| Plan Review Notes For Project Z21030022 |
| Project Number |
Z21030022 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-04-08 11:33:13 | TRAFFIC SITE COMMENTS ARE MODIFIED BELOW PER | | | ENGINEERING: | | | | | | COMMENTS # 3, 3A, 3B, 3C AND #6 ARE HEREBY DELETED. | | | | | | | | 2021-04-05 11:47:14 | | | | TRAFFIC COMMENTS | | | 1) PROVIDE COUNTY TPS LETTER | | | 2) PROVIDE AUTOTURN ANALYSIS SHOWCASING GARBAGE TRUCK | | | AND SERVICE VEHICLES PATHS IN AND OUT OF THE FACILITY | | | | | | SITE COMMENTS | | | 3) PROVIDE BICYCLE FACILITIES ACCORDING TO CITY MASTER | | | PLAN | | | 3A. BIKE LANES/MULTIUSE PATH ALONG GEORGIA AVE/GREGORY | | | RD | | | 3B. SHARROW ALONG MADDOCK ST | | | 3C. TRAIL THROUGH OR AROUND THE PROPOSED GOLF COURSE | | | STARTING FROM GREGORY RD, ALONG THE SOUTH SIDE CANAL | | | THEN HEADING NORTH PARALLEL TO I-95 | | | 4) DRIVEWAY ENTRY AND EXIT LANE CAN?T BE MORE THAN 12 | | | FEET WIDE | | | 5) INSTALL PEDESTRIAN REFUGEE ISLAND AT THE DRIVEWAY | | | 6) IF A SIDEWALK OR MULTIUSE PATH IS ESTABLISHED ON THE | | | WEST SIDE OF GEORGIA AVE, EXTEND IT ALONG THE SOUTH | | | SIDE OF GREGORY RD TO THE RR TRACKS AND PROVIDE A | | | CROSSWALK TO CONNECT TO THE NORTH SIDE SIDEWALK | | | 7) IS THE PERFORMANCE CENTER PART OF THE DEVELOPMENT? | | | IF SO, PLEASE INCLUDE ITS IMPACT IN THE TRAFFIC STUDY | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | |
| |
Print |
|