Plan Review Notes
Plan Review Notes For Project Z21030022
Project Number Z21030022
Review Stop Z
Sequence Number 4
Notes
Date Text
2021-07-29 10:44:29PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW
 ________________________________________
  
 DATE OF REVIEW: 07.29.2021
 PROJECT NO.: Z21030022
 CASE NO.: FSPR 21-02
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING
 REVIEW COMMENTS:
  
 1. [ SATISFIED ] - ARE THERE ANY HISTORIC ELEMENTS FROM
 THE PREVIOUS GOLF COURSE/CLUBHOUSE THAT COULD BE
 INCORPORATED INTO THE NEW FACILITIES?
  
 1.1 [ SATISFIED ] - NUMEROUS ITEMS FROM THE OLD
 CLUBHOUSE/COURSE HAVE BEEN LOCATED. TOM FRANKEL HAS
 BEEN MADE AWARE AND IS TO BE COORDINATING A REVIEW,
 EVALUATION, ETC. NO COORDINATION HAS OCCURRED TO DATE.
  
 2. [ SATISFIED ] - THE NETTING, IF LOCATED WITHIN A
 SETBACK, SHALL NOT EXCEED THE MAXIMUM FENCE HEIGHT
 PROVIDED IN SEC. 94-302.C.1. IF LOCATED OUTSIDE OF THE
 SETBACK, THE NETTING/POLES SHALL NOT EXCEED THE MAXIMUM
 HEIGHT PERMITTED WITHIN THE ZONING DISTRICT, AS
 PROVIDED IN SEC. 94-204.5.
  
 2.1 [ SATISFIED ] - VARIANCE IN-PROCESS (ZBA CASE NO.
 3394).
  
 3. [ SATISFIED ] - PHOTOMETRIC PLANS SHALL BE PROVIDED
 AND SHALL INDICATE COMPLIANCE WITH SEC. 94-309.A., AS
 ALSO REQUIRED BY SEC. 94-273.D.60.B.4. ALL OUTDOOR
 LIGHTING SHALL BE SHIELDED TO REDUCE GLARE AND SHALL BE
 ARRANGED TO REFLECT LIGHT OR GLARE AWAY FROM ALL
 ADJACENT RESIDENTIAL DISTRICTS, ADJACENT RESIDENCES, OR
 PUBLIC THOROUGHFARES.
  
 3.1 [ SATISFIED ] - ON THE PHOTOMETRIC PLANS FOR THE
 DRIVING RANGE / PAR 3 COURSE, PLEASE PROVIDE THE
 PHOTOMETRIC LEVELS AT THE PROPERTY LINE TO SHOW THE
 IMPACT OF THE SHIELDING, ETC. LEVELS SHOULD NOT EXCEED
 0.5 FOOTCANDLES WHEN MEASURED ON THE PROPERTY ADJACENT
 TO A RESIDENTIAL NEIGHBORHOOD.
  
 3.1.1 [ SATISFIED ] - THERE IS ONE AREA WHERE THE
 LEVELS ARE 0.6 FOOTCANDLES.
  
 4. [ SATISFIED ] - FENCES/WALLS PROPOSED WITHIN THE
 FRONT SETBACK SHALL NOT EXCEED FOUR (4) FEET IN HEIGHT.
 FENCES/WALL LOCATED WITHIN OTHER SETBACKS SHALL NOT
 EXCEED SIX (6) FEET IN HEIGHT.
  
 4.1 [ SATISFIED ] - VARIANCE IN-PROCESS (ZBA CASE NO.
 3394).
  
 5. [ SATISFIED ] - ENSURE THAT THERE ARE NO CONFLICTS
 BETWEEN THE PROPOSED LANDSCAPING AND FENCING WITH THE
 EXISTING 60 INCH DRAINAGE PIPE IN THE NORTHEAST CORNER
 OF THE SITE. ANY IMPROVEMENTS PROPOSED WITHIN THE
 REQUIRED EASEMENT WILL NEED TO BE APPROVED BY THE
 EASEMENT HOLDER.
  
 5.1 [ SATISFIED ] - NEW FENCING IS BEING PROPOSED TO BE
 INSTALLED AT THE SOUTHEAST END OF THE EASEMENT
 (ADJACENT TO GEORGIA AVENUE). CONSENT FROM THE CITY'S
 PUBLIC UTILITIES DEPARTMENT WILL BE REQUIRED.
  
 6. [ SATISFIED ] - THE ENGINEERING PLANS SHOW CURBING
 GOING ACROSS THE FRONT OF THE DUMPSTER ENCLOSURE.
  
 7. [ SATISFIED ] - WHAT IS THE REASONING FOR EXTENDING
 THE ASPHALT PARKING LOT ALL THE WAY TO THE NORTHEAST
 CORNER OF THE OFFICE BUILDING? IS THIS A
 LOADING/UNLOADING AREA? IS THERE GOING TO BE STORAGE?
 DEPENDING UPON THE RESPONSE, SCREENING MAY BE REQUIRED.
 ADDITIONALLY, A TURNAROUND PARKING SPACE NEEDS TO BE
 PROVIDED AS THIS IS A DEAD-END ROW OF PARKING.
  
 8. [ SATISFIED ] - WITH UNDERSTANDING THAT THE
 APPLICANT WILL CONTINUE TO WORK WITH THE CITY ON
 PEDESTRIAN CONNECTIVITY ALONG GEORGIA AVENUE ] - A
 SIDEWALK SHALL BE PROVIDED ON GEORGIA AVENUE CONNECTING
 THE SITE TO THE EXISTING SIDEWALK NETWORK.
  
 9. [ SATISFIED ] - AN INCREASED AND ENHANCED BUFFER
 NEEDS TO BE PROVIDED ALONG MADDOCK STREET AND GEORGIA
 AVENUE (INCREASE LANDSCAPING, NEW FENCING, ETC.). THIS
 WILL BE A PART OF FURTHER DISCUSSION WITH STAFF.
  
 10. [ SATISFIED ] - DETAILS SHALL BE PROVIDED FOR ALL
 SCREEN WALLS AND GATES AROUND THE LOADING/TRASH SERVICE
 AREA, ETC. ARE THESE SCREEN WALLS ABOVE GRADE? ARE THEY
 RETAINING WALLS? BOTH?
  
 10.1 [ SATISFIED ] - WHILE YOUR NARRATIVE DESCRIBES
 THIS AREA, A DETAIL OR CROSS-SECTION SHOULD BE
 PROVIDED.
  
 11. [ SATISFIED ] - IT IS SUGGESTED THAT PARKING SPACES
 ADJACENT TO LANDSCAPING BE MADE 16 FEET IN LENGTH WITH
 THE USE OF A CURB (NO WHEEL STOP) AND THAT THE
 LANDSCAPE AREA BE INCREASED IN SIZE TO ACCOMMODATE THE
 OVERHANG.
  
 11.1 [ SATISFIED ] - THERE APPEAR TO BE A FEW
 ADDITIONAL SPACES WHERE THE LANDSCAPE ISLAND CAN BE
 ENLARGED TO ALLOW THE OVERHANG. PLEASE CONTACT ME FOR
 SPECIFIC LOCATIONS.
  
 12. [ SATISFIED ] - NEED TO SHOW LOCATIONS FOR BIKE
 RACKS AND THE DATA TABLE NEEDS TO BE UPDATED TO SHOW
 COMPLIANCE WITH THE QUANTITY OF BIKE RACKS. BIKE RACKS
 SHOULD BE DISTRIBUTED AMONGST THE VARIOUS BUILDINGS
 (OFFICE, CLUBHOUSE, MAINTENANCE, ETC.).
  
 12.1 [ SATISFIED ] - THE NUMBER OF SPACES IN THE TABLE
 DO NOT APPEAR TO MATCH WHAT IS DRAWN ON THE SITE PLAN.
 ACCORDING TO THE SITE PLAN, THERE ARE FOUR (4) SPACES
 AT THE MAINTENANCE FACILITY, NOT TWO (2), THEREBY
 RESULTING IN 16 TOTAL BICYCLE SPACES. THE TABLE AND THE
 LABEL ON THE BICYCLE SPACES AT THE MAINTENANCE FACILITY
 NEED TO BE CORRECTED ACCORDINGLY.
  
 13. [ PARTIALLY SATISFIED ] - PLANS NEED TO SHOW THE
 LOCATIONS FOR ALL STOP BARS, CROSSWALKS, ETC.
  
 13.1 [ NOT SATISFIED ] - A STOP BAR IS MISSING
 SOUTHEAST OF THE DUMPSTER ENCLOSURE. ADDITIONALLY, A
 STOP BAR WOULD EITHER NEED TO BE PROVIDED AT THE DRIVE
 AISLE TO THE SOUTHWEST OF THE DUMPSTER, OR THE ONE
 IMMEDIATELY SOUTH OF THE DUMPSTER.
  
 13.1.1 [ NOT SATISFIED ] - THE PAVEMENT MARKINGS ON THE
 SITE PLAN DO NOT MATCH WHAT IS SHOWN ON THE CIVIL
 PLANS.
  
 14. [ SATISFIED ] - IT APPEARS THAT THERE IS A PARKING
 SPACE IN FRONT OF THE OFFICE BUILDING DUMPSTER THAT
 WOULD CONFLICT WITH THE GATES ON THE ENCLOSURE.
  
 15. [ SATISFIED ] - IS PUBLIC WORKS GOING TO BE
 ACCEPTABLE OF THE LOCATION OF THE DUMPSTER BY THE
 OFFICE BUILDING? THIS SEEMS TO BE A LOT OF BACK-OUT
 REQUIRED. PLEASE OBTAIN CONFIRMATION.
  
 16. [ SATISFIED - SUBJECT TO CONDITION OF APPROVAL ] -
 IMPROVEMENTS AT THE MAINTENANCE FACILITY ARE SHOWN IN
 THE ACCESS EASEMENT. EITHER THE IMPROVEMENTS NEED TO BE
 MOVED TO OUTSIDE THE EASEMENT, OR CONSENT FROM THE
 EASEMENT HOLDER SHALL BE PROVIDED.
  
 17. [ SATISFIED ] - DETAILS FOR CHAIN LINK FENCING
 SHALL BE PROVIDED (HEIGHT, ETC.) AND SHALL COMPLY WITH
 MAXIMUM FENCE HEIGHT REQUIREMENTS.
  
 18. [ SATISFIED ] - WITH UNDERSTANDING THAT BUILDING
 DIVISION HAS INDICATED NO ROUTE IS REQUIRED ] - DOES
 THE MAINTENANCE FACILITY NEED AN ACCESSIBLE ROUTE FROM
 THE PUBLIC RIGHT-OF-WAY? PLEASE CONFIRM.
  
 19. [ SATISFIED ] - SYMBOLOGY APPEARS TO BE MISSING
 FROM THE ACCESSIBLE PARKING SPACE AT THE MAINTENANCE
 FACILITY.
  
 20. [ SATISFIED ] - WHAT IS THE ACCESSIBLE ROUTE FROM
 THE ACCESSIBLE PARKING SPACE TO THE ACCESSIBLE BUILDING
 ENTRANCE?
  
 21. [ SATISFIED ] - DETAILS SHALL BE PROVIDED FOR THE
 SCREENING PROPOSED AROUND THE STORAGE BINS.
  
 22. [ SATISFIED ] - THE DIMENSIONS OF THE DUMPSTER AT
 THE MAINTENANCE FACILITY DO NOT SEEM TO MATCH THAT
 SHOWN FOR THE DUMPSTER DETAIL. A SEPARATE DETAIL MAY
 NEED TO BE PROVIDED.
  
 22.1 [ SATISFIED ] - IS THE MAINTENACE FACILITY
 DUMPSTER TO BE PICKED UP BY A PRIVATE PROVIDER? PLEASE
 CLARIFY.
  
 23. [ SATISFIED ] - COVERED OUTDOOR STORAGE AT THE
 MAINTENANCE FACILITY NEEDS TO BE SCREENED IN ACCORDANCE
 WITH SEC. 94-315.B.1. WHAT IS PROPOSED TO BE STORED IN
 THIS AREA?
  
 24. [ SATISFIED ] - PLEASE NOTE THAT THE DEDICATION OF
 ANY RIGHT-OF-WAY WILL CHANGE THE PROPERTY LINE AND
 THEREBY CHANGE THE MEASUREMENT OF ANY SETBACKS, ETC.
  
 24.1 [ SATISIFIED ] - YOUR NARRATIVE INDICATES THAT NO
 RIGHT-OF-WAY IS BEING DEDICATED AS PART OF THIS
 PROJECT...HAS IT BEEN CONFIRMED THAT NO RIGHT-OF-WAY
 WILL BE DEDICATED TO ACCOMMODATE THE EXISTING
 ROUNDABOUT AT THE SOUTHER TERMINUS OF PARKER AVENUE?
  
 25. [ SATISFIED ] - THE SIDEWALK THAT LEAVES THE
 TERRACE ON THE SOUTHEAST CORNER OF THE CLUBHOUSE, WHERE
 IS IT GOING TO? WHAT IS IS CONNECTING TO?
 ________________________________________
  
 PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING:
  
 A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL
 DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION.
  
 B) ELECTRONIC COPY OF ALL REVISED PLANS AND/OR
 DOCUMENTS SHALL BE PROVIDED.
  
 C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO
 ADDITIONAL COMMENTS.
  
 D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE
 ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE
 CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL
 REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved