Plan Review Notes
Plan Review Notes For Project Z21040007
Project Number Z21040007
Review Stop STORM
Sequence Number 1
Notes
Date Text
2021-05-08 23:23:07THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. PROVIDE CROSS SECTIONS FROM EACH PROPERTY LINE TO
 THE FACE OF THE BUILDING. THERE SHOULD NOT BE DIRECT
 RUNOFF ONTO ADJACENT PROPERTY OR ACROSS THE PUBLIC
 SIDEWALK.
  
 2. EXISTING STORM PIPE IN GEORGIA AVE IS 60? RCP, NOT
 24? RCP.
  
 3. THERE IS A 20? PCCP WATER MAIN NEAR THE EAST CURB OF
 GEORGIA AVE THAT MAY BE IN CONFLICT WITH THE PROPOSED
 STORM OUTFALL PIPE.
  
 4. WHAT IS THE PERIMETER BERM ELEVATION? THE GRATE
 ELEVATION OF THE PROPOSED TRENCH DRAINS SHOULD NOT BE
 LOWER THAN THE PERIMETER BERM ELEVATION.
  
 5. PRBS SHOULD BE USED IN STRUCTURES CONNECTED TO
 EXFILTRATION TRENCHES AND ON THE OUTFALL PIPE.
  
 6. IS THE PROPOSED FIRE HYDRANT NECESSARY? THERE IS AN
 EXISTING FH LESS THAN 200 FEET SOUTH ON THE WEST SIDE
 OF GEORGIA AVE. ON-STREET PARKING SPACES CANNOT BE
 WITHIN 18 FEET OF THE CENTER PLUG OF THE FH.
  
 7. ADD DRAINAGE FLOW ARROWS ON THE CONCEPTUAL PAVING,
 GRADING AND DRAINAGE PLAN.
  
 8. CONSIDER REDUCING THE LENGTH OF THE PARKING SPACES
 AND PROVIDE 2 FEET OF LANDSCAPED OVERHANG.
  
 9. SHOW SIDEWALK REPLACEMENT WHERE UTILITIES WILL BE
 CONSTRUCTED ACROSS THE SIDEWALK.
  
 10. THE SLOPE OF THE SIDEWALK ADJACENT TO THE NORTH
 DRIVEWAY APPEARS TO EXCEED 5% AND MAY BE CONSIDERED A
 RAMP AND REQUIRE A HANDRAIL.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP BEFORE THE START OF
 CONSTRUCTION.
  
 4. DRAINAGE CALCULATIONS WILL BE REVIEWED WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  