| 2021-05-07 16:18:58 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER |
| | 561-822-1462 |
| | PROJECT: SOUTHDALE PLAZA PUBLIX Z21040002 |
| | MAY 7, 2021 |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. PER SECTION 94-441(C)(2), THE VALUE OF THE PERMIT |
| | WILL EXCEED 50% OF THE VALUE OF THE STRUCTURE, SO THE |
| | SITE MUST BE BROUGHT INTO COMPLIANCE WITH THE CURRENT |
| | LANDSCAPE CODE REQUIREMENTS. |
| | |
| | 2. REQUIRED OPEN SPACE FOR THIS ZONING CATEGORY TO |
| | CALCULATE REQUIRED TREES, FLOWERING TREES AND SHRUBS |
| | PER SECTION 94-442(C)(2)B. AND (3) IS 40% OF THE ENTIRE |
| | SITE. REFLECT THIS SQUARE FOOTAGE ON THE SITE DATA AND |
| | LANDSCAPE CALCULATIONS. |
| | |
| | 3. SECTION 94-443 (C)(3)A. REQUIRES A TERMINAL |
| | LANDSCAPE ISLAND AND REQUIRED TREE FOR EACH ROW OF |
| | PARKING. (3)B. REQUIRES AN INTERIOR LANDSCAPE ISLAND |
| | WITH A REQUIRED TREE SO THERE ARE NO MORE THAN 10 |
| | SPACES IN A ROW. ALL THESE LANDSCAPE AREAS MUST MEET |
| | THE MINIMUM WIDTH OF 8 FEET OF LANDSCAPE AREA AND BE |
| | THE FULL LENGTH OF THE ADJACENT SPACE. (3) C. REQUIRES |
| | DIVIDER MEDIANS WHERE THERE ARE MORE THAN 3 CONSECUTIVE |
| | ROWS OF PARKING. ALL AREAS OF PARKING MUST MEET THESE |
| | REQUIREMENTS. |
| | |
| | 4. SECTION 94-443(C)(3) REQUIRES THAT A MINIMUM OF 75 |
| | PERCENT OF ALL TREES THAT ARE REQUIRED TO BE PLANTED |
| | WITHIN THE INTERIOR OF AN OFF STREET PARKING AREA SHALL |
| | BE CATEGORY 1 SHADE TREES. SHOW THE PERCENTAGE OF |
| | CATEGORY 1 TREES PROVIDED FOR THE REQUIRED LANDSCAPE |
| | AREAS AS REQUIRED BY SECTION 94-443(C)(3) FOR DIVIDER |
| | ISLANDS, TERMINAL, AND INTERIOR ISLANDS. THE ONLY TREE |
| | SPECIES LISTED ON THE PLANT LIST THAT ARE CATEGORY 1 |
| | ARE THE LIVE OAK TREES. |
| | |
| | 5. PROVIDE A PLAN SHOWING THE PARKING LANDSCAPE AREAS |
| | COUNTED TOWARD COMPLIANCE WITH SECTION 94-443(C)(3) AND |
| | (4) AND PROVIDE CALCULATIONS. PROVIDE THE TOTAL |
| | REQUIRED AND PROVIDED AS ONE TOTAL FOR BOTH SECTIONS. A |
| | SEPARATE EXHIBIT PLAN MUST BE PROVIDED TO SHOW THE |
| | AREAS COUNTED FOLLOWING THE DESCRIPTION OF AREAS AS |
| | SHOWN IN FIGURE XIV-1. |
| | |
| | 6. THE TREE DISPOSITION CHART IS TO BE CORRECTED TO |
| | SHOW COCONUT PALMS AS CATEGORY 3 WITH 100 SQ FT CANOPY |
| | MITIGATION DUE. |
| | |
| | 7. PER SECTION 94-443(B), BUFFER LENGTHS REQUIRE ONE |
| | TREE PER 30 FEET OR PORTION THEREOF FOR EACH BUFFER |
| | LENGTH AND A CONTINUOUS HEDGE. PROVIDE THE REQUIRED AND |
| | PROVIDED BUFFER TREES IN A CHART WITH THE INDIVIDUAL |
| | BUFFER SECTIONS IDENTIFIED AND THE BUFFER LENGTH EQUAL |
| | TO THE SURVEY LENGTH. |
| | |
| | 8. BUFFERS NEED TO BE CONVERTED TO LANDSCAPE AREA FOR |
| | REQUIRED TREES AND HEDGES ON THE EAST AND WEST SIDES OF |
| | THE PROPERTY. THE CRAPE MYRTLE TREES ALONG SOUTHERN |
| | BOULEVARD WERE PLANTED BY THE PROPERTY OWNER AND ARE |
| | PART OF THE LANDSCAPING FOR THE SITE. THE NORTH 5 FOOT |
| | LANDSCAPE BUFFER SHOULD BE CREATED INSIDE THE PROPERTY |
| | LINE AND MEET THE REQUIREMENTS. THE RIGHT OF WAY |
| | PLANTINGS WILL BE ACCEPTED TO MEET THE REQUIREMENTS OF |
| | SECTION 94-452 ROADWAY BEAUTIFICATION. |
| | |
| | 9. PER SECTION 94-443 (E)1., PROVIDE THE FOUNDATION |
| | PLANTING CALCULATION REQUIRED AND PROVIDED FOR THE |
| | ENTIRE BUILDING. |
| | |
| | |
| | 10. PROVIDE THE NUMBER AND PERCENTAGE OF SUBSTITUTION |
| | OF PALMS FOR REQUIRED TREES. SECTION 94-442(D) REQUIRES |
| | A 3:1 RATIO FOR SUBSTITUTION FOR PALMS EXCEPT THE |
| | LISTED 1:1 SPECIES. |
| | |
| | 11. RECALCULATE THE SECTION IN THE LANDSCAPE DATA CHART |
| | TO COMPLY WITH SECTION 94-445 L. PLANT SPECIES. A |
| | MINIMUM OF 60 PERCENT OF PLANT MATERIAL ADDED SHALL BE |
| | FLORIDA NATIVE OR DROUGHT TOLERANT SPECIES SELECTED |
| | FROM THE CITY LIST OR THE LIST OF SPECIES IN THE MOST |
| | RECENT EDITION OF SOUTH FLORIDA WATER MANAGEMENT |
| | DISTRICT WATERWISE SOUTH FLORIDA LANDSCAPES. PROVIDE |
| | THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT TOLERANT |
| | PLANTS BASED ON FINAL PLANT LIST. |
| | |
| | |
| | 12. SHOW THE LOCATIONS OF ALL SITE LIGHTING ON THE |
| | LANDSCAPE PLAN AND REDESIGN THE LOCATIONS OF THE |
| | LIGHTING ON SHORTER POLES TO RESOLVE ANY CONFLICTS WITH |
| | TREES IN THE PARKING AREA LANDSCAPE ISLANDS. |
| | |
| | 13. SHOW THE LOCATIONS OF ALL UTILITIES ON THE |
| | LANDSCAPE PLAN, THERE ARE MULTIPLE CONFLICTS WITH TREES |
| | PER THE CIVIL DRAWINGS. |
| | |
| | 14. PROVIDE SCREENING FOR ALL GROUND MOUNTED VALVES AND |
| | EQUIPMENT. |
| | |
| | 15. SHOW LOCATIONS OF FPL TRANSFORMERS ON THE LANDSCAPE |
| | PLAN AND RESOLVE CONFLICTS WITH LANDSCAPING. |
| | |
| | CONDITIONS OF APPROVAL |
| | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE |
| | STREET TREES AND RIGHT OF WAY LANDSCAPING AND |
| | IRRIGATION APPROVED WITH THIS PETITION. |
| | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF |
| | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A |
| | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. |
| | |
| | |
| |