Plan Review Notes
Plan Review Notes For Project Z21040018
Project Number Z21040018
Review Stop STORM
Sequence Number 1
Notes
Date Text
2021-05-08 23:25:48THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. SHOW ON THE DEMOLITION PLAN, SHEET C-03, THE
 EXISTING DRAINAGE PIPE CONNECTIONS FOR THE TWO CATCH
 BASINS IN THE NORTHEAST AREA OF THE SITE.
  
 2. THE PGD PLAN (SHEET C-04) CALLS OUT 8' X 10'
 EXFILTRATION TRENCH BUT THE EXFILTRATION TRENCH DETAIL
 ON SHEET C-06 SHOWS 10' X 6.5' TRENCH DIMENSIONS.
  
 3. THE EXFILTRATION TRENCH DETAIL SHOWS A WEIR
 ELEVATION OF 15.70 FT NAVD.
 A. WHERE IS THIS WEIR LOCATED?
 B. LOWEST FINISHED GRADE IS 16.10. SUGGEST USING
 CRUSHED CONCRETE BASE INSTTEAD OF LIMEROCK BASE TO
 CONTEND WITH POTENTIAL SATURATED BASE CONDITIONS.
 C. THE PROPOSED FINISHED GRADE OF THE LAWN OVER THE
 RAINTANKS IS SHOWN TO BE 16.50' NAVD. SHOULD THE
 FINISHED GRADE BE A MINIMUM OF 1 FOOT ABOVE THE WEIR
 ELEVATION?
  
 4. LABEL THE VERTICAL DATUM ON EVERY SHEET WITH
 ELEVATION INFORMATION AND PROVIDE THE CONVERSION
 EQUATION TO NGVD1929. THIS COMMENT APPLIES TO SHEET
 C-03, C-05, C-06, C-07, AND C-11.
  
 5. SHOW MINIMUM HORIZONTAL CLEARANCE BETWEEN S.S.M.H.
 #4 AND THE 8" WATER MAIN TO THE NORTH AND NORTHWEST OF
 THE STRUCTURE
  
 6. IF THE TRENCH CUT FOR THE PROPOSED 12" WATER MAIN IS
 WITHIN THE NORTHBOUND LANE OF CLEARWATER DRIVE, THE
 FULL WIDTH OF THE NORTHBOUND LAND WILL NEED TO BE
 MILLED AND RE-SURFACED.
  
 7. AVOID HAVING VALVE COVERS FALL WITHIN THE CURB AND
 GUTTER.
  
 8. USE THE LATEST CITY DETAILS.
  
 9. INDICATE IF THE PROPOSED DRAINAGE SYSTEM CHANGED
 WITH THE LATEST SITE PLAN.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION.
  
 4. DRAINAGE CALCULATIONS WILL BE REVIEWED WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)