| Plan Review Notes For Project Z21040007 |
| Project Number |
Z21040007 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2021-07-01 19:23:28 | NO FURTHER COMMENTS. | | | | | | 1) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC | | | CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) ON THE | | | OPPOSITE SIDE OF THE ROAD(S) SURROUNDING THE PROPOSED | | | DEVELOPMENT | | | 2) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE | | | TRUCK AND SERVICE VEHICLES PERFORMING THEIR OPERATIONS | | | AND DRIVING IN AND OUT OF THE PROPOSED DEVELOPMENT. | | | VEHICLE DYNAMIC ENVELOPES SHOULD BE CLEARLY DEPICTED. | | | ANALYSIS SHOULD BE PROVIDED IN A SEPARATE FILE/DRAWING | | | 3) SATISFIED. DRIVEWAY WIDTH CANNOT EXCEED 25 FEET. | | | PLEASE ADJUST PROPOSED ONES ACCORDINGLY. | | | 4) SATISFIED. INSERT IN THE PARKING TABLE THE REQUIRED | | | AND PROVIDED BICYCLE SPACES | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|