2021-10-06 09:40:29THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 8/5/2021 NORA STREETSCAPE PROJECT SUBMITTAL:
  
 1. R/W CROSS SECTIONS A-A THROUGH F-F SHOW PAVERS
 INSTEAD OF VALLEY GUTTER AT EDGE OF TRAVEL LANES. THE
 HARDSCAPE PLAN DETAILS SHOW THE PAVERS OVER A CONCRETE
 VALLEY GUTTER. SHOW THE VALLEY GUTTER ON THE CROSS
 SECTIONS AND ADD A NOTE ON THE CIVIL PLANS TO REFER TO
 THE HARDSCAPE PLANS.
  
 2. THE HARDSCAPE PLAN SHEET L1-110 SHOWS RAIL AT THE
 FRONT OF SIDEWALKS AND DOWN THE CENTER OF N. RAILROAD
 AVE. THE CROSS SECTIONS ON THE CIVIL PLANS ONLY SHOW
 THE RAILS AT THE FRONT OF SIDEWALKS.
  
 3. LABEL THE R/W LINES ON THE CROSS SECTIONS A-A
 THROUGH F-F. SHOW EXISTING GROUND OUTSIDE THE R/W AND
 HOW SECTIONS WILL TRANSITION TO EXISTING GRADES.
  
 4. WHEN REFERRING TO FDOT STANDARD DETAILS, USE THE
 STANDARD PLAN NUMBER INSTEAD OF THE STANDARD INDEX
 NUMBER.
  
 5. INDICATE WHAT HAPPENS TO THE EXISTING DRAINAGE
 SYSTEM ON 10TH STREET AND THE EXISTING CURB INLET ON
 THE WEST SIDE OF N. RAILROAD AVE AT 10TH ST.
  
 6. INDICATE WHAT HAPPENS TO THE EXISTING DRAINAGE
 SYSTEM IN THE INTERSECTION OF 9TH STREET AND N.
 RAILROAD AVE.
  
 7. INDICATE WHAT HAPPENS TO THE EXISTING DRAINAGE
 SYSTEM IN THE INTERSECTION OF 8TH STREET AND N.
 RAILROAD AVE.
  
 8. FOR THE ENGINEERING PERMIT SUBMITTAL, DEMONSTRATE
 THE CHANGE IN TRIBUTARY DRAINAGE AREA TO THE 9TH ST AND
 10TH STREET DRAINAGE SYSTEM WILL NOT CAUSE NEGATIVE
 IMPACTS TO THE DOWNSTREAM AREAS OF THESE SYSTEMS.
  
 9. STOP THE EXFILTRATION TRENCHES ON N. RAILROAD AVE.
 BEFORE THE ALLEY R/W.
  
 10. DESIGN OF THE TRANSITION GRADING TO EXISTING STREET
 SECTION WILL NEED TO BE PROVIDED WITH THE ENGINEERING
 PERMIT SUBMITTAL.
  
 11. DESIGN INFORMATION FOR STORM MH S-118 CUT OFF BY
 CROSS SECTION VIEW ON SHEET C2.2.
  
 12. INCLUDE THE SHEET NUMBER REFERENCE WITH THE
 MATCHLINE CALLOUTS SINCE SEVERAL SHEETS HAVE THE SAME
 MATCHLINE LETTERS.
  
 13. INCLUDE WITH THE ENGINEERING PERMIT SUBMITTAL AN
 EXFILTRATION TRENCH DETAIL SHOWING THE TOP AND BOTTOM
 ELEVATIONS OF THE TRENCH AND INVERT ELEVATION OF THE
 STORM PIPE AND THE WIDTH OF THE TRENCH.
  
 14. INCLUDE WITH THE ENGINEERING PERMIT SUBMITTAL A
 DETAIL OF THE CONTROL STRUCTURE FOR THE ROADWAY
 DRAINAGE SYSTEM. NOTE THE CITY DOES NOT ALLOW THE USE
 OF BLEEDERS FOR EXFILTRATION TRENCH SYSTEMS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved