAD TO 10 FEET
 WITHIN THE PROPERTY.
  
 4. PROVIDE TYPICAL CROSS SECTIONS AT NORTH AND SOUTH
 PROPERTY LINES FROM PROPERTY LINE TO FACE OF BUILDING.
  
 5. PROPERTY CANNOT DRAIN ONTO ADJACENT PARCELS.
  
 6. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA AND CONSIDER SEA LEVEL RISE. THE DESIGN OF THE
 EXFILTRATION TRENCH SHOULD CONSIDER THE IMPACTS THE
 PERIMETER WALL AND THE BUILDING WILL HAVE ON THE FLOW
 RATE OF THE EXFILTRATION TRENCH.
  
 7. PROVIDE FLOW ARROWS ON THE PGD PLAN SHOWING
 DIRECTION OF SURFACE RUNOFF.
  
 8. CONSIDER SEA LEVEL RISE IN THE DESIGN OF THE
 PROPOSED BULKHEAD.
  
 9. CITY CODE PROHIBITS NEW DRAINAGE OUTFALLS INTO THE
 LAKE WORTH LAGOON.
  
 10. SHOW UTILITIES ON THE LANDSCAPE PLANS.
  
 11. DECKING SHOWN ON THE CIVIL PLANS DOES NOT MATCH
 WHAT IS SHOWN ON THE SITE PLAN.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE COPY OF SFWMD ERP PERMIT(S) BEFORE START OF
 CONSTRUCTION.
  
 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved