| 2021-10-06 09:40:29 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE |
| | 8/5/2021 NORA STREETSCAPE PROJECT SUBMITTAL: |
| | |
| | 1. R/W CROSS SECTIONS A-A THROUGH F-F SHOW PAVERS |
| | INSTEAD OF VALLEY GUTTER AT EDGE OF TRAVEL LANES. THE |
| | HARDSCAPE PLAN DETAILS SHOW THE PAVERS OVER A CONCRETE |
| | VALLEY GUTTER. SHOW THE VALLEY GUTTER ON THE CROSS |
| | SECTIONS AND ADD A NOTE ON THE CIVIL PLANS TO REFER TO |
| | THE HARDSCAPE PLANS. |
| | |
| | 2. THE HARDSCAPE PLAN SHEET L1-110 SHOWS RAIL AT THE |
| | FRONT OF SIDEWALKS AND DOWN THE CENTER OF N. RAILROAD |
| | AVE. THE CROSS SECTIONS ON THE CIVIL PLANS ONLY SHOW |
| | THE RAILS AT THE FRONT OF SIDEWALKS. |
| | |
| | 3. LABEL THE R/W LINES ON THE CROSS SECTIONS A-A |
| | THROUGH F-F. SHOW EXISTING GROUND OUTSIDE THE R/W AND |
| | HOW SECTIONS WILL TRANSITION TO EXISTING GRADES. |
| | |
| | 4. WHEN REFERRING TO FDOT STANDARD DETAILS, USE THE |
| | STANDARD PLAN NUMBER INSTEAD OF THE STANDARD INDEX |
| | NUMBER. |
| | |
| | 5. INDICATE WHAT HAPPENS TO THE EXISTING DRAINAGE |
| | SYSTEM ON 10TH STREET AND THE EXISTING CURB INLET ON |
| | THE WEST SIDE OF N. RAILROAD AVE AT 10TH ST. |
| | |
| | 6. INDICATE WHAT HAPPENS TO THE EXISTING DRAINAGE |
| | SYSTEM IN THE INTERSECTION OF 9TH STREET AND N. |
| | RAILROAD AVE. |
| | |
| | 7. INDICATE WHAT HAPPENS TO THE EXISTING DRAINAGE |
| | SYSTEM IN THE INTERSECTION OF 8TH STREET AND N. |
| | RAILROAD AVE. |
| | |
| | 8. FOR THE ENGINEERING PERMIT SUBMITTAL, DEMONSTRATE |
| | THE CHANGE IN TRIBUTARY DRAINAGE AREA TO THE 9TH ST AND |
| | 10TH STREET DRAINAGE SYSTEM WILL NOT CAUSE NEGATIVE |
| | IMPACTS TO THE DOWNSTREAM AREAS OF THESE SYSTEMS. |
| | |
| | 9. STOP THE EXFILTRATION TRENCHES ON N. RAILROAD AVE. |
| | BEFORE THE ALLEY R/W. |
| | |
| | 10. DESIGN OF THE TRANSITION GRADING TO EXISTING STREET |
| | SECTION WILL NEED TO BE PROVIDED WITH THE ENGINEERING |
| | PERMIT SUBMITTAL. |
| | |
| | 11. DESIGN INFORMATION FOR STORM MH S-118 CUT OFF BY |
| | CROSS SECTION VIEW ON SHEET C2.2. |
| | |
| | 12. INCLUDE THE SHEET NUMBER REFERENCE WITH THE |
| | MATCHLINE CALLOUTS SINCE SEVERAL SHEETS HAVE THE SAME |
| | MATCHLINE LETTERS. |
| | |
| | 13. INCLUDE WITH THE ENGINEERING PERMIT SUBMITTAL AN |
| | EXFILTRATION TRENCH DETAIL SHOWING THE TOP AND BOTTOM |
| | ELEVATIONS OF THE TRENCH AND INVERT ELEVATION OF THE |
| | STORM PIPE AND THE WIDTH OF THE TRENCH. |
| | |
| | 14. INCLUDE WITH THE ENGINEERING PERMIT SUBMITTAL A |
| | DETAIL OF THE CONTROL STRUCTURE FOR THE ROADWAY |
| | DRAINAGE SYSTEM. NOTE THE CITY DOES NOT ALLOW THE USE |
| | OF BLEEDERS FOR EXFILTRATION TRENCH SYSTEMS. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| |