Plan Review Notes
Plan Review Notes For Project Z21040002
Project Number Z21040002
Review Stop TRAFFIC
Sequence Number 1
Notes
Date Text
2021-05-07 11:54:55TRAFFIC COMMENTS
 1) PROVIDE TRAFFIC STUDY
 2) PROVIDE COUNTY TPS LETTER
  
 SITE COMMENTS
 1) EXPLAIN THE CHANGE IN DRIVEWAY DIRECTIONALITY ON THE
 NORTHERN SIDE OF THE PARKING LOT. OTHERWISE REVERT TO
 ORIGINAL CONFIGURATION.
 2) ALIGN PARKING AISLES' CENTERLINES WITH THE NORTHERN
 DRIVEWAY LANE ONES
 3) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS
 (I.E. DRIVEWAY AND PARKING STALLS) ON THE OPPOSITE SIDE
 OF THE ROADS SURROUNDING THE PROPOSED DEVELOPMENT
 4) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY
 DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE
 FILE/DRAWING
 5) IDENTIFY AND DESIGNATE AN EASILY ACCESSIBLE
 MICRO-MOBILITY STATION AREA (MINIMUM 8 X 20 FEET) AND
 PROVIDE BASIC ELECTRIFICATION READINESS (CIRCUIT BOX
 AND ELECTRIC CONDUIT)
 6) PROVIDE PARKING TABLE SHOWCASING THE NUMBER OF
 REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA
 AND BICYCLE ONES
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved