| Plan Review Notes For Project Z21040012 |
| Project Number |
Z21040012 |
|
| Review Stop |
ENG - PPRC |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2021-08-10 10:30:39 | COMMENTS PER RICK ROSSANO, PROJ. COORD. WPB ENG. | | | SERVICES, [email protected], 561-494-1098: | | | PLEASE SHOW DRY UTILITIES ON RAILROAD AVE. | | | PLEASE SHOW IRRIGATION DEMANDS ON ENGINEERING SHEET. | | | ON DEMO SHEET, PLEASE ADD NOTE TO PROTECT CATCH BASINS | | | ON RAILROAD AVE. ALONG PROJECT FRONTAGE. | | | | | | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | COMMENTS AS FOLLOWS FOR Z21040012: | | | -TRANSFORMER, IRRIGATION METERS, AND BACKFLOW | | | ASSEMBLIES APPEARS TO BE PROPOSED IN SAME LOCATION. | | | DISTANCE WATER METER BOXES AND BACKFLOW ASSEMBLIES AT | | | LEAST 3 FEET AWAY FROM TRANSFORMER. VERIFY NONE OF THEM | | | WILL HAVE CONFLICT WITH TREES EITHER. | | | -SHOW PROPOSED IRRIGATION METERS AND BACKFLOW | | | ASSEMBLIES ON CIVIL/ENGINEERING PLAN. | | | -SHOW PROPOSED SEWER MAIN RUNNING THROUGH PARKING LOT | | | ON CIVIL/ENGINEERING PLAN. VERIFY IT WILL NOT HAVE | | | CONFLICT WITH TREES. | | | -ADD NOTE TO IRRIGATION PLAN THAT BACKFLOW ASSEMBLIES | | | NEED TO BE RP TYPE, LEAD-FREE, AND MEET REQUIREMENTS OF | | | WATER SERVICE STANDARD DETAIL WS-6 REVISION SEP2019. | | | |
| |
Print |
|