Notes
Date Text
2021-06-10 14:40:34THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 5/7/2021 SUBMITTAL:
  
  
 1. [PARTIALLY SATISFIED] ADD SCALE BAR TO THE
 GOLFCOURSE AND CLUBHOUSE ENGINEERING PLANS TO
 FACILITATE REVIEWING PLANS ON THE COMPUTER. [ADDITONAL
 COMMENTS: ONLY A FEW OF THE GOLF COURSE GRADING PLANS
 HAD A SCALE BAR. MOST OF THE SHEETS LABEL THE SCALE AS
 1" = 30 FEET BUT THE SCALE BAR ON THE SHEET ARE AT
 50-FT INCREMENTS (THOUGH THEY MAY PLOT TO SCALE). TO
 AVOID CONFUSION BETWEEN THE SCALE BAR AND LISTED SCALE,
 THE SCALE BAR MAJOR INCREMENTS SHOULD BE WHAT IS LISTED
 AS THE PAGE SCALE.]
  
 2. [SATISFIED] UPDATE THE UTILITIES SHOWN ON THE
 CLUBHOUSE SITE PLAN AND LANDSCAPE PLANS TO SHOW WHAT IS
 SHOWN ON THE ENGINEERING PLANS.
  
 3. [SATISFIED] SHOW THE EXISTING 60-INCH DIAMETER STORM
 PIPE AND ANY OTHER EXISTING UTILITIES ON THE LANDSCAPE
 PLANS.
  
 4. [SATISFIED] CONSIDER REDUCING THE LENGTH OF PARKING
 SPACES BY TWO FEET AND PROVIDE TWO FEET OF LANDSCAPED
 AREA OVERHANG.
  
 5. [SATISFIED] ADD ADDITIONAL SPOT GRADES, CONTOURS OR
 CROSS SECTIONS TO THE CLUBHOUSE PGD PLANS TO INDICATE
 HOW THE DEVELOPMENT WILL MEET EXISTING GRADES.
  
 6. [SATISFIED] CONFIRM THESE IS NOT AN OUTFALL PIPE FOR
 THE CLUBHOUSE DRAINAGE SYSTEM.
  
 7. [SATISFIED] CONSIDER COMBINING THE TWO INLETS AT THE
 CLUBHOUSE ENTRANCE AS ONE CATCH BASIN INLET IN THE
 LANDSCAPED MEDIAN WITH FLUMES TO GET THE STORMWATER
 RUNOFF INTO THE MEDIAN.
  
 8. [PARTIALLY SATISFIED] DRAINAGE STRUCTURES UPSTREAM
 AND DOWNSTREAM OF EXFILTRATION TRENCHES SHOULD HAVE
 PRB?S TO PROLONG THE USEFUL LIFE OF THE EXFILTRATION
 TRENCHES. [ADDITIONAL COMMENT - CATCH BASIN AT GEORGIA
 AVE ENTRANCE WILL NEED A PRB. THIS CAN BE ADDRESSED
 WITH ENGINEERING PERMIT APPLICATION.]
  
 9. [SATISFIED] LABEL THE SOIL CONTAMINATION AREA ON
 SHEET GP-7.
  
 10. [NOT SATISFIED] SHOW AND LABEL THE SPOIL PILE
 EASEMENT, SFWMD C-51 SEDIMENT PROJECT EASEMENT AND
 SFWMD ACCESS EASEMENT ON SHEETS GP-7 AND GP-8.
 [ADDITONAL COMMENT: THIS CAN BE ADDRESSED WITH THE
 ENGINEERING PERMIT APPLICATION.]
  
 11. [PARTIALLY SATISFIED] ENSURE THE IMPROVEMENTS AND
 GRADING WITHIN THE SFWMD EASEMENTS WILL NOT RESTRICT
 ACCESS TO THE EASEMENTS AND SPOIL PILE EASEMENT.
 [ADDITIONAL COMMENT - WILL NEED THE EASEMENTS SHOWN ON
 THE GRADING PLAN TO CONFIRM.]
  
 12. [SATISFIED] PROVIDE A DETAIL OF THE CONTROL
 STRUCTURE FOR THE PROPOSED LINED LAKE [ADDITIONAL
 COMMENT - PLANS DO NOT SHOW AN OUTFALL FROM THE LAKE TO
 THE C-51 CANAL.]
  
 13. [PARTIALLY SATISFIED] WILL SUPPLEMENTAL WATER BE
 ADDED TO THE PROPOSED LINED LAKE DURING THE DRY SEASON
 TO MAINTAIN THE LITTORAL PLANTINGS? [ADDITIONAL COMMENT
 - RESPONSE LETTER FROM DEVELOPER'S APPLICANT INDICATED
 AN IRRIGATION LINE WILL BE DISCHARING INTO THE LINED
 LAKE. CHECK WITH SFWMD TO SEE IF THIS USE OF IRRIGATION
 WATER (WHETHER FROM A WELL OR OTHER SOURCE) WILL IMPACT
 THE ALLOWABLE WITHDRAWABLE FROM THE C-51 CANAL.]
  
 14. [NOT SATISFIED] ON SHEET ESC:[ADDITIONAL COMMENT: -
 THE FOLLOWING CAN BE INCLUDED WITH THE ENGINEERING
 PERMIT APPLICATION]
 A. SHOW PROTECTION OF THE CATCH BASIN IN THE EXISTING
 DRY DETENTION AREA IN THE SOUTHEAST CORNER OF THE SITE.
 B. SHOW FLOATING TURBIDITY BARRIER ON THE EXISTING AND
 PROPOSED OUTFALLS IN THE C-51 CANAL.
  
 15. [SATISFIED] THE GOLF COURSE DRAINAGE CALCULATIONS
 SUMMARY PAGE LISTS THE 5-YR 1-DAY POST-DEVELOPMENT PEAK
 STAGE BUT THIS DESIGN STORM DOES NOT APPEAR IN THE
 ANALYSIS.
  
 NEW COMMENT:
  
 16. FOR SECTION A-A ON SHEET C2.0, SHOW A SWALE BEFORE
 THE PROPERTY LINE TO CAPTURE ANY STORMWATER RUNOFF AND
 TO PREVENT DIRECT RUNOFF ONTO THE ADJACENT PARCEL.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved