| 2021-05-07 11:26:14 | TRAFFIC COMMENTS |
| | 1) SATISFIED. PROVIDE COUNTY TPS LETTER |
| | 2) NOT SATISFIED. PER COUNTY RECOMMENDATION, ANALYZE |
| | IMPLEMENTATION OF A RIGHT-RUN LANE FROM FOREST HILL |
| | BLVD TO GEORGIA AVE ALONG THE WEST APPROACH. |
| | 3) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS |
| | SHOWCASING GARBAGE TRUCK AND SERVICE VEHICLES PATHS IN |
| | AND OUT OF THE FACILITY. LATEST SUBMISSION SHOWCASES |
| | ENCROACHMENT AT THE ACCESS DRIVEWAY. |
| | 4) NOT SATISFIED. IS THE PERFORMANCE CENTER PART OF THE |
| | DEVELOPMENT? IF SO, PLEASE INCLUDE ITS IMPACT IN THE |
| | TRAFFIC STUDY |
| | |
| | SITE COMMENTS |
| | 5) NOT SATISFIED. INSTALL PEDESTRIAN REFUGEE ISLAND AT |
| | THE ACCESS DRIVEWAY |
| | 6) NOT SATISFIED. DRIVEWAY ENTRY AND EXIT LANE CAN?T BE |
| | MORE THAN 12 FEET WIDE. A PEDESTRIAN REFUGEE ISLAND |
| | SHOULD BE IMPLEMENTED IN ORDER TO MITIGATE THE PROPOSED |
| | 20 FEET WIDE OUTBOUND LANE. |
| | 7) NOT SATISFIED. GIVEN THE WIDTH OF THE PROPOSED |
| | OUTBOUND LANE, IT IS RECOMMENDED TO SPLIT IT INTO TWO |
| | 10-FOOT LANES AND INSTALL PAVEMENT MARKINGS FOR |
| | LEFT-ONLY AND RIGHT-ONLY MOVEMENTS |
| | 8) NOT SATISFIED. PROVIDE BICYCLE FACILITIES ACCORDING |
| | TO CITY MASTER PLAN |
| | O BIKE LANES/MULTIUSE PATH ALONG GEORGIA AVE/GREGORY RD |
| | O SHARROW ALONG MADDOCK ST |
| | O TRAIL THROUGH OR AROUND THE PROPOSED GOLF COURSE |
| | STARTING FROM GREGORY RD, ALONG THE SOUTH SIDE CANAL |
| | THEN HEADING NORTH PARALLEL TO I-95 |
| | 9) NOT SATISFIED. IF A SIDEWALK OR MULTIUSE PATH IS |
| | ESTABLISHED ON THE WEST SIDE OF GEORGIA AVE, EXTEND IT |
| | ALONG THE SOUTH SIDE OF GREGORY RD TO THE RR TRACKS AND |
| | PROVIDE A CROSSWALK TO CONNECT TO THE NORTH SIDE |
| | SIDEWALK |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| |