| Plan Review Notes For Project Z21040007 |
| Project Number |
Z21040007 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-05-07 11:30:55 | | | | 1) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS | | | (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE | | | OF THE ROAD(S) SURROUNDING THE PROPOSED DEVELOPMENT | | | 2) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND | | | SERVICE VEHICLES PERFORMING THEIR OPERATIONS AND | | | DRIVING IN AND OUT OF THE PROPOSED DEVELOPMENT. VEHICLE | | | DYNAMIC ENVELOPES SHOULD BE CLEARLY DEPICTED. ANALYSIS | | | SHOULD BE PROVIDED IN A SEPARATE FILE/DRAWING | | | 3) DRIVEWAY WIDTH CANNOT EXCEED 25 FEET. PLEASE ADJUST | | | PROPOSED ONES ACCORDINGLY. | | | 4) INSERT IN THE PARKING TABLE THE REQUIRED AND | | | PROVIDED BICYCLE SPACES | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | |
| |
Print |
|