| Plan Review Notes For Project Z21040007 |
| Project Number |
Z21040007 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2021-07-27 16:04:48 | SITE PLAN APPROVED WITH THE FOLLOWING CONDITION: | | | | | | 1. REMOVE THE PIPED CONNECTIONS BETWEEN THE MAIN | | | STORMWATER MANAGEMENT SYSTEM (INCLUDING THE | | | EXFILTRATION SYSTEM) AND THE TRENCH DRAINS ACROSS THE | | | DRIVEWAYS AT THE BACK OF SIDEWALK. THIS PIPED | | | CONNECTIONS LIMIT THE HYDRAULIC HEAD THAT CAN BE | | | IMPOSED ON THE MAJOR EXFILTRATION SYSTEM. THE TRENCH | | | DRAINS WILL REDUCE THE AMOUNT OF STORMWATER RUNOFF | | | FLOWING FROM THE SITE ACROSS THE SIDEWALK AND SHOULD BE | | | CONNECTED TO SEPARATE EXFILTRATION TRENCHES OR | | | RETENTION AREA(S) TO TREAT THE STORMWATER RUNOFF | | | CAPTURED BY THE TRENCH DRAINS. | | | | | | |
| |
Print |
|