2022-02-14 12:02:12THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 11-23-2021 SUBMITTAL:
  
 1. PGD PLAN CALLS FOR THE PLUGGING OF THE SW INVERT OF
 THE STORM MH AT THE INTERSECTION OF 10TH STREET AND
 RAILROAD AVE. THE DEMOLITION PLAN CALLS FOR THE STORM
 PIPE CONNECTED TO THE SW INVERT TO REMAIN. IF THE
 INVERT IS BEING PLUGGED, THE PIPE SHOULD BE REMOVED AS
 WELL AS THE CURB INLET CONNECTED AT THE OTHER END OF
 THE PIPE. THE EXISTING INLET WILL BE LOCATED IN THE
 PROPOSED 8 FT WIDE SIDEWALK. IF THE STORM PIPE REMAINS,
 SHOW IT ON THE SANITARY SEWER PROFILE.
  
 2. WHERE RAISED CURB OR CURB AND GUTTER IS PROPOSED,
 CONFIRM THE BACK OF SIDEWALK WILL BE HIGHER THAN THE
 TOP OF CURB FOR POSITIVE DRAINAGE OF THE SIDEWALK.
  
 3. PIPE CONFLICT INFORMATION SHOULD INCLUDE THE PIPE
 THICKNESS WHEN CALCULATION TOP OF PIPE OR BOTTOM OF
 PIPE ELEVATIONS. THE CLEARANCE DISTANCE SHOULD BE FROM
 OUTSIDE OF PIPE TO OUTSIDE OF PIPE.
  
 4. THE STORM PIPE BETWEEN S-101 AND S-102 IS AT AN
 ADVERSE SLOPE AND MAY BE IN CONFLICT WITH THE 6-INCH
 WATER MAIN TO THE FIRE HYDRANT. CALLOUT CONFLICT
 INFORMATION ON THE WATER AND SEWER PLANS.
  
 5. THE 12-INCH WATER MAIN IS CROSSING UNDER THE
 EXISTING 15-INCH RCP STORM PIPE FROM STRUCTURE S-101.
 MAKE SURE THERE IS ADEQUATE VERTICAL CLEARANCE PER
 PBCHD.
  
 6. STRUCTURE S-102 MAY BE IN CONFLICT WITH SANITARY
 SEWER LATERAL. IS THE LATERAL BEING REPLACED OR
 REMOVED?
  
 7. NO PROPOSED DRAINAGE SHOWN ON N. RAILROAD AVE
 BETWEEN 7TH ST AND 8TH ST. SECTIONS G AND H SHOW
 PROPOSED 18? RCP STORM. ADVISE HOW THE NEW GUTTERS WILL
 DRAIN INTO THE EXISTING INLETS AT 7TH ST.
  
 8. LABEL RIGHT OF WAY LIMITS ON THE PGD SECTIONS.
  
 9. SHOW MILL AND RESURFACING LIMITS ON ALL STREETS AND
 ALLEYS.
  
 10. SOME PROPOSED DRAINAGE STRUCTURES ARE SHOWN WITHIN
 CROSSWALKS.
  
 11. SHOULD CROSSWALK ON N. RAILROAD AVE AT AT 7TH
 STREET BE CLOSER TO THE INTERSECTION?
  
 12. ALL RIGHT OF WAY LINES FOR STREETS AND ALLEYS
 SHOULD BE SHOWN AND LABELED.
  
 13. LIGHT POLES APPEAR TO BE IN CONFLICT WITH
 UNDERGROUND UTILITIES.
  
 14. EXPLAIN HOW GUTTERS WILL FLOW AROUND UBER/LIFT
 DROPOFF/PICKUP AREAS.
  
 15. CONFIRM SLOPE DIRECTION FOR AREAS OUTSIDE OF RIGHT
 OF WAY FOR SECTIONS F1, F2, AND F3.
  
 16. DOES THE ON-SITE EXFILTRATION TRENCH DETAIL ON
 SHEET C5.1 APPLY TO THE EXFILTRATION TRENCHES ON N.
 RAILROAD AVE.? CONFIRM THE ELEVATIONS LISTED ON THE
 DETAIL. SHOW WHERE THE SILVA CELLS WILL BE CONSTRUCTED
 (HORIZONTAL AND VERTICAL OFFSETS) WHEN ADJACENT TO AN
 EXFILTRATION TRENCH (SEE HARDSCAPE PLANS FOR SILVA CELL
 DETAIL).
  
 17. NOTE 2 ON FDOT STANDARD PLAN 711-011 (SHEET 10 OF
 13) DISCUSSES MAKING THE CROSSWALK STRIPING PARALLEL TO
 THE LANE LINES WHEN THE SPECIAL EMPHASIS CROSSWALK IS
 NOT PERPENDICULAR TO THE LANE LINES. THIS COMMENT
 APPLIES TO THE CROSSWALKS CROSSING THE SIDE STREETS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved